OBLYTECH Logo
OBLYTECH Logo

Security Incident Response Workspace: Records and Dashboards

Security Incident Response Workspace gives security analysts and SOC managers one interface for managing security incidents from analysis through containment, eradication and recovery. Its incident forms, response tasks, investigation tools, related records and dashboards keep investigation context beside the work needed to resolve an incident and review the response.

How the workspace is installed

The workspace ships with Security Incident Response. Installing Security Incident Response 13.4.5 or later from the ServiceNow Store also installs the Security Incident Response Workspace application, identified as sn_si_aw, at version 1.5.1 or later. Workspace versions 1.5.1 and above arrive through a Security Incident Response install or upgrade, so they cannot be added independently. For a broader view of setting up the product, see the ServiceNow Security Incident Response Setup: First Steps page.

The same install brings four supporting applications. Check installed application versions and workspace behavior against your instance and release before changing configuration.

  • Enterprise Security Case Management PAD Commons: sn_escm_pad_cmn
  • Security Operations Common Workspace: sn_escm_ws_cmn
  • Security Incident UI Card Component: sn_sirw_evam
  • Security Operations spoke: sn_sec_spoke

PAD Commons also needs the Playbook Experience plugin, identified as playbook_experience.

Reading the Security Incident Response Workspace overview

The overview lists the security incidents and response tasks assigned to the analyst and the analyst’s team. Widgets group that work by priority, category, state and SLA. Selecting a segment, such as Critical on the priority widget, filters the lower half of the page. Items can be shown as cards or as list rows, and the analyst switches between the two. For the platform view of workspaces, see UI Builder and Workspaces.

From either view, the analyst can assign or reassign items, set an assignment group and assigned-to user, and add work notes. One or more items can be assigned to groups in a single action. Incidents can be deleted from the list view, and the list can be exported.

Lists, filters and search

Lists organize work by status and ownership. The main lists for each record type are below.

  • Security incidents: Visible to Me, Assigned to Me, Assigned to the Team, Unassigned, All Open, All
  • Response tasks: Assigned to Me, Assigned to the Team, Unassigned, All Open, All
  • Shift Handover records: Assigned to the Team, All
  • Assessments: My pending Assessments, My All Assessments
  • Phishing emails: Sorted by last update, with report, delete and export actions

Quick filters give a shorter list of items that need attention now. The gear icon sets the columns, and lists export to Excel, CSV, JSON or PDF. Selecting a record opens it in a new tab, so several incidents can stay open at once.

Inside a security incident record

The record is split into tabs.

  • Overview gives a snapshot of business impact, affected users, threat intelligence observables, response tasks and related incidents.
  • Details holds the incident form, and Investigation holds the investigation experience.
  • Response Tasks, Related Records and Other Records hold linked work, covered below.
  • Post Incident Review displays post incident assessments and reports once the incident reaches the Review state.

A contextual menu offers the quick messages and response templates configured for security incidents. The overflow menu holds Compose Email. Form actions include Calculate Severity and Associate MITRE ATT&CK Technique.

The investigation tools include a relationship graph of connected items, an interactive MITRE ATT&CK attack and defend technique graph, and an incident timeline that can be filtered by event type. When Major Security Incident Management is installed, the incident can be proposed as a major incident, promoted to one, or linked to one.

Related records: grouped lists

The Related Records tab presents classic related lists in grouped sections.

  • Business Impact: Configuration Items, Affected Users, Related Configuration Items, Related Users, Affected Services
  • Threat Intel: Associated Observables, Threat Lookup Results
  • Phishing: Associated Phish Emails, Associated Phish Headers
  • Related Security Incidents: Parent, Child and Similar Security Incident
  • SLA Records: Task SLAs
  • Observable Enrichment: Observable Enrichment Results, Associated MISP Events, MISP Enrichment Results
  • Sighting Search: Sightings Search Results, Sightings Search Details, Sighting
  • Endpoint Detection and Response: Host Details, Running Processes, Running Services, Logged On Users, Network Statistics, Get File, Isolate Host Entries, Additional Actions On Endpoint and Microsoft Defender for Endpoint-Related Machines Details
  • Source Events and Alerts: SIEM-driven lists, present when that integration is installed

Related list groups support creating, linking and unlinking records where those actions apply.

