OBLYTECH Logo
OBLYTECH Logo

MITRE ATT&CK in ServiceNow Security Operations: Setup Guide

MITRE ATT&CK in ServiceNow Security Operations means loading the public tactic and technique catalog into the platform, then attaching the right techniques to incidents. Setup has three stages: activate the framework collections, enable extraction rules that read techniques from incoming data, and roll those techniques up to security incidents using the system properties.

What the framework adds to an incident

MITRE ATT&CK is a knowledge base of tactics, techniques and procedures. A tactic is the adversary’s objective for an action. A technique is the method used to reach it. One technique can belong to more than one tactic: Access Token Manipulation, for example, can serve either Privilege Escalation or Defense Evasion. The extraction methods below therefore treat a tactic and technique as a pair. For other terms used in this guide, see the ServiceNow concepts index.

The matrices you can load are Enterprise, ICS and Mobile. The Pre ATT&CK matrix has been deprecated by MITRE and merged into Enterprise, so it needs no collection of its own.

SIEM alerts, threat lookups and observables can arrive with technique information attached, though not every integration supplies it. Once it sits on the incident, analysts see which techniques are attached to it. The MITRE data sits in its own MITRE-ATT&CK repository, which is reached through the Threat Intel Library menu, so check which repository a count comes from. For how SIEM data reaches the platform, see SIEM event ingestion integrations.

Preparing the instance and the roles

Install or update Threat Intelligence Support Common and Threat Intelligence to version 12.0 or higher, which populates the MITRE collections. The setup steps below name the sn_si.admin and sn_ti.admin roles. The threat intelligence side of the product has its own overview in the ServiceNow Threat Intelligence guides.

Each area expects a specific role:

Area Role named in the setup topics
Framework profile and collections sn_ti.admin
Observable, object and RSS extraction rules sn_sec_tisc.admin
Threat lookup and SIEM auto-extraction rules sn_ti.admin and sn_si.admin
Associating techniques with an incident sn_si.analyst
Heat map and navigator sn_ti.read and sn_ti.mitre_analyst
Dashboard sn_si.ciso, sn_si.analyst, sn_si.manager and sn_ti.read

Activating collections and handling revoked techniques

Open Threat Intelligence, then Sources, then TAXII Profiles, and select the MITRE ATT&CK profile. Set Active to true on each collection you intend to use (Enterprise, Mobile or ICS ATT&CK) and activate the matching matrices.

The Run option defaults to On Demand. Selecting Daily produces an error and falls back to On Demand, because scheduled refreshes are restricted to limit load on MITRE’s servers. MITRE updates ATT&CK data about twice a year, so set a Run frequency that suits your review cycle. Collections are not refreshed while inactive. They ship inside the Threat Intelligence Core plugin, and installing Support Common and Threat Intelligence at version 12.0 or higher populates them.

Revocations are the step teams tend to miss. When MITRE revokes a technique or removes a tactic-to-technique mapping, the next ingestion retires that pair and the associations built from it. Retirement is a soft delete, and a restored pair returns automatically. Retired pairs leave the canvas, cards and reports, but associations stay on your records until you delete or remap them. Open the Revoked Tactic-Techniques list and work each pair still marked Review, In Progress or Error. Check the Review Reason and the entity and case associations the pair produced, then delete them or re-map them to a pair MITRE still publishes.

Writing technique extraction rules

Extraction rules read tactic and technique identifiers from incoming text, so techniques reach records without manual entry. Observable, object, RSS and enrichment rules sit under Threat Intelligence Security Center, in Administration, Rules Engine, MITRE ATT&CK Technique Extraction Rules, which requires sn_sec_tisc.admin. Threat lookup and SIEM rules sit under Threat Intelligence, in MITRE ATT&CK Administration, as Technique Extraction Rule.

Choose the extraction method against the shape of the source data:

Method What it does Use it when
Tactic and Technique Regex Extracts tactic and technique IDs as linked pairs The source names the tactic beside the technique
Technique Regex Extracts technique IDs and maps each to its MITRE tactic pairs The source gives technique IDs without tactics
Script Runs your own logic over the record or lookup result The payload needs parsing beyond a pattern

Scope is set by integration type: all data sources, threat intelligence feeds, API sources, RSS feeds, threat lookup integrations, or observable enrichment integrations. For threat intelligence feeds, the supported feed types are STIX (TAXII or HTTPS), MISP and custom feed. A rule cannot be enabled if its data source and integration type pairing matches an enabled rule, and a threat lookup vendor name can conflict in the same way. Resolve the existing rule first.

