Major Security Incident Management (MSIM) is a ServiceNow application that sits on top of Security Incident Response. An analyst proposes or promotes an incident to major status, links related incidents beneath it, and runs the response from one workspace with shared folders and chat channels.
What the security version of a major incident adds
A standard security incident is one record worked by one analyst. When an intrusion or data exposure touches several teams, that record stops being enough. MSIM provides a parent record where child incidents, tasks, files, chat and status updates line up. It works alongside Security Incident Response and vulnerability response rather than replacing them.
| Capability | What the response team gets | Connected system |
|---|---|---|
| Dedicated workspace | One view of the incident with details, tasks and activity | Native |
| Child incident tasks | Response tasks organised across several linked incidents | Native |
| Collaboration folders | Folders created at promotion and archived at closure | Microsoft SharePoint |
| Chat channels | Channels created at promotion and managed from the workspace | Microsoft Teams |
| Impact reporting | Rollup of affected assets, locations and users | Native |
How an incident moves toward major status
There are three ways an incident enters the major track. The right one depends on whether a review step is wanted and whether a major record already exists.
Proposing a candidate for review
A proposal starts a review rather than a decision. An analyst with the security analyst role opens the security incident in the Security Incident Response workspace, opens the More Actions icon and selects Propose as Major Security Incident. The form asks for a detection date, which is the date the major incident was first created or proposed, plus a justification and the potential impact.
After submission the record shows a verification banner and the major tag, and it appears in the Proposed list of the MSIM workspace. The notification list receives an email with a link to the Details tab.
Promoting to a major incident
Promotion is a manager decision. A workspace admin or workspace manager reviews the proposal and chooses Promote to Major Security Incident or Reject as Major Security Incident. The promotion form adds an estimated resolution date, a code name such as Blue Tiger, and a category such as Misconfiguration, on top of the detection date, justification and potential impact.
A rejected proposal moves to the Rejected tab and is not promoted. A promoted incident moves to the Open tab with the major tag, and the decision is recorded in the activity section. Promotion also creates the folder structure and chat channels, and emails designated users with links to the incident and its collaboration spaces.
Linking an incident as a child
Linking keeps an incident as its own record while placing it beneath the major one. From the incident list, select the incident, open Link to Major Security Incident from the additional actions menu, pick the major record with the lookup, click OK, then click Propose. The activity section then shows the child link, and the major record’s Details tab lists both incidents.
A vulnerability assessment record can take the same routes. From the Vulnerability Assessment Workspace, use More Actions on the Details tab to link the assessment to an existing major incident, propose a new one, or promote it. The link then shows on the vulnerable item and across the other Vulnerability Response workspaces.
Setup checklist before the first major incident
Promotion creates the collaboration folders and chat channels from their templates, so each one needs its connection and template configured. If only one of the two promotion flows is active, only that component is set up at promotion. Work through these steps in order.
- Download and activate Major Security Incident Management from the ServiceNow Store.
- Confirm that the Security Incident Response plugins are installed and active: Security Incident Response v12.8.1 and Major Security Incident Response v1.1.1, as listed in the setup checklist.
- Verify that the default MSIM components are installed and active: File Explorer Core, Microsoft SharePoint, Microsoft Teams Chat Connector, Chat core and the Task Organizer UI Component.
- Confirm that Microsoft SharePoint and the Microsoft Teams Chat Connector are installed, and set up the Teams Graph connection described in the checklist. Set up the REST and Graph connections for the SharePoint spoke, version 1.1.2.
- Create or choose a SharePoint site, add a dedicated document library, grant users and groups their access, and configure the Graph and REST connections.
- Configure File Explorer: the repository drive, the folder and file actions shown on the component, and folder templates for each major incident type.
- Establish the Teams Graph connection and create a chat channel template.
- Set the administration options: whether analysts can propose, promote and link, which notifications fire, the template messages, and the tags analysts see.
- Confirm that both promotion flows, SI to MSI Promotion (SharePoint) and SI to MSI Promotion (Teams), are active. Each is independent. If one stays inactive, the matching component is the one set up at promotion.
Environment values to track
The environment reference table has one column each for development, test and production. It tracks the Azure tenant ID, the SharePoint and Teams app values, the site URL, the library name, the authentication method and the instance URL. It ends with a check that the Sites.FullControl.All permission has been removed after setup.
Roles inside a major incident
Assign these roles before anyone works a promoted record. The role decides which tabs a person can edit and which settings they can change.
| Role type | Role name | What the role does |
|---|---|---|
| MSI Administrator | sn_msi.workspace_admin | Installs and configures the application, connections, notifications and tags |
| MSI Manager | sn_msi.workspace_manager | Promotes incidents, edits incident data and links or unlinks records |
| MSI Responder | sn_msi.workspace_responder | Optional. Responds on the Details and Tasks tabs |
| Security analyst | sn_si.analyst | Proposes a security incident as a major incident candidate |
Linking an incident from the security incident list requires the sn_msi.workspace_admin role, while linking and unlinking records from the MSIM workspace is available to workspace managers and responders.
Linking and unlinking records in the workspace
A manager or responder attaches related records to a promoted major incident from the workspace. Open the Lists view, choose the Accepted tab, select the promoted record and open the Linked Records tab. A dropdown switches between Security Incidents (including child incidents), Remediation Tasks for vulnerable items and Security Cases from Threat Intelligence.
Select Link Record, choose the record and confirm. The rollup of its data runs in the background, and the list refreshes on its own. Open records are the ones that can be linked. A record in the Closed state cannot be linked, and a record already attached to a major incident is not attached again.
Unlinking is one record at a time from the Linked Records section. The change cannot be reversed, and the rolled-up data for that record disappears from the impact sections. Check the record before you confirm.
Restricting access to sensitive incidents
Some incidents hold material a wider group should not open. Open the record, scroll to the Restriction section on the Details tab, tick Enforce restriction check, then add allowed members and allowed groups through the search fields.
Once enforcement is on, access is limited to workspace managers and the listed members and groups. Users with the admin role can see the record regardless of the list, and that bypass applies in both the workspace and the classic interface. Setting the restriction itself needs the workspace manager role.
Status reports for stakeholders
The Status Reports tab on a promoted record produces three report types: an executive email that reads well on a phone, a technical PDF and an executive PDF. Each one starts from a template, and the list shows when the template was last updated and whether a report is in Draft, Queued or Published state.
The executive email follows a fixed set of sections.
| Section | What goes in it |
|---|---|
| Updates | A summary of the major incident, with an option to carry forward text from the last report |
| Explanation | What changed since the last update, key events, pending actions and the time of the next update |
| Additional information | Specific details relevant to this update |
| Visualizations | Incident impact metrics such as affected assets, locations and users |
| Lists | Linked records that give readers context |
Select Share to send the draft to internal or external stakeholders. Recipients fill in from the latest report sent with the same template, so recurring updates need little re-entry. Email Report sends the status report as a PDF attachment.
Frequently asked questions
Is this the same as IT service major incident management?
No. The IT service process is documented under IT Service Management incident management, and it is covered in the major incident management section for IT services. This guide covers the security version, which sits inside Security Incident Response and works with security incidents, vulnerable items and security cases.
Who can propose an incident as a major one?
An analyst with the security analyst role can propose an incident. The form asks for a detection date, a justification and the potential impact, and the record then enters the Proposed list in the MSIM workspace.
What happens when an incident is promoted?
A folder structure is created from the folder template, chat channels are created from the channel configuration, and designated users receive an email with links to the incident and its folders.
Can a closed incident be linked to a major one?
No. A record in the Closed state cannot be linked. Open records can be linked from the Linked Records tab.