An issue workflow gives one category of GRC issue its own states, layout, trigger and approval gates. Create it against a table, attach a layout, state model and optional playbook, map states to stages, set the trigger and priority, then review and activate. Approvals can hold an issue at a state or gate a due date extension.
Roles and building blocks
Configuration requires the sn_grc_issue_mgmt.issue_workflow_admin role. The sn_grc_issue_mgmt.issue_workflow_reader role is the one needed to open the same workflow list from a product workspace such as Risk Workspace: open the Lists icon, expand Issue Administration and select Issue workflows. Approving requests uses the separate sn_grc_appr.approver permission. Who should hold these roles is a separate design decision, covered in the roles and RACI guide.
Each workflow draws on three components:
| Component | What it controls |
|---|---|
| Layout | Fields, sections, header and vertical navigation on the issue |
| State model | Lifecycle states and the rules for moving between them |
| Playbook | Guided activities a user works through (optional; can stay set to None) |
Creating the workflow and its state model
Go to All, then GRC Issue Administration, then Issue Workflows, and select New. Enter a Name that states the issue type and purpose, an optional Description, and the Table. The workflow applies to issues created on that table, so a vendor risk workflow and a compliance workflow need separate records. It replaces the table’s default handling for matching issues. After Save and continue, the workflow sits In Progress until you activate it. For how this fits a wider programme, see the GRC best practices.
A GRC state model is a separate record, created under GRC State Model, then GRC State Models. Enter a Name, the Table name, and the State model field, which names the field on the target table that stores the applicable model. The State field usually defaults to State [state]. Application defaults to Global, and Active is selected by default. The model is saved without states.
Add states from the GRC Workflow States related list and set a sequence number for each, which controls display order. Display type places a state as a node or as a sub-level under a parent node, and the Stepper label sets the text shown. Is optional marks a state that can be skipped. Transitions are added on the Model State Transitions tab, and a transition marked Automatic happens without user action.
State attributes that change issue behaviour
The Initial state is assigned when an issue is created. The Terminal state sets the issue to inactive. The Default closed state and Default cancelled state identify what a closed or cancelled issue looks like. Within one state model, each default attribute can sit on one state.
Attaching components and mapping stages
On the Workflow components step, choose a layout, a state model and, if you want guidance, a playbook. Changing the state model or playbook after mapping resets the mappings and asks for confirmation. Clearing the playbook removes each state-to-stage mapping, so settle these choices first.
Each non-terminal state maps to one playbook stage. When an issue enters a mapped state, the playbook moves to that stage. When the final activity in a stage is completed, the system proposes the matching state change for confirmation, rather than applying it silently.
Trigger condition and priority
When a new issue is created, the system checks the trigger condition, and the workflow can apply if it matches. With no condition, the workflow covers any issue on the table. A field-based condition is built with Edit conditions and then Set. A scripted condition sets a result variable to true or false.
Priority decides which workflow wins when several match. The lowest priority number is selected. A new workflow receives a default priority above the highest already on its table, and you can change it. If another active workflow uses the same value, a warning appears, and the clash must be fixed before activation.
Approval types and how they gate changes
Attach approvals once an approval configuration record exists. Each approval needs a name, an Applicable table of Issue or Remediation Task, and an approval configuration, where Create new is available. The Approval type is State Change or Due Date Extension. A State Change approval also needs a State, chosen from the workflow’s state model.
A State Change approval stops the issue from moving beyond that state until it is granted. A Due Date Extension approval governs requested extensions to the due date and is not tied to a state. A workflow can have one active Due Date Extension approval for issues and one for remediation tasks. State Change approvals have no such cap.
Once an approval has been requested, it cannot be deleted, and its Applicable table, State and Approval type lock to preserve history. Name, active status and display order stay editable; to retire a used approval, make it inactive.
