Splunk Enterprise Security notable event ingestion turns selected notable events into ServiceNow security incidents through configured profiles, field mappings, filters, and schedules. Its bidirectional interface can also update Splunk notable events when incidents are created or closed. Configure ingestion and return updates together so analysts can follow the relationship between detection and response.
Prepare the connection and divide configuration responsibilities
Start by identifying the Splunk notable events that should enter Security Incident Response. Each Splunk notable event type you ingest needs its own event profile. One configured source can serve several profiles, provided each profile ingests different notable event types. Record the intended correlation search, response owner, and incident outcome before configuring the first profile.
An administrator with the admin role handles instance preparation, required Security Incident Response plugins, role assignment, and the application installation tasks in the integration checklist. A MID Server is needed when the Splunk server sits within the corporate network. Assign profile configuration to a user with sn_si.ingestion_profile_admin. The sn_si.admin role inherits that role’s permissions.
For connection configuration, sn_si.ingestion_profile_admin is the required role. Navigate to All > Security Operations > Integrations > Integration Configurations, search for the Splunk Enterprise Security- Event Ingestion tile, and select Configure. Supply the source Name and Splunk API Base URL. Names accept spaces but do not support parentheses.
Enable Basic Authentication when using API Account User Name and API Password. Token-based authentication is available from version 12.0.0 of the integration, so check the version shown in your installed application before choosing it. For an on-premises source, enable On Premises Deployment and select the intended active, validated MID Server. For a cloud source, leave that deployment option cleared. Check these settings against your installed application and release before proceeding.
Decide who owns the Splunk API account and whether ServiceNow can reach the Splunk server directly. If the server sits inside the corporate network, route the connection through a MID Server and select that MID Server in the source configuration.
Build the Splunk Enterprise Security notable event ingestion mapping
The scheduled profile workflow covers profile creation, correlation search selection, mapping, preview, scheduling, and additional update options. The sn_si.ingestion_profile_admin role performs profile creation, mapping, preview, and scheduling. Choose the correlation search deliberately: its events provide the sample fields used to construct the incident.
- Open Mapping and select Fetch Sample Data for a scheduled profile. Retrieve recent samples or supply specific notable event IDs. The mapping experience supports up to five sample notable events.
- Compare samples before mapping. Look for missing values, different event shapes, and fields that an analyst needs to interpret the detection.
- Drag a source field into Input Expression beside its destination in SIR Incident Field Mapping. Add or remove destination fields with the mapping controls as needed.
- Preview the incident and check the resulting values. Correct empty fields and mapping errors before moving into scheduling.
Source fields change color as they are mapped: blue indicates an unmapped field, while gray indicates a field already used. A field may still be mapped to more than one destination. Treat color as a tracking aid rather than proof that the resulting incident contains the right information.
Observable, Configuration Item, and Work notes support multiple mapped values. Other destinations may reject that pattern, producing an empty-field error during preview. A mapped value that is absent from a destination’s allowed choices also leaves that field unpopulated. Test the actual result instead of assuming a populated expression guarantees a populated incident.
Enable Updates is available against Input Expression for mapped fields that should receive updates. Keep this mapping choice separate from the profile’s return-update options, which control changes sent back to Splunk.
Control incident creation and aggregation separately
Incident Generation Conditions decide whether an incoming event qualifies to create an incident. Enable Filter based on conditions and build the rule from available sample fields. Values are case-sensitive. AND requires the conditions to match together; OR permits an alternative match. Check the spelling and capitalization against actual event values.
For example, a response team might want a detection to reach a particular investigation state before it becomes an incident. Test one sample that satisfies the intended filter and another that fails it. This establishes whether the profile separates actionable detections from events that still need investigation.
Event Aggregation Criteria addresses a different decision: whether another qualifying notable belongs on an open incident. Enable Aggregate Conditions and select incident fields whose values should match. Fields selected together use AND. Add New Criteria supplies alternative groups evaluated with OR. A matching event is added to the most recently opened incident with the corresponding values.
Choose matching fields that represent the response boundary. A broad shared value may combine unrelated investigations; a field that changes with each detection may prevent intended grouping. Use representative events to test both outcomes. Analysts with sn_si.analyst can inspect associated events in the Splunk Event to Tasks related list, including timestamps and aggregation values.
