Configure a risk assessment methodology

A risk assessment methodology in ServiceNow Advanced Risk defines what you assess and which assessment workflows apply. Configure a RAM for risks or objects, set the relevant fields and validation rules, configure its assessment types, then publish it. Review the assessment context before publication because it changes the fields and behavior available.

Choose the assessment context before building the methodology

Start with the decision the assessment must support. A risk assessment evaluates an entity together with its related risk statement. An object assessment evaluates a ServiceNow record, such as a change or an exception. These choices share a methodology form, but they expose different configuration sections.

For a risk-based RAM, identify the entity classes that belong in scope. Business services, assets, and business applications are examples. For an object-based RAM, identify the tables whose records need assessment. Record this scope before choosing workflow options so that the methodology has a clear purpose.

Use Advanced Risk Assessment for the surrounding assessment process. Where the assessed object is a change, the related change risk assessment guidance provides context for that specific use case.

The configuration below reflects Brazil behavior; check the available fields and lifecycle actions on your instance and release. Plan a representative assessment before publication, including the expected outcome and the evidence the assessor will need.

Create the risk assessment methodology record

Configuring a RAM through the Advanced Risk procedure requires sn_risk_advanced.ara_admin. Use that action-specific requirement when arranging access for the administrator who will create and configure the methodology.

  1. Navigate to All > Advanced Risk Assessment > Risk Identification > Risk Assessment Methodologies.
  2. Select New and enter a meaningful Name.
  3. Check that Domain area is set to IRM and State is set to Draft.
  4. Under Assessment Context, select Risk or Object in Assess.
  5. Complete the fields for that context, then right-click and save the form.

With Risk selected, populate Applicable entity classes. With Object selected, use Applicable Record Types to associate the required tables. Multiple tables can be associated with a RAM. Tables can still be attached after a methodology goes live, but none can be detached again, so settle the list before publication.

That restriction makes table selection a review point rather than a cleanup task. Ask the process owner to confirm each proposed table. Avoid associating a table merely because it might become relevant later; a narrower starting scope is easier to explain and evaluate.

Configure assessment workflows and result behavior

The Workflows section offers Inherent risk, Control effectiveness, Residual risk, and Target risk. Select the assessment components that fit the decision. The Enable risk response option is available when the context is Risk.

Saving the record does not finish the assessment design. Use the relevant related links: Configure inherent assessment, Configure control effectiveness, Configure residual assessment, and Configure target assessment. Complete the assessment configuration needed for the workflows you selected before publishing.

For risk assessments, Rollup Configurations separates annual loss expectancy from score aggregation. Calculate ALE based on offers Sum, Average, Maximum, and Minimum. Calculate score based on offers Average, Maximum, and Minimum. The score rollup reference for Brazil also lists Worst case among its score options, so confirm the full list on your instance before writing it into a runbook. Choose the formula according to the meaning of the result, rather than assuming the two fields have identical options.

For object assessments, consider Update assessment results to source record. This copies results back to the record being assessed, with assessment result mappings defined for applicable record types within the individual assessment types. Include the destination record in your acceptance review so that the outcome is understandable outside the assessment itself.

Where control evidence is central to the methodology, connect the design review with risk assessment and control testing. Agree what the control assessment should establish before choosing how its results will be interpreted.

Set response requirements and validation rules

For a risk-based methodology, decide how assessors should explain their response. Enable risk response task workflow allows response tasks to be created, deleted, removed, edited, and linked within an assessment. Allow issue linking with risk assessment supports creating an issue or linking an existing open issue.

Risk response is required offers None, Always, On specific conditions, and On specific conditions defined using script. Choose a requirement that matches the governance decision. If only particular outcomes require a response, define those conditions before making the field mandatory.

Comments required when users define risk response requires an assessor to enter a comment in Risk Response comments before saving the response. Separately, Final comment is required can be set to None, Always, On breach of appetite, or On breach of tolerance. Treat these as separate checkpoints: response reasoning and final commentary serve different review needs.

Automatically create issue offers None, On breach of appetite, and On breach of tolerance. An issue appears only once the assessment has been approved and has reached the published state, so a case still in review will not show one yet. Review that timing with the issue owner so that an unfinished assessment is not mistaken for a missing issue.

When residual assessment is enabled, Residual score is lower than inherent checks that the qualitative residual rating sits strictly below the inherent one. The check only runs when residual assessment is enabled, so include a residual rating that equals the inherent rating in the acceptance example to confirm it fails validation.

For help planning the configuration, see ServiceNow implementation.

Review assessor information, scheduling, and publication

For risk assessments, reference information can show related risk events, related risk indicators, open issues, and the previous assessment. Select the context assessors need to judge the current risk. During review, check whether the displayed information helps explain the decision rather than simply increasing the amount of material on screen.

Copy previous responses carries factor responses and comments into a reassessment. Allow override of results permits computed scores and ALE to be overridden. Decide how reviewers will distinguish a carried-forward answer from a current judgment, and how an overridden result should be explained in the assessment record.

Review Risk identification for the intended assessment scope. Its choices are None, From Library, Ad-hoc, and From Library and Ad-hoc. The combined choice supports creating risks and adding library risks. Agree whether assessors should identify risks outside the library before selecting this setting.

For projects using grid mode, Additional grid columns adds columns alongside Risk and Entity. Additional control grid columns selects columns for the control assessment grid. Choose columns that support the review conversation, such as the information reviewers need to distinguish records, and inspect the resulting grid during acceptance.

For object assessments, Schedule provides Reassessment frequency choices of None, Weekly, Monthly, Quarterly, Semi-annually, and Annually. Days to overdue defines the number of days after the due date at which an assessment becomes overdue.

Check the context, selected workflows, required comments, and expected result destinations before selecting Publish. Publishing a methodology also produces its reporting view. That view stays empty until an assessment advances to Monitor, at which point its figures start to appear. Open the published methodology and select Open reporting view to inspect the consolidated assessment list and expand records for detail.

Review reporting after a representative assessment reaches the required state. A published methodology and an empty reporting view can coexist while assessments have not yet reached that point. Compare the resulting factor responses and scores with the acceptance example prepared during design.

Answers to common questions about copying, retiring and reporting on methodologies

Can an administrator copy an existing methodology?

Yes. Copying requires sn_risk.admin. Navigate to All > Advanced Risk Assessment > Administration > Risk Assessment Methodologies, open the RAM, and select Copy. The copy includes the underlying record and related lists. Review the copied configuration against its new purpose before using it.

What happens when an unused RAM is retired?

Retirement requires sn_risk.admin. Open the methodology through the Administration navigation and select Retire. Retiring flips the methodology to Retired and takes its factors, its scope and any assessment still open along with it, so check those dependencies first.

Can the workspace require a single risk response?

The switch lives in the classic interface, under the Default tab of the methodology form, so workspace users never see it. Once it is on, a workspace assessor picks exactly one response, while classic assessments still accept several. Flip it on only while no assessment is underway; it can be switched back off at any time.

Does changing assessment section terminology rename reports?

No. The relabeling only reaches the assessor-facing screens. Charts, dashboards and heatmaps keep the wording they already use, so agree the new section names with whoever owns those reports before anyone renames anything.