OBLYTECH Logo
OBLYTECH Logo

Create quick filters for security incident lists

To add or change quick filters for security incident lists, open Security Incident Response Workspace, select the list icon, and edit the Quick Filters selection for the list. Save your selection to retain the preference. Creating a reusable filter definition is a separate administrator action; choosing which filters appear happens within the workspace list view.

Choose the right quick-filter action

A request to “create a quick filter” can describe two different needs. An analyst may want an existing filter to appear beside a list, or the team may need a new set of conditions that does not yet exist. Establish which result is needed before changing anything. A saved panel preference and a reusable filter definition have different purposes.

For example, someone reviewing urgent incidents may need to show an available priority filter in the panel. That person should start with the list selection. If the required criteria are absent from the available filters, an administrator needs to create the definition first. Adding another visible filter does not itself define new criteria.

  • Add or modify quick filters within the list view: the required role is sn_si.basic.
  • Apply predefined filters and edit the displayed selection: the required role is sn_si.analyst.
  • Create reusable filters through Administration: the required role is sn_si.admin.
  • Configure filter records through System Definition: the required role is sn_si.admin.

These steps describe Brazil behavior. Check the navigation and available controls on your instance and release before making changes. If your work also involves task ownership, see creating, assigning, and filtering response tasks for that adjacent workflow.

Add or modify quick filters in the list view

Use this route when the required filter exists and the immediate goal is to change the filters available beside a security incident or response task list. Begin with the list you actually intend to review, rather than configuring the panel while viewing a different work queue.

  1. Navigate to Workspaces > Security Incident Response Workspace.
  2. Select the list icon.
  3. Open the relevant list. For security incidents, a typical route is Lists > Security Incidents > Quick Filters. Confirm the path on your instance.
  4. Select the Edit icon and make the required changes.
  5. Select Save.

The saved change persists as a preference and is displayed when the user returns to the page. Validate the result by leaving the view and returning under the same user. Check whether the intended filters appear, rather than judging success solely by whether the edit panel closed.

Keep each selection to the decisions made in that queue. A handover review and a priority review usually need different criteria, so set each one up separately. After saving, open a few records the filter should return and confirm they appear in the list.

Apply filters and understand the resulting list

With sn_si.analyst, open the workspace list icon and choose a list item under Security Incidents or Response Tasks. The Quick Filter page shows the currently selected filters and their matching record counts. Choose one or more filters to narrow the selected view.

Multiple selected filters use AND logic. A record must meet the combined criteria to remain in the result. If one filter represents critical incidents and another represents incidents open beyond a time threshold, the combined selection seeks records meeting both criteria. It does not collect the separate groups into one larger list.

Use Clear to remove the filter selection. This provides a starting point when a combination produces an unexpected result. Apply one filter, inspect the records, and then add the next. That sequence helps identify which added condition excludes a record you expected to see.

Compare the result with known records rather than treating a count as proof that the criteria are correct. A small result may fit the intended intersection, while an empty result may mean no current records satisfy it. Neither outcome alone demonstrates a configuration fault.

Quick filters support queue review within the broader security operations incident response workflow. Define what the analyst needs to review before deciding which combination to retain.

Change the filters available in the panel

For the analyst selection workflow, select the Edit Quick Filter Selection icon. The Edit Quick Filters page opens with the selected filters. Select inside the textbox to show available filters, choose the required entries, and select Save. The chosen entries appear in the Quick Filters pane, and the configuration persists for that security analyst.

Distinguish making a filter available from applying it to narrow the list. First confirm that the intended entry appears in the pane. Then select it and inspect the returned records. Keeping these checks separate helps locate a problem: an absent entry calls for checking availability and preferences; unexpected records call for checking conditions and combinations.

Users can hide or unhide active quick filters through their preferences. There is an important consequence when an administrator adds another filter: a user who has already changed quick-filter preferences must manually change the personalized view to include the new active filter. Do not assume that activating a new definition updates an existing personalized selection.

For help planning this work, see ServiceNow implementation.

Check the filters that ship with the application first

Before building a new definition, look at the eight quick filters the base system installs. Several common triage questions already have an answer, and a duplicate entry only adds clutter to the panel. The shipped filters fall into two groups.

  • Security incidents: Incidents Opened Today; Incidents open > 24hrs; Open Incidents with Priority = Critical; Risk score >= 80; Open Phishing Incidents.
  • Response tasks: Tasks opened Today; Tasks open > 24h; Open Tasks with Priority = Critical.

Each shipped filter has a Table value and an Active setting, and each is set to True as delivered. An administrator who wants one removed from the panel can set it to false rather than deleting it. Because the Active setting lives on the record, that change applies to the filter for everyone who sees it, not only one analyst. Changing an existing filter follows the same route as creating one: open the record, adjust the name or condition, and select Update.

When a shipped filter is close to what the team needs, the usual choice is to adjust its condition rather than add a near-duplicate beside it. Two filters that differ only by a threshold give analysts two entries to compare, and the panel becomes harder to scan. Decide first whether the existing definition answers the question, and only then create a new one. Record which filters you disabled and why, so the next administrator can tell a deliberate change from an accident.

Create a reusable definition when the criteria are missing

An administrator with sn_si.admin can create a definition through Workspaces > Security Incident Response Workspaces > Administration. Open Quick Filters > Filters, then select New. Complete the Create New Quick Filters form and select Save. The record is saved and appears on the Filter page.

  • Name: give the filter a name that describes the intended subset.
  • Active: enable the filter for use.
  • Table: choose the table to which the filter applies.
  • Order: set its display sequence; lower numbers appear first.
  • Conditions: define the selection criteria with the condition builder.

Decide the table before building the conditions. A request about incidents and a request about response tasks concern different record sets. Write the intended outcome in a sentence first, then use that sentence to review the table and criteria. A recognizable name cannot compensate for a definition aimed at the wrong records.

Test with records that should qualify and records that should be excluded. Include a boundary case when the condition uses a threshold. These are suggested validation checks, not additional form fields. They help determine whether the saved conditions express the queue rule the team intended.

Review an existing definition without confusing preferences

For record-level configuration with sn_si.admin, navigate to System Definition > Tables and search for Quick Filters (sn_si_aw_quick_filters). Open Related Links > Show List to reach the Quick Filters list. Select an existing filter, change its name and filter condition as needed, and select Update.

The same list provides a creation route using New, a name, a table, and a filter condition, followed by Submit. A filter applies only when its Active checkbox is selected. Use the route appropriate to the configuration task.

Before changing a definition, record the intended criteria and the reason for the change in your team’s working notes. Afterward, test the revised definition and then review the analyst preference separately. This avoids interpreting a retained personal selection as evidence that the definition failed to save.

Filter allowlisted observables before running actions

Some observables a workflow collects belong to sources or assets the team has already cleared, and acting on them only slows the investigation. The Filter Allowlisted Observables activity removes those observables from the list. It can be used with any workflow, and it is most useful when it runs before any step that takes action, so the response covers only what remains.

The activity takes one input, observables, which is the list of observables currently available to the workflow. Its single output, filteredObservables, holds what remains after the removal. Subsequent activities can use that output.

Each run ends in one of two results. Success means the filter list was created. Failure means an error occurred while the observables were being filtered, and the detail appears in the activity output error. Check that error before assuming the problem lies in the investigation itself.

Test the activity with a list that includes one observable you expect to be removed and one you expect to remain. The first should be absent from filteredObservables and the second should still be present.

Place the filter before any step that takes action on an observable. Confirm the test results before the workflow runs against live data.