A hazard assessment in the ServiceNow Health and Safety Risk Management application records one hazard from a risk analysis, its possible effect and the controls that could prevent it. The hazard is rated before and after those controls, and the risk matrix turns each rating into a risk level.
Where a hazard assessment fits in a safety risk assessment
A safety risk assessment identifies the potential hazards and risks tied to a process, system, product or activity, then puts measures in place to prevent or reduce them. The hazard assessment is the smallest working unit inside it. It takes one hazard, places it inside a risk analysis, and records how serious the hazard is and how likely it is to occur with and without controls.
The safety team runs the wider assessment from the Health and Safety Workspace. A reviewer and an approver can be assigned to the finished assessment, and only a user with the risk assessment approver role can be set as the approver. Health and Safety Risk Management is one of several applications in the Health and Safety suite. The environmental side is described in the environmental management overview. For the wider risk management picture, see the integrated risk management guide.
Preparing the hazard and control lists
Defining hazards
Hazards are maintained in the Configuration tab of the Health and Safety Workspace. Each hazard carries a risk category, a job location where it may arise, and an active flag. A hazard must be active before it can be used. Maintaining this list needs the risk manager or risk data manager role. Add all hazards that are possible for a job and location, and review the list regularly, because a list that falls behind the work on site weakens each assessment built from it.
A defined hazard can then be selected in three places: the Hazard field on a job’s hazards and controls form in the job register, the add hazards window on a JSA form, and the Hazard being assessed field on the hazard assessment form. One record therefore serves all three, which keeps the wording consistent.
Building the control measure library
Control measures have their own list. Each control is assigned a category from the hierarchy of controls table, along with a job location and an active flag. Like hazards, a control must be active before it can be used, and the same risk manager roles maintain the list. Once a control is in the library, it can be selected on the job register form, the add control measures window on a JSA, and the hazard assessment form.
If a needed control is missing during an assessment, a risk assessment manager can select Create new control on the hazard assessment form and define it there. Those on-the-spot entries are worth reviewing afterwards, because a control created mid-assessment is often named in a hurry.
Using predefined jobs
The job register holds the jobs your organization performs. A job is single-step or multi-step. A single-step job holds its hazards and controls at job level. A multi-step job holds them against each step, and the Order field sets the sequence of steps. Each hazard on a job or step needs its own hazard and controls record. Copying a job is a quick start for a similar one, but the location value is not carried over, so set it again.
Configuring the risk matrix
A risk matrix sets likelihood against severity and defines the risk tolerance bands that label each result. The application includes predefined matrixes, which you can review and modify, or you can add new ones. For general background on the terms used here, see the ServiceNow concepts guide.
| Field | What it controls |
|---|---|
| Matrix grid | Grid size, for example 4 by 4 or 5 by 5 |
| Likelihood level | Text describing each likelihood step |
| Severity level | Text describing each severity step |
| Risk tolerance | Range, color and title for each risk level |
| Risk matrix preview | Live heatmap of the levels, colors and ranges |
| Active | Must be on before the matrix can be used |
The grid sets the number of levels. A 5 by 2 grid has five likelihood levels and two severity levels, so the descriptions must match those counts.
Reading the risk tolerance ranges
Each range is the likelihood level multiplied by the severity level. As a worked case, a level 3 likelihood (once per month) and a level 2 severity (minor) give 3 x 2 = 6. That falls in the 3 to 6 range, so the hazard displays as Moderate. Check that each product lands in exactly one band, using the heatmap preview, which updates in real time.
Timing matters. Configuring a matrix sits with the risk manager role, and a matrix already used in a risk assessment cannot be changed. Settle the grid, the descriptions and the bands before the first assessment, and use the preview to check the colors before saving.
Recording a hazard assessment
Open the Health and Safety Workspace, select the risk management icon, open the Risk assessment list and the assessment, then open the risk analysis containing the hazard. In its Hazard assessments tab, select New. This needs the risk assessment manager or risk assessment writer role. Once saved, the assessment is listed in that same tab, which is where you return to review or adjust it.
The form has these fields:
| Field | Purpose |
|---|---|
| Risk analysis | Filled in from the analysis the assessment belongs to |
| Job under assessment | The predefined job, if there is one |
| Job step under assessment | Shown when the job has several steps |
| Hazard being assessed | The hazard under review |
| Hazard category | Filled in from the selected hazard |
| Effect caused by this hazard | The likely outcome, for example burns |
| Available control measures | Controls that can be selected |
| Selected control measures | Controls that could help prevent the hazard or minimize its effect |
| Inherent severity and likelihood | Values before controls |
| Residual severity and likelihood | Values after controls |
| Inherent risk and residual risk | Levels calculated by the matrix |
Describe the effect concretely, since the severity score is easier to justify that way. Select all controls that can help prevent or minimize the effect, reviewing the full available list before saving. Choose the job step too, so the assessment traces back to the exact task.
After controls, the residual risk should come down. If the residual risk does not come out lower than the inherent risk, check first whether the selected controls actually address the effect, and whether the scores were entered in the residual fields rather than the inherent ones. Each hazard in a risk analysis needs its own hazard assessment.
Rolling hazards up into risk analyses
The inherent and residual severity and likelihood on a risk analysis are calculated from its hazard assessments. The overall level is set by the highest identified risk in the Risk analyses list, so one high-scoring hazard can raise the level for the whole assessment.
When all identified hazards in a risk analysis have been assessed, set its State to Complete, then repeat for each analysis. The computed levels also appear in the header of the risk assessment form, so the overall position is visible without opening each analysis. When all analyses are complete, the risk matrix section shows an inherent risk view (before controls) and a residual risk view (after controls). Each number counts the analyses at that level, so comparing the two views shows whether the controls moved the exposure.
To import a job instead of typing hazards again, select Create risk analyses on the risk assessment in the Brazil release, choose the job in the Select jobs field, and select Create. One risk analysis is created per job step, and a job with no steps produces one record. The imported hazards still need their severity and likelihood scored for your own site.
The Xanadu release used an older flow. Records were added in the Risks and controls tab, with headers reading Risk before controls and Risk after controls. Teams moving from that flow should update their procedures rather than assume the steps carry over.
Frequently asked questions
Does a hazard need to be defined before I assess it?
Yes. The Hazard being assessed field draws on the hazards list, and the hazard must be active.
Why does each hazard have two ratings?
The inherent rating describes the hazard before controls, and the residual rating describes it after the selected controls. The gap between them shows how much the controls reduce the risk.
Can I start from a predefined job?
Yes, in the Brazil release, through Create risk analyses. Each job step becomes its own risk analysis, and the imported hazards still need scoring.
Can I edit a matrix after it has been used?
No. A matrix already used in a risk assessment cannot be changed, so finalize it first.
Next steps
Configure in this order: hazards, controls, the matrix, the jobs, then the assessments. Jobs draw on the hazard and control lists, and assessments draw on an active matrix, so those need to be in place first. Teams wanting help scoping that sequence can start with the ServiceNow services overview. When a hazard leads to an actual event, the incident reporting and follow-up process takes over, and the event is recorded and investigated in Health and Safety Incident Management.