OBLYTECH Logo
OBLYTECH Logo

Compliance Case Management: types, workflow and case records

ServiceNow Compliance Case Management handles reported compliance cases, such as complaints and breaches, and compliance requests. A case moves through five stages: report, triage, investigate, resolve and post-case review. Before analysts can work a case, an administrator defines the case types, the state model and the transition conditions that control each move.

What the application covers

The application, identified as sn_comp_case, is downloaded from the ServiceNow Store. Installing it requires the admin role. Demo data is optional: the install screen has a Load demo data check box, which is meant for development or test instances, so leave it clear on a live instance.

A compliance case records an event that needs investigation. A compliance request covers policy modifications, clarifications and inquiries. A compliance case and a compliance request each run their own workflow:

Record type Workflow states
Compliance case New, Triage, Investigate, Resolve, Post case review, Close, Canceled
Compliance request New, Triage, In progress, Canceled, Awaiting approval, Approved, Rejected, Closed

The two lists share New, Triage and Canceled, and each state is recorded against a state model. For policy work, see policy and compliance management. For the wider program, see the governance, risk and compliance hub.

How a case moves through five stages

Each stage hands work to a different group, so the setup has to match who does what.

Reporting

Business users report through Employee Center. The compliance team enters reports, including phone and email reports, in Compliance Workspace, and each case records its source.

Triage and assignment

The compliance team checks the report for validity, then assigns a case analyst from the assignment group that the case type presets. Assignment rules assign a case to a user or a group when predefined conditions are met. For the roles behind these decisions, see the GRC roles and RACI guide.

Investigation through case tasks

The analyst gathers evidence with several teams and splits the work into case tasks. Each task goes to a case task owner, who submits details back for review. The analyst then records:

  • Impacted areas, such as the entities, controls, locations or users affected.
  • Related areas, such as policies, citations, control objectives or risk events.
  • Compliance regulations that might be affected.
  • Causes and consequences, including the root cause.

These links let another reviewer follow the chain of events without rebuilding it.

Resolution and post-case review

The analyst starts remediation and preventive measures and tracks reportable violations for lodgement with regulators. The post-case stage runs a root-cause analysis, reviews issues tied to impacted areas, and closes the case with the teams involved.

Configuring the application in order

Setup runs in a fixed order:

  1. Download and install the application with the admin role.
  2. Create case types.
  3. Create a request type.
  4. Create a compliance state model.
  5. Create the workflow states.
  6. Define the model state transitions.
  7. Create an assessment template.

The case type appears before the state model, yet the case type form has a State Model field, so build the model before a type goes into use. Transition conditions come last because they connect existing states.

Creating case types and subtypes

Creating a case type requires the sn_compliance_case_admin role. Navigate to All > Compliance Case Management > Case types, select New, complete the form and save it. The Case subtypes related list then appears, and each subtype is added from it.

A case type groups cases by kind of occurrence, such as financial, code of conduct or HR cases. A separate type is worth creating when cases need a different assignment group, state model, assessment template or document template, since the type holds the state model, assessment templates and document templates, and presets the assignment group that its cases receive.

The Case Type form includes:

  • Label and Name, the display and internal names.
  • Case category, set automatically to Compliance case.
  • Active, which turns the type on or off.
  • State Model, the workflow states and transitions used by the type.
  • Assessment templates, which include smart assessment templates when the property sn_grc_case_mgmt.enable_smart_assessments is true.
  • Document templates, used for PDF reports on the type’s cases.

A subtype, such as Conflict of interest, narrows the record at intake. View and assignment rules are optional; if none is created, the defaults apply.

Building the state model and transitions

A GRC State Model record names the model and points its table name at sn_comp_case_compliance_case. The state field defaults to State.

Each workflow state is then given a display type. A node sits in the main flow and can be marked optional. A sub-level sits under a parent model state and needs a stepper label.

Transition conditions control each move. Each condition has a name, a transition, a description and an error message shown when conditions are not met. The Requires field sets the test:

Requires option Passes when
Task has been through Approval The related task has an approval that is accepted or rejected
Task is Approved The related task is approved
Task is Rejected The related task is rejected
Transition Condition The conditions defined for this transition are met
Transition Script Advanced conditions are written as a script

For example, a team could require an approved case task before a case moves from Investigate to Resolve. Write the error message so it names what is missing.

Recording a compliance case

The compliance case form is the working record. Number, Type and State are set automatically, and Priority runs from 1 Critical to 5 Planning. Primary entity and entity owner are filled from the impacted areas. Case closure SLA is calculated from the creation date.

Source and additional source

Source records how the case arrived: Manual when it was created in Compliance Workspace, or Employee Center when reported there. Source record names an originating record, such as a risk event. Additional source offers Email or Phone, but it appears only when Source is Manual and the record has been saved.

Breach status and reporting status

Breach status has four values: To be determined, Breach detected, Future potential and Not a breach. Breach start, Breach end and Breach significance identified appear only for Breach detected or Future potential.

Reporting status is derived from the regulations linked to the case. If any one of them is reportable, the case is reportable. It defaults to To be determined, so the regulations have to be linked before the status means anything.

Case tasks and action task review

Case task types are Assessment (collects responses), Investigation (finds a cause) and Others (configured types). A new task starts in Draft, and its due date must fall before the case closure SLA. Its owner belongs to the assignment group. Assessment templates appear only for Assessment tasks and only when mapped to the case type, and a template cannot be reused while an open assessment uses it.

Reviewing an action task requires the sn_compliance_ws.corporate_compliance_analyst role. Open it from Tasks in Compliance Workspace, then choose Request revision, Complete (then Close as complete), Close as incomplete or Cancel. Each path asks for notes, which keeps the reasoning on the record.

Anonymous reporting and assessments

The anonymous form lets someone report an issue without giving their identity. It still asks for the case type, a summary, a description, a criticality rating, the units and departments involved, and the location.

An assessment metric type builds the questionnaire. It holds a name, an assessment duration counted from generation, the table sn_grc_case_mgmt_core_case, a Draft state, the roles that can view results, and an introduction for respondents. When smart assessments are enabled, the Smart Assessment Engine can run them on case action tasks.

View and assignment rules

View rules control the case form for the classic default view or the Workspace view, and can hide details, journal fields, section navigation or section collapsing. Assignment rules assign each case to a user or a group.

Checks before go-live

For commonly missed setup steps, see the governance, risk and compliance mistakes guide.

Frequently asked questions

Who can report a compliance case?

Business users report through Employee Center. The compliance team creates cases in Compliance Workspace, including phone and email reports. An anonymous form omits the reporter’s identity.

What separates a compliance case from a compliance request?

A case covers reported events such as complaints and breaches. A request covers policy modifications, clarifications and inquiries. They run separate workflows with different states.

Why does a case type need a state model?

The state model defines the workflow path. A case type is mapped to a state model, so its cases move through the states and conditions of that model.

How is reporting status decided?

It comes from the regulations linked to the case. If any associated regulation is reportable, the case is reportable. It defaults to To be determined.