Adding a grouped related list

Administrators with sn_si.admin can add a view or a group in three stages.

  1. In the classic interface, open a security incident, right-click, choose Configure, then Related List. Create a named view, choose its related list fields from the slush bucket and save.
  2. In the Security Incident Response Workspace experience, open the UX Page Properties tab and select the relatedListLayoutConfig option.
  3. Add the view name to sn_si_incident.viewsUsedForGrouping, separated by a comma and with underscores in place of spaces. A view named Business Impact becomes business_impact. Adding it to si_other_records.viewsUsedForGrouping places the group on the Other Records tab instead.

The requiredRolesForGrouping property lists the roles that can see groups. A user with none of them sees the related lists stacked vertically. If the property is empty, any user can open the grouped lists. The role property is ignored when isGrouped is false; inspect that setting before changing role membership.

Response task related lists are not grouped. Each one appears as its own list on the Response Tasks tab after it is configured from the response task context menu, using the sirw view. This response task configuration also requires sn_si.admin.

For help planning this work, see ServiceNow implementation.

Other records and IT work

The Other Records tab shows IT records, which are incidents, change requests, problems and outages, and email records, which are drafts, sent and received emails.

Analysts with sn_si.analyst can create linked records from the incident. Incident, problem and change request forms ask for a configuration item, priority and short description, among other fields. An outage also takes begin and end dates and a type, and it tracks how long a configuration item was down.

To link an existing ITSM record with sn_si.analyst, open Other Records, select the record type under IT records, choose Link, pick the record and confirm. Check that the selected record appears under IT records. With sn_si.analyst, Compose Email from the overflow menu lets the analyst insert quick messages and saves drafts to Other Records. Quick messages and response templates are both created against the Security Incident table and then appear in the contextual menu.

Dashboards

Dashboards open from the SIR Dashboards icon on the left of the workspace home page, or from the Security Incident Management Workspace. For the general model behind dashboards, see ServiceNow Dashboard Explained.

  • Security Analyst Overview: Standard: Critical and high priority work, assigned incidents and tasks
  • Security Incident Explorer: Performance Analytics: Incidents by category, subcategory, location, priority and business impact
  • Security Incident Management: Performance Analytics: Volume, performance and progress from analysis to recovery
  • Security Incident Management Premium KPIs: Performance Analytics: Premium KPIs on the same incident flow
  • Security Operations Efficiency: Performance Analytics: Efficiency metrics for the SOC
  • Context Sensitive Analytics – SI Dashboard: Performance Analytics: Open incidents, average age and close time, same-day open and close share, stale incident share
  • CISO Dashboard: Performance Analytics: Planned for a future release

The Performance Analytics dashboards need the Performance Analytics for Security Incident Response plugin. Without that plugin, the standard dashboards are the ones that appear. Users with sn_si.manager or sn_si.admin can edit dashboards within the scope they belong to.

Capabilities and threat intelligence

The investigation canvas gathers observables, threat lookup results, sighting search and observable enrichment. To run an integration capability, open an incident from the list view, choose the Investigation tab, select Associated Observable or Configuration Items, select the items, click the Capability button and pick the application. Running capabilities requires sn_si_int_kit.integration_creator or sn_si.analyst.

Threat Intelligence Security Center integration sends data from the workspace and displays threat intelligence context, such as observables, inside it.

Questions about configuring the analyst experience

Can analysts land on Details instead of Overview?

An administrator with sn_si.admin can open SIR Workspace Properties and set sn_si_aw.is_details_default_landing_tab to true, then save. This makes Details the default landing tab when an analyst opens a security incident.

Why is a playbook absent from a security incident?

A playbook appears when a Process Automation Designer process exists and its trigger condition applies to the security incident. Check the process and its trigger before treating the absence as a workspace display problem.

Will closing a linked ITSM record close the security incident?

Changing the state of a linked incident, problem or change request does not change the security incident state. Work notes added to a linked record are also added to the security incident, so review the content before using notes for handoff.

Can workspace search find more than incidents?

AI Search can find response tasks, observables, security requests and indicators of compromise as well as security incidents. Filters include State, Assigned to, Category, Severity, Finding, Type, Configuration Item and Affected User. Choose the record type and filter that match the investigation question.

For the wider service, see the security incident response guides.