An issue moves forward when each State Change approval between its current state and the target has been approved or judged not required. A pending, rejected or cancelled approval blocks the move, and the message names the state and approval involved. The block holds even when the state model would allow a skip, because an intermediate state carrying an applicable approval cannot be bypassed. Several approvals on one state run independently, each with its own approvers and history.
Backward moves follow a different rule. A backward move is blocked while approvals at or above the target state are awaiting a decision, so those must be cancelled first. After the move, earlier approvals stop counting and must be requested again when the issue moves forward. A Due Date Extension approval neither blocks a state change nor is affected by a backward move.
Activating the workflow
The Review step summarises the configuration, including trigger, priority and mappings. The Activate workflow button appears only here. Approvals are optional at this point. Activation checks the state attributes and warns if a required one sits on no state. The status then becomes Active. Run the workflow through the testing and acceptance checklist before you switch it on.
Requesting and responding to approvals
The approval must be configured directly on the table for the record’s current state. A Due Date Extension approval must be configured on the source table, since configurations are not inherited from parent tables.
For a State Change, the Brazil release has a Request Approval action; in the Australia release the request is created automatically when a move past the state is attempted. For a due date extension, select Request due date extension and complete the extension fields. In the Brazil release, the extension form asks for the current due date, the approved extension count, a proposed due date and an extension reason from a configured list. Each approval level either needs its full approver group to agree or accepts a single approver. If no approvers are configured, the approval is marked not required. A State Change approval can also be requested from the playbook, as the last activity of a stage. A Due Date Extension is requested from the record.
A rejected or cancelled approval can be requested again. The new request starts at the first level, and the earlier request stays in the history. An approved extension makes the proposed date the new due date and raises the approved count. A rejected one clears the proposed date and leaves the count unchanged.
Approvers find requests as cards in the Approvals widget on their Home page, with overdue requests flagged. On the record, a single State Change request offers Approve or Reject; several requests lead to Review approval requests. Give a reason in the comment on a rejection, since it is copied to the record’s work notes. At a multi-level approval, a decision at one level passes the request to the next level and notifies its approvers.
Cancelling, cloning, deactivating and reassigning
A requester can withdraw a pending approval with Cancel approval. This leaves the issue as it was, but the state change stays blocked until a new approved request exists.
Cloning copies the layout, state model, playbook and approvals into a workflow named with (copy) appended. Whether the trigger condition and priority come across depends on the ServiceNow release, so set both again on the clone before activating it. Copied steps stay Pending until you open and save them.
Deactivating stops a workflow being evaluated for new issues. It is not deleted, and issues already attached keep using it. One case needs care. A workflow with no trigger condition and the lowest priority number on its table acts as the table’s catch-all. Deactivating it removes that coverage with no warning, so new issues fall to the next active workflow or to the table’s existing behaviour. Other setup pitfalls are set out in the common mistakes guide.
Reassignment is manual, since an issue does not move automatically even when a higher-priority trigger would match it. Open the issue, select the More Actions icon beside Save, and choose Reassign workflow (called Change workflow in the Australia release). In the Brazil release, the issue resets to the new workflow’s initial state, in-progress playbook activity and pending approval requests are cancelled, and a state change needing approval under the new workflow needs a new request. Attachments, related records, child issues and impacted items are kept, and field data carries over where the field exists in both workflows. Active remediation tasks carry over and need review. A work note records the change.
Frequently asked questions
Do I need a separate workflow for each kind of issue?
Yes, when a category needs its own states, layout, approval rules or guided activities, because each workflow replaces the table’s default handling for issues it matches.
What happens when two active workflows match the same issue?
The workflow with the lowest priority number is selected. Equal values on the same table produce a warning, and the clash must be fixed before activation.
Can an issue skip a state that carries an approval?
No. The state model may permit the skip, but an intermediate state with an applicable approval cannot be bypassed until that approval is granted.
Do approvals have to exist before a workflow is activated?
No. Approvals are optional at activation and can be attached later.
Does cancelling an approval let the issue move on?
No. Cancelling withdraws the request, so a new approved request is needed before the state can change.