The ServiceNow investigation canvas is a graph workspace inside Threat Intelligence Security Center. Threat analysts use it to map observables, indicators and entities as connected nodes, attach a case or another canvas, add MITRE ATT&CK techniques, and save the parts of the graph they want to keep.
What the canvas shows
Each object on the graph carries a colour for its object type, and the graph also shows its node type and status. For observables and other object types, status reflects reputation, such as Suspicious, Low or Critical. Indicators show their threat severity instead, so higher-risk items stand out during review.
The canvas maps one-to-one and one-to-many links between observables, indicators of compromise, threat actors, attack patterns and affected assets. A single observable can connect to several indicators.
Starting a canvas
Open Workspaces, select Threat Intelligence Security Center, then click the Threat Analyst Workbench icon. Creating a canvas requires the sn_sec_tisc.analyst role. There are two starting points.
| Starting point | What it gives you |
|---|---|
| New blank canvas | An empty canvas with no nodes and no links |
| Canvas opened from a case | A canvas attached to an existing case, which can be edited and renamed and can start with that case’s artifacts as nodes |
Go to Investigation Canvases, choose All Canvases, and select New. The form has five fields: Name, Description, Linked Case (which lists cases that have no canvas yet), Priority and State. After saving, the record shows Artifacts and Investigation Canvas sections.
Bringing data onto the canvas
Adding observables from the library
In the Investigation Canvas section, select Add from Library. It brings in observables of a type you choose, up to a number you set, from the threat intelligence library. The Add From Library graph action also draws relationships between the imported node and the nodes already on the canvas.
Temporary work and saved work
Imported nodes stay temporary until you select Save Canvas. Refreshing before saving can lose them. A relationship you draw between two nodes appears as a dotted line, which marks it as temporary. Selecting Add Data to Library writes the new nodes, links and edited edge labels into the library, adds the canvas nodes to the linked case as artifacts, and turns the dotted line solid. A confirmation appears when the write succeeds. For common pitfalls, see the mistakes guide.
Adding nodes and relationships from a case
Open a case record, go to Investigation Canvas, and select New Node. Choose an Entity Category, either Observable or Object, then an Entity Type. The form shows key fields such as Name and Description, plus any fields that identify the parent entity. If the same value and type already exist in the library, the form returns an error, so search before creating a duplicate.
New nodes carry a dot that separates them from library and artifact nodes. Right-click a node to choose Add Relationship, which offers one-to-many, many-to-one and many-to-many links. Right-click and choose Show Details to inspect it, or Open Record to view the full record in a new tab.
Canvas controls and filters
| Control group | Actions |
|---|---|
| Form | Link Case, Unlink Case, Save, Duplicate, Delete |
| Graph | Find on map, Canvas Filter, Save Canvas, Add Data to Library, Add From Library, Add From Case Artifacts |
| Node | Mark as Home Node, Add Relationship, Show Details, Open Record, Remove from Canvas, Fetch Related Records |
| Edge | Edit label, Remove |
| Toolbar | Zoom in, Zoom out, Fit to screen, Export map as PDF, Refresh, Clear Canvas |
Canvas Filter hides record types without deleting them. Filter out Campaign records and they leave the display temporarily, which helps analysts focus on observables or threat actors. Mark as Home Node sets a focal point: when the analyst pivots, the canvas centres that node and highlights it. Fetch Related Records opens a dialogue for choosing record types, and Add All includes all related types in one step.
Refresh reloads data from the library and discards unsaved changes, so save first. Clear Canvas removes nodes from view after a confirmation. The legend explains how each node and link appears, and lists the observables, indicators and objects currently shown.
Grouping nodes to reduce clutter
A grouping button appears on nodes that have connections leading out. Grouping hides children that have a single parent, including those several levels down. A child with more than one parent stays visible, but the lines from the group to it are hidden. Ungrouping restores everything. Importing a related record that connects to a hidden node expands the group. Filtering a grouped node hides the whole group. Inside a group, Show Details, which reports on the parent node, stays enabled while the other actions are disabled.
Linking cases in both directions
When a case is created, the user must either create a canvas or link an existing one. After that link exists, canvas actions such as New Node and the timeline appear on the case. For the lifecycle around these cases, see the security incident response guide.