Four sample rules ship disabled: data source ingestion, CrowdStrike Feed, threat lookup, and observable enrichment. Duplicate lets you adjust a copy, and Disable stops a rule being used for MITRE data extraction.

Extraction rules act on the observables, objects and threat lookup results they target, and threat lookup rules read the raw payload of each result.

With a tactic identifier in the payload, the platform links the extracted tactics that MITRE maps to that technique. Without one, it links each tactic MITRE maps to the technique, so one technique can appear under several tactics.

To check results, open Related Records, select MITRE Techniques, and click a technique ID. If a result looks wrong, add the Extraction Rule column from the List Actions icon and open Technique Source Relations to see which rule produced it.

Threat lookup auto-extraction uses the Threat Lookup rule type with source engine Global. SIEM rules map an import table and field, and the base system covers Splunk, IBM QRadar and ArcSight. Enable either the SIEM rule or the alert rule for a source, not both.

Rolling techniques up to security incidents

There are two routes onto an incident. Manual association comes first, because it shows what a rollup will do. Open Security Incidents, choose Show All Incidents, open the incident, and select the Associate MITRE ATT&CK Technique link. Pick a source from the activated list, choose the tactics and techniques that fit, and select Save. The bin icon removes a source with its tactics and techniques, the minus icon removes a tactic, and the x icon removes a technique. For background on incident management in general, see the ServiceNow Incident Management guides.

For observable-level detail, right-click an observable on the Associated Observables tab and select Associate MITRE ATT&CK Technique, then roll up to the incident. For the wider process around these records, see the ServiceNow Security Incident Response guides.

Automatic rollup is governed by four properties under MITRE ATT&CK Administration, Properties:

Property Default in the Brazil release Brings onto the incident
Observables to security incident Yes Techniques attached to observables
Threat Lookup results to security incident Yes Techniques from threat lookup results
Alert rules to security incidents No Techniques from detection rules matched by name
Child security incidents to parent Yes Techniques from child incidents

The alert rule route needs more setup than the others. Enable its property, then map each detection rule in the Detection Rules – MITRE ATT&CK TTP Mapping module. The alert rule name on the incident must match exactly, and several names are separated by commas. Turn on Show origin on the MITRE ATT&CK Card, and the techniques should show Detection Rule as their origin.

For a parent incident, open the Child Security Incidents tab, select a child, and choose Roll up MITRE ATT&CK Information to SI. That action carries both ATT&CK and ATLAS technique information. Select Reload to confirm.

The MITRE ATT&CK Card offers a navigator view, where Show origin displays where each technique came from, and a list view that presents the same data as a table.

Reading coverage on the heat map and dashboard

Open Threat Intelligence, then MITRE ATT&CK Repository, then Heatmap and Navigator. Select a source, then apply primary filters such as Adversary Group, Tool, Malware, Platform or Data source. You can save three custom views per collection, set a default, and export or import them as JSON.

Detection coverage colors each technique from your own mapping: red for no detection, blue for full detection, and orange, yellow or light blue for partial. Mitigation coverage uses its own definition, with red for none, orange for poor and blue for excellent. The threat group overlay cannot run while detection or mitigation coverage is on, so switch one off first.

The analysis overlay works on one or more security incidents. Enter incident numbers separated by commas, then turn on Enable Overlay / Analyze, so the incident’s techniques sit over an adversary’s kill chain and the overlap shows whether an attack matches a known group.

The dashboard, under the same repository menu as Overview, shows incidents by technique and tactic over a window such as 90 days, plus the top critical assets carrying techniques.

Frequently asked questions

Why does my MITRE collection not appear when I associate techniques?

Collections and matrices appear in the source list once activated. Open the MITRE ATT&CK profile under TAXII Profiles, set Active to true on the collection you need, activate the matching matrix, and reopen the association pane.

Why did a technique disappear from an incident?

MITRE may have revoked the technique or removed the tactic-to-technique pair. The next ingestion retires that pair and its associations. Check the Revoked Tactic-Techniques list. If MITRE restores the pair later, it returns automatically.

Why did an alert rule not roll its techniques up?

Three things must line up: the alert rules property is enabled, the detection rule is mapped in the TTP mapping module, and the alert rule name on the incident matches the mapped name exactly.

Can I remove a technique without deleting the source?

Yes. Select the x icon beside the technique in the association pane. The minus icon removes a tactic. The bin icon is different, because it removes the whole source with its tactics and techniques.