OBLYTECH Logo
OBLYTECH Logo

Track OSHA injury and illness forms

To track OSHA injury and illness forms in ServiceNow, generate an OSHA 300 Log or OSHA 300A Summary for one establishment and one calendar year. The annual forms collect recordable injuries and illnesses from January 1 through December 31. Review report eligibility, establishment assignments, annual hours, and saved output before completing your review.

Define the annual OSHA injury and illness reporting scope

The starting point is the establishment, rather than an organization-wide collection of unrelated incident records. ServiceNow generates the OSHA 300 Log and OSHA 300A Summary per establishment per year. Decide which establishment and calendar year you are reviewing before opening the generation dialog. Keep those choices together throughout your checks so a correct form is not mistaken for a different location’s annual record.

The OSHA 300 Log lists work-related injuries and illnesses, while the OSHA 300A Summary presents the annual summary. Generating one does not remove the need to choose the other form type when that output is needed. A common sequence is to check the underlying recordable reports, generate the log, then review the summary against the same establishment and year.

For the broader relationship between these outputs and the individual incident form, see ServiceNow OSHA 300, 300A, and 301 reporting. Keep this annual review focused on the completeness of the establishment’s reporting population and the generated files.

Prepare the content pack, access, and report inputs

The Health and Safety Incident Management OSHA Content Pack, identified as com.snc.sn_hs_im_osha, must be installed. Its setup includes establishment information, saved PDF templates, and OSHA system properties. Installing the content pack requires the admin role. Generating annual forms requires sn_ohs_im.compliance_manager. These are distinct actions with distinct access requirements.

Before generating output, review the injury and illness reports intended for inclusion. The Recordable option must be selected, and the Establishment field must contain the establishment name. A report’s presence in an incident list does not by itself establish that it belongs in the annual form. Check its eligibility and establishment assignment together.

  • Confirm that the intended reports are marked Recordable.
  • Check that their Establishment values match the location under review.
  • Review whether their occurrence dates belong to the selected calendar year.
  • Check establishment annual information before reviewing summary hours.

Use these checks as a preparation checklist, with a named reviewer responsible for resolving questionable source records. Do not treat form generation as a substitute for deciding whether an injury or illness is recordable. The output depends on the reporting data supplied to it.

The navigation and labels below follow the Brazil workflow; check them on your instance and release before incorporating them into team instructions.

Generate the annual log and summary

With sn_ohs_im.compliance_manager, navigate to All > Health and Safety > Health and Safety Workspace. Select the incident management icon and open the Lists tab. Under Injury / illnesses, choose Recordable to review recordable reports or All to review the broader report list. Inspect the Recordable column before starting generation.

  1. Select Generate OSHA forms.
  2. In the Generate OSHA form dialog box, set Form type to OSHA 300 Log or OSHA 300A Summary.
  3. Select the Establishment whose annual records you want to include.
  4. Choose CSV or PDF in File type.
  5. Set Year to the calendar year being reviewed.
  6. Select Generate.

The establishment and year selections define the annual scope. Do not assume that opening a filtered list replaces those dialog choices. If a team manages more than one establishment, track each establishment and year as its own checklist entry covering preparation, generation, and acceptance.

PDF generation fills the saved templates with values from the recordable injury and illness reports. CSV produces output in CSV format. When a PDF is generated, the form name link in the dialog provides a download route. Record the chosen form type, establishment, year, and file format in your review notes so another reviewer can reproduce the selection. Also record any unresolved discrepancies, who will investigate them, and whether another output review is needed.

Check summary hours and investigate missing records

For the OSHA 300A Summary, total employee hours come from the establishment’s annual information. If hours are unavailable for the selected year and establishment, the report uses the default from the Total hours worked system property. A populated hours figure therefore needs review: its presence alone does not show that it came from the intended establishment-year information.

Check the annual information first when hours appear unexpected. Establish whether the selected year has the intended value, then examine the fallback value if annual hours are missing. Investigate that separately from the injury and illness population, because summary hours and included records come from different inputs.

If an expected injury or illness is absent, work backward from the generation choices. Check the selected establishment and year, then inspect the report’s Establishment and Recordable values. Where a missing record is a source-data problem, changing the PDF template typically does not fix it, so check the report inputs first. Compare the saved output with the relevant report records before accepting it.

To correct or confirm a year’s figure, a user with sn_ohs_im.compliance_manager opens the establishment record from the Establishments list in Health and Safety Workspace and adds the year on the Annual information tab. The annual total is built from periods rather than typed in once. Each period needs a start date, an end date, and the hours worked in that period, and the periods for the year add up to the annual total shown in the Total hours worked column.

  1. Open the establishment record and select New on the Annual information tab.
  2. Enter the year in the Year field and save the record.
  3. On the Periodic total work hours tab, select New and enter the start date, end date, and Total hours worked for the period.
  4. Repeat for each period in the year, then save.
  5. Confirm that the period hours add up to the annual figure before you rely on the summary.

A year with no annual entry falls back to the Total hours worked system property, so a default figure on a 300A summary can look plausible while being wrong for that establishment. A gap or overlap between periods is easy to miss when the summary shows only one number, so check the dates before accepting the total.

If the eligibility fields themselves have been customized, review that form configuration as a separate task before you change any PDF template. Do not treat it as part of the annual output check.

Retrieve saved forms and maintain PDF templates

The completed annual form is saved against the selected establishment. Viewing a saved OSHA 300 or 300A form requires sn_ohs_im.compliance_manager. In Health and Safety Workspace, select the incident management icon, open Lists, and choose All under Establishments. Open the establishment record and select the required OSHA form PDF in Attachments.

Make retrieval part of the acceptance check. Confirm that the file opens from the intended establishment and represents the form type and year you generated. Keeping the review anchored to the establishment helps prevent a downloaded copy from becoming the team’s sole point of reference.

Updating a PDF template requires sn_ohs_im.admin or sn_ohs_im.agent. In All, enter sn_hs_im_osha_template.list in the navigation filter and open the relevant template. Use Manage attachments to remove the old PDF and upload its replacement, then select Update. This changes the template attachment; the remaining activation and property steps still matter.

Open sys_attachment.list, select the uploaded attachment, and set State to Available. Use Copy sys_id on that attachment. Then navigate to All > Health and Safety > Health and Safety administration > Properties, update the corresponding template system property with the copied sys_id, and select Save.

Plan a generated-output check after a template change. Review both the attachment selection and property reference before investigating presentation issues. For help planning this work, see ServiceNow implementation.

The OSHA 301 form is saved to the incident, not the establishment

An OSHA 301 form relates to an injury or illness associated with a safety incident. Generating it requires sn_ohs_im.compliance_manager, the installed OSHA Content Pack, and a report marked Recordable. Open the injury and illness report through the incident or the Injury / illnesses list, review it, and select Generate OSHA 301 form. Choose the file format in the dialog and select Generate.

The generated 301 form uses the saved template and information available in the injury and illness report. It appears in the incident’s Attachments section. That storage location differs from the establishment attachment used for annual forms, so review instructions should identify which record the reviewer must open.

Write the handoffs down before deciding what to automate. A short checklist that names who prepares the records, who generates each form, and who accepts it covers the annual review without any new configuration.