Linking an existing case
On the canvas, select Link Case, choose the Case ID, and select Link. From the case side, open Case Management, select All Cases, open the case, select Link Case in the Details section, and pick a case ID. Unlink removes the association.
Creating and linking a new case
If no suitable case exists, the Create New Case dialogue includes a system-generated Case ID, a short description, a case type, priority, assignment group, status and assignee. Case types include Threat Hunting, Request for Information, Vulnerability Management Case, Compliance Case, Incident Response Case, Collaboration Case and Others. Select Create and Link to connect the case and canvas.
Linking a canvas from a case
If a case’s Investigation Canvas section is empty, select Link Case there, pick the canvas, and select Link. Wait for the refresh message confirming the canvas data has reloaded.
Plotting events on the timeline
Select the Show Timeline toggle in the Investigation Canvas section. The timeline places events on a time axis for the entities on the canvas.
| Element | What it shows |
|---|---|
| Range indicator | An event that ran over a period |
| Event indicator | A single moment on the axis |
| Icon | A visual marker for the event type |
| Popover and tooltip | A pop-over on select, a tooltip on hover |
| Grouped events | Events placed close together, combined into one marker |
| Zoom and move controls | Zoom in and zoom out move the view to later or earlier times, and the backward and forward controls step through time while keeping the same range. |
Set Start Date and End Date, then select Apply to focus on one stretch of activity. To add an event, right-click a node, choose Show Details or Open Record, then open the Timeline Events entry in the form’s Related Records section and select Add. A node can hold several events.
Some events appear without manual entry. The system property sn_sec_tisc.timeline_node_fields holds first_seen and last_seen by default, and File observables show First Seen and Last Seen when those fields contain values. You can modify the property to add or remove fields.
Mapping MITRE ATT&CK techniques
In a case’s Investigation Canvas tab, drag the resizable divider to reveal the framework, then choose a matrix from the Matrix drop-down. Each matrix names its ATT&CK collection version, for example Enterprise ATT&CK v18.0. Associations MITRE has stopped mapping are excluded. The top row lists tactics with their technique counts, and selecting nodes highlights the techniques linked to them. The framework refreshes when nodes are added, removed or filtered. For broader guidance on the module, see the threat intelligence best practices.
| View control | Effect |
|---|---|
| Show ID | Displays the technique ID, such as T1059, on each card |
| Show Sub Techniques | Expands parent cards to show sub-techniques |
| Show Only Associated Techniques | Hides techniques with no link to a canvas node, and counts only linked techniques per tactic |
Saving MITRE filters
Select Filters to filter by MITRE Group, MITRE Malware, MITRE Tools, TISC Tags and Priority of Techniques, then select Apply. Save as New Filter stores the criteria under a unique name. Save Current Filter updates a saved filter and can rename it. Delete asks for confirmation. Saved filters belong to the analyst who created them, so other analysts do not see them.
Selecting the group APT32 (G1001) shows the techniques linked to it. Matches appear in blue text. Matches that also attach to canvas nodes appear in bold blue with a border. Grey parent cards appear when a matching sub-technique sits beneath them.
Where the canvas fits
The canvas sits inside the Threat Analyst Workbench, alongside cases and case tasks. A case task links to its parent case through a Parent Case ID lookup. If your team is deciding how the wider threat intelligence module should fit its processes, the threat intelligence hub sets out the main decisions, and the security operations overview shows how threat work sits beside incident handling.
Frequently asked questions
Who can create an investigation canvas?
Users with the sn_sec_tisc.analyst role can create one.
Why did my nodes disappear after a refresh?
Imported nodes, new nodes and new edges stay temporary until saved. A refresh reloads from the library and discards unsaved changes. Save the canvas and use Add Data to Library before refreshing.
What does a dotted line between two nodes mean?
It marks a temporary relationship that has not reached the threat intelligence library. Add Data to Library turns it into a solid edge.
Why is a technique missing from the MITRE view?
The framework leaves out tactic and technique pairs that MITRE has stopped mapping. Show Only Associated Techniques limits the view to techniques linked to canvas nodes.
Can other analysts see my saved MITRE filters?
No. Saved filters are user-specific, so each analyst sees their own list in the drop-down.