OBLYTECH Logo
OBLYTECH Logo

Brand case report templates with headers and footers

A security case report template can carry branding through header and footer images and text in Major Security Incident Management. Create a branding record, select it in the report template, and check the resulting layout. Branding can be included in any report template type you create, except the two predefined reports.

Choose the report workflow before adding branding

Start by identifying where the report template lives. The branding controls described here belong to Major Security Incident Management, under Status Report Setup. They support the presentation of major security incident status reports. Check the navigation and available fields on your instance and release before changing a template; the settings below follow the Brazil workflow.

Security Incident Response also has a report template editor for analyst and executive summaries, while Threat Intelligence Security Center has a case report generation workflow. A similar report name does not establish that those editors expose the same branding controls. For this work, find the MSIM report template and its Branding information field before preparing the artwork.

Choose the intended audience before choosing the header. An internal response update might need a short classification footer and a compact logo. A management report might need more space for its opening summary. Treat these as design decisions: write down the audience, approved artwork, footer wording, and required report type so that the template has a clear purpose.

Create the branding record with the right access

Creating branding requires the sn_msi.workspace_manager role. Navigate to All > Major Security Incident Management > MSI Administration > Status Report Setup. Within Report Template > Branding, select Configure, then New. Give the record a Name that lets another administrator distinguish it from other branding choices.

Use a name that describes the intended identity or audience rather than a temporary experiment. For example, a team could distinguish an internal status branding record from an external stakeholder variant. These are suggested naming conventions, not predefined records.

  1. In Header image, select Click to add, then Choose File. Choose the image from your system and select OK.
  2. Use the same upload sequence in Footer image if a footer image is needed.
  3. Set the image positions and heights, then enter Footer text and its position.
  4. Select Submit to create the record under Branding Templates.

The Branding template form contains nine fields in this order: Name, Header image, Footer image, Header image position, Footer image position, Header image height, Footer image height, Footer text, and Footer text position. Work down that list in sequence, uploading each image before you set its position and height.

Prepare the header message separately from the logo. The branding capability includes header and footer text, but the listed Branding template fields specifically identify Footer text. Use the report template’s First page header editor to define the template body and insert the required variables. The Branding form has no separate header text field, so do not look for one there.

Set image size, alignment, and footer wording

Four things need attention when you add branding. Upload and align both images, keep each image within the 5 MB limit, set both image heights, and keep the footer text to 100 characters or fewer.

The maximum image size for the header and footer is 5 MB. An image exceeding the limit can produce the message “Image format can’t be recognized” in the major security incident. If that message appears, check file size before concluding that the artwork format itself is the cause. Prepare smaller approved assets before uploading them again.

Header image position offers Left, Center, and Right. Header image height uses points. Choose an initial height that leaves room for the opening report content, then inspect the result with representative text. Increasing a logo’s height can consume space the incident summary needs, so evaluate the header together with the report margins.

Both height fields take a value in points (pt), so set the header and footer heights on the same scale before you compare them.

Footer image position and Footer text position offer Top left, Top center, Top Right, Bottom left, Bottom center, and Bottom Right. Footer image height also uses points. Plan the text and image together: placing both in the same region deserves a visual check for crowding or awkward spacing.

Footer text is limited to 100 characters. Use that space for concise, approved classification or confidentiality wording. Avoid trying to fit a full distribution policy into the footer. Keep detailed handling instructions in the appropriate report content or team procedure, and ask the information owner to approve the short label before routine use.

The example for footer text is a classification or confidentiality statement, such as Confidential, Internal Only, or Client Attorney Privileged. Labels of that kind suit the 100-character limit, which is designed for a short label rather than a handling policy.

A readable footer communicates a label; it should not be treated as evidence that access restrictions have been applied. As a review practice, check the intended recipients separately from the branding review. A polished report can still contain information that requires a narrower distribution list.

Connect branding to the report template

Creating an MSIM report template also requires sn_msi.workspace_manager. Return to Status Report Setup, select Configure in the Report Template section, and select New. Enter Name, choose Branding information, and set Report Type to PDF or Email (the field also offers Table, which this procedure does not cover). Select the appropriate Table for the report template.

Branding information is the connection between the report template and the branding record. The field brings in the logo, header, and footer text from that record, and the example for it is Default branding record. If the output shows an unexpected identity, compare the selected record with the intended one before changing image files. This separates a wrong selection from a layout problem.

Set Top/Bottom Margin, Left/Right Margin, and Page Size together with the artwork. The page size example is A4, but choose the format required for your report. Use First page header editor to define the template body and insert the required variables. Select Active when the MSI Manager should be able to generate reports from the template, then submit the record.

Top/Bottom Margin sets the indentation at the top and bottom of the generated report, and Left/Right Margin sets the indentation at the left and right. The default page size is A4. After submission, the new template appears under the Reports Templates page, where you can open it to add report sections, subsections, and elements.

If Active is cleared, the MSI Manager cannot create a report for that template type in the MSIM workspace. Include this setting in handover checks alongside the selected branding and report type. For help planning this work, see ServiceNow implementation.

Keep report structure clear beneath the header

Branding provides the surrounding identity; sections organize the incident narrative. Creating a Report Section Template requires sn_msi.workspace_manager. Open the report template, then select Report sections > New. Configure Name, Table, Active, MSI report template, and Order. Use Hint for guidance displayed beneath the section title, and Editor – Body for the section content.

Subsections have their own layout choices. Creating a Report Subsection Template requires sn_msi.workspace_manager. From the report section, select Report subsections > New. Primary spans the page width and appears above the other subsections; a section can have one Primary subsection. Secondary spans the width unless paired with Text side panel, which supports text.

For finer content blocks, creating a Report subsection element also requires sn_msi.workspace_manager. Open the subsection and select Report subsection elements > New. Available element types include Free Form Text, Visualization, Custom, and List. Review Order, Active, and Show by default in the report so the intended material is available and appears in the planned sequence.

As an editorial check, put decision-relevant content where readers will find it quickly. A prominent logo should not make the current situation harder to identify. Compare a short incident update with a longer one to see whether the chosen structure still gives the summary enough space.

Review the branded output before routine use

Use the template’s Preview functionality to examine the design. Check the selected branding, opening content, footer wording, and report structure as a single document. Record the branding record name, report template name, and reviewed output type in your review notes.

Test with representative content rather than a nearly empty example. Include a longer summary and enough section content to expose layout pressure. Record what needs adjustment before changing several settings together. A single change to height or margins is easier to assess when the surrounding content stays consistent.

Work through the setup in order after you submit each record. The branding record should appear under the Branding Templates page, the report template under the Reports Templates page, and only then should you run Preview.

Generation happens at run time. Preview the design-time template first, then generate and share the report with stakeholders from the Major Security Incident Management workspace. Use the branding record you selected for that preview, because the header, footer, and margins all appear in the output.