The optional aggregation work note records that another notable was added. Decide whether that helps analysts follow the investigation or adds avoidable repetition. For the surrounding response workflow, see Security Incident Response use cases for enterprise teams.
Set the retrieval window before activating the profile
Scheduling is required for automated ingestion profiles. Configure it with sn_si.ingestion_profile_admin before activation. Ongoing ingestion uses a five-minute default polling interval, adjustable down to one minute. A shorter interval increases polling activity against Splunk, so choose timing around the detection cadence and the response team’s needs.
One-Time Retrieval serves a different purpose. It pulls historical notable events from the selected Since date through the current date, with a lookback of up to seven days. That profile does not continue retrieving new events afterward. Use it when you activate the profile to pick up investigations that are already open. The lookback reaches back at most seven days, so it does not backfill an archive.
The polling job checks new events and previously retrieved events that failed the incident generation criteria. A later change can therefore make a previously excluded notable qualify. Once a notable has created an incident, its subsequent updates are ignored by this scheduling behavior. Do not assume that bidirectional integration means unrestricted synchronization of all fields throughout the incident lifecycle.
Record the expected initial retrieval time and next ingestion time alongside the profile owner. A scheduled job aligned with a correlation search can make the handoff easier to observe.
Configure return updates and test the full incident lifecycle
Additional Options contains the optional return-update settings. The required role is sn_si.ingestion_profile_admin. Enable Update Notable Events upon SIR Incident Creation when incident creation should update the originating Splunk events. Choose Initial Notable Event Status Update from the statuses retrieved from the connected Splunk server rather than assuming a particular status exists.
Initial Comments posted back to Notable Event controls comments added to the notable’s incident review history. Use the comment to connect the detection with the incident and its response owner. Review substituted field values in a test so the return message identifies the intended record.
Enable Close out Notable Events upon SIR Incident Closure when closure should also update the related notables. Configure Closure Notable Event Status Update and Closure Comments Posted back to Notable Event. Both the original triggering notables and aggregated events are covered by these creation and closure options. Agree on the meaning of the selected closure status before enabling it.
Update SIR Automation Activity with Splunk Event comments brings comments into the activity with the prefix Comment from Splunk. Splunk Enterprise Security 8.0.x deprecated the comments field, preventing the application from retrieving those comments. Update Splunk comments with SIR work notes sends work notes in the other direction with the prefix Comment from ServiceNow.
Select Finish to complete configuration, then activate the profile for scheduled retrieval. Test incident creation, a subsequent aggregated notable, and closure. Inspect the incident relationship and the corresponding Splunk status and history at each stage. The documented limits are 1,000 created security incidents per 24 hours and up to 100 notable events per fired alert; subsequent events are ignored after those limits are reached.
For help planning this work, see ServiceNow implementation.
Questions about profile maintenance and unusual event data
Can a tested profile move between instances?
Yes. With sn_si.ingestion_profile_admin, use Export from Actions in Splunk Event Profiles, then Download. In the destination, use Import, Choose file, Upload, and Close and Reload Profiles. Validate the imported source account, server configuration, and MID Server before using the profile.
What is included when several profiles are exported?
Selected profiles share one payload.xml file. Exported settings include correlation rules, mappings, filters, aggregation criteria, field translations, sample data, scheduling, and source configuration information. Review that scope before transferring the file between environments.
How does manual forwarding obtain mapping samples?
A user with sn_si.ingestion_profile_admin can load an exported Splunk XML sample through Load Attachment Data on Mapping. In Splunk, select the event fields to export and choose XML Format. The imported field-value pairs then supply the mapping inputs.
Does exporting a manual profile preserve its original attachment?
The sample attachment data is copied with the profile, but the attachment file itself is not exported. Retain the original file separately if the team needs it for later comparison or troubleshooting.
Why might similar source field names acquire a suffix?
Special characters can cause different source names to become indistinguishable during mapping translation. A numerical suffix distinguishes duplicate names. Compare the source values before selecting a suffixed field so the mapping uses the intended input.