OBLYTECH Logo
OBLYTECH Logo

Share observables from a security incident

You can share observables from a security incident in Security Incident Response with members of your trusted circle. Open the incident, select the Observables tab, open an observable, and choose the Share observable related link. Enter a name and description, choose the circles, and select Submit. Sharing requires the sn_si.analyst role.

Confirm the role and scope before you start

Sharing requires the sn_si.analyst role. Confirm that your account holds it before you open an incident, because the Share observable link sits on the Observable form and the whole task depends on reaching it.

You choose which observables should leave the incident, and one share can cover several selected observables. Decide the list before you open the dialog box, because one description applies to everything you select. A few indicators, each tied to a finding the team can explain, are easier for a recipient to act on than a long set of values with no narrative behind them.

Timing matters as well. The description you enter travels with the observables, so a description written before the team understands an indicator can send the wrong signal. If the finding is still moving, decide with the incident lead whether the share should wait.

If the module is new to you, start with what Security Incident Response is, in plain language, then return here for the sharing steps.

Gather the details before you open the dialog box

A share goes better when the facts are in front of you before the dialog box opens. Keep these to hand:

  • The observable values you plan to share, copied exactly as they appear on the Observable form.
  • The finding each observable supports, in one or two sentences.
  • The current confidence level and any open questions the team has not closed.
  • The circles that need the indicators, and the reason each one needs them.
  • Any limits the incident lead has set on what may leave your organization.

Writing these down first also keeps the description from drifting. If you draft it from memory inside the dialog box, it tends to lose the detail that makes it worth reading.

Share an observable step by step

If the labels on your instance differ from the ones below, follow the labels you see.

  1. Navigate to the security incident you are working on.
  2. Select the Observables tab from the Show IoC Related List group.
  3. Select the observable you want to share.
  4. On the Observable form, select the Share observable related link.
  5. In the Observable Share dialog box, enter a Name for this threat share record.
  6. Enter a Description of the selected observables.
  7. Choose Circles to share the observables with.
  8. Select Submit.

When you submit, the observables are shared with the trusted circle you specified. The section on checking the share covers how to confirm the result.

Fields in the Observable Share dialog box

Writing the Name

The Name field labels the threat share record. A recipient may see the record as little more than a name in a list, so the label has to make sense without the rest of the incident. Include the indicator type and a short reference to the activity it relates to. Leave out internal ticket shorthand that your team alone recognizes.

Writing the Description

The Description field covers the selected observables, and one description applies to the whole selection. Group observables that share the same context so a single description fits them all. A description that works states what each indicator is, what it was seen doing, how confident the team is, and what a recipient should check in their own environment. Keep to facts the incident supports. If the team has not agreed to share speculation about an actor or a motive, leave it out.

For a single indicator, a workable pattern is three sentences. Name the indicator type and what it did, for example a domain that a phishing message linked to. Then state the confidence level. Finish with the check a recipient should run in their own logs.

Choosing circles

The field is labeled Choose Circles, which points to a selection rather than a single value. Pick circles according to who acts on the indicator, not according to who received the last share. Sending observables to a circle that cannot do anything with them adds noise for that circle. Read the selection once more before you select Submit.

Check the share and its sightings

After you submit, open the Threat shares tab and confirm the record exists. Check that the name and description match what you entered. A typo in a description is worth catching before a circle acts on the share.

If any of the shared observables contain sightings, those sightings are shared as well. Open the Sightings tab to see them. Compare that list with what you meant to share. A sighting you did not expect is a reason to review the observable before you share anything else from the same incident.

Once the record is confirmed, compare the circles you chose with the list you wrote down before you opened the dialog box. If they differ, note the reason in the incident, even when the share itself is correct.

Common mistakes when sharing observables

The problems below come up often enough to plan around.

  • Sharing an observable before the analyst has checked what it is. An indicator that is still being validated can push a recipient toward the wrong action.
  • Writing a name that the incident team alone can decode.
  • Filling the description with the indicator value and nothing else.
  • Choosing circles out of habit rather than by relevance.
  • Treating the share as the record of the investigation. The share is a message to a circle. Your team’s record of the work belongs in the incident.
  • Skipping the check after submit. Errors in the name, the description or the circle list are easy to spot in your own view and awkward to spot after a circle has read them.

For a wider list of pitfalls across the incident lifecycle, read common Security Incident Response mistakes and how to avoid them.

Set a sharing process your team can follow

The clicks take a minute. The harder part is agreeing on who decides that an observable leaves the incident. In many teams, the analyst who ran the investigation proposes the share and an incident lead approves it. Write that rule down next to your other incident response runbooks, so a new analyst does not have to learn it by watching.

Record the decision in the incident using the notes practice your team already follows. Later reviewers should be able to see what was shared, why, and when. A short line is enough: the observables, the circles, and the reason.

Review what you shared when the incident closes. Check whether the circles still need the observables and whether the description still matches what the team now knows. If either answer is no, record it as a follow-up item in the incident.

The approval habits fit within the wider practice set out in security incident response best practices. If your indicators also move between other tools, plan that flow as a separate piece of work, and start with security incident response integration patterns.

For help planning this work, see ServiceNow implementation.

Questions about sharing observables from an incident

Does sharing an observable also share the whole incident?

The steps here cover sharing observables. Keep the incident record under your team’s usual controls rather than assuming the share includes it.

What should a description say about an observable that is still under review?

Say so in the description. State what the team has verified, what is still open, and when the team expects to settle the open part if that date is known. Do not present an open question as a settled one. A recipient who reads a provisional description can decide how much weight to give it.

How long should a threat share name be?

Length matters less than legibility. Keep the name short enough to scan in a list and specific enough to tell it apart from another share with similar indicators. If you find yourself adding a second clause, move that detail into the description.

How should I handle an observable that came from another source?

Verify it before you share it under your team’s name. An indicator from an outside feed carries the uncertainty of that feed, so name the source in the description and state what your team has checked. If you cannot check it, say that plainly rather than presenting it as your finding.