Set up Hybrid Analysis malware sandbox lookups in ServiceNow by assigning the required roles, installing the core Security Operations applications, setting the outbound TLS SNI system property to true, and entering your Hybrid Analysis API key in the integration configuration. Then confirm that lookup results appear on a security incident.
Roles and prerequisites to check before setup
Setup uses three roles, and each one covers different work. Confirm that the right people hold them before you start, so no step stalls partway through the configuration.
Role assignments for each task
- The administrator (admin) installs the application, assigns the Security Incident Administrator (sn_si.admin) role, and performs the system property and integration configuration steps.
- The Security Incident Administrator (sn_si.admin) oversees the configuration, verifies the expected results, and has access to the Security Operations module. This role also assigns the sn_si.analyst role.
- The sn_si.analyst role is required to verify lookup results and to run threat lookups on child observables.
If an analyst can open an incident but cannot see lookup results, compare that analyst’s roles with the list above before you change any configuration.
Core applications and the com.snc.si_dep plugin
Install and activate the core ServiceNow applications that the integration depends on before you install the Hybrid Analysis application. On the Madrid release and later family releases, start with the com.snc.si_dep plugin. It installs the dependencies that the Security Incident Response product needs, and you should activate it before you install and activate the other Security Operations applications.
Then install and activate the following applications from the ServiceNow Store, one at a time, in this order: Security Integration Framework, Security Support Common, Security Support Orchestration, and Security Incident Response. Finish one application before you start the next.
Obtaining a Hybrid Analysis API key
The configuration step asks for an API key. If you do not have a Hybrid Analysis account, create one on the Hybrid Analysis site, then obtain an API key from your account. Keep the key ready before you open the configuration dialog so the setup does not pause halfway through.
Set the outbound TLS SNI system property
The integration needs one system property record set before you install the application. Complete this step as admin.
- In the navigation filter, enter sys_properties.list and press Enter.
- On the System Properties list, click New.
- In the new record, enter glide.outbound.tls_sni.enabled in the Name field.
- Set Type using the true or false option, and set Value to true.
- Click Submit.
Install the Hybrid Analysis application and enter the API key
For help planning this work, see ServiceNow implementation.
If the Hybrid Analysis application is not installed yet, install it by following the Security Operations integration install steps. After the installation completes, configure the integration:
- Go to Integrations > Integrations Configurations.
- Locate the Hybrid Analysis tile and click Configure.
- In the Hybrid Analysis Configuration dialog box, enter your API key and click Submit.
- Check the result. The configuration completed successfully when no error message appears.
Check that lookups run on a security incident
The security incident generates observables on its own, and the application scans them. After the application is configured, the lookup flow launches automatically when an incident is created, so you do not start it by hand. Use the steps below to confirm that it ran.
- Open the security incident record you are checking.
- Read the work notes. The execution and completion status of the lookup appears there.
- If the work notes do not confirm a completed lookup, follow the next-step guidance in the work notes before you continue.
- Go to the bottom of the record and click Show All Related Lists to view the results.
- Open the Threat Lookup Results tab.
The steps assume the incident form uses tabs. If your form does not, click the Settings gear icon in the upper-right corner of the banner frame, click Forms in the System Settings dialog box, and check that Tabbed forms and With the Form are selected.
In practice, the work notes are the quickest way to tell whether a lookup already ran on an incident, so read them before you run a lookup again, especially when another analyst has worked the record before you.
Reading the Finding column
On the Threat Lookup Results tab, the Finding column shows Unknown for records the lookup did not determine to be malicious. Results that match malicious show Malicious in that column.
Click an observable in the Observable column to open its record. When the lookup finds an observable malicious, the Finding field on that record displays Malicious, and the observable is tagged with the Threat Intelligence source that found it. For this integration, that source is the Hybrid Analysis integration.
Treat a Malicious finding as a reason to review the incident, not as the final word on it. Record the observable, the finding, and the Threat Intelligence source in your notes so the next person can follow the same trail. If you also want to understand the reputation calculations behind these results, see threat lookup reputation calculators in ServiceNow.
Review raw data and run lookups on child observables
A lookup can surface related observables. The Hybrid Analysis integration creates child, or related, observables from observables that appear in the raw data a lookup returns. Child observables show on the Child Observables tab because the lookup found an existing connection between them and the observable you started with.
To review the raw data and run a lookup on a child observable, follow these steps:
- On the Threat Lookup Results tab, click the blue information icon next to an observable.
- In the window that opens, click Open Record to view the data. The link created by the API, the raw data, and other information display there.
- Return to the security incident and click the Show IoC related link.
- On the Child Observables tab, click the field next to a child observable in the Child column to select it.
- Click the Run threat lookup related link.
- In the dialog box, confirm that the Hybrid Analysis integration is selected, then click Submit.
- Check the work notes for a successful lookup, then return to the Threat Lookup Results tab to find results for the child observables.
In practice, run one child observable at a time when you are checking a specific connection. That keeps each result tied to the observable it came from, which makes the trail easier to follow later.
To see the broader threat lookup flow, read how to look up a threat with the threat lookup flow. If a malware finding should start a response, the page on building a manual malware playbook is the next place to look: build a manual malware playbook in Process Automation Designer.
Checks to run after setup
Run the sequence above on one test incident before you rely on the integration for live cases. Confirm these items in order:
- The system property record for glide.outbound.tls_sni.enabled is saved with Value set to true.
- The four Store applications are installed and activated.
- The Hybrid Analysis configuration completes with no error message.
- The work notes on the test incident show the execution and completion status of the lookup.
- The Threat Lookup Results tab shows results for the observables on the test incident.
- The analysts who review results hold the sn_si.analyst role.
Questions about setup errors, missing child results, and release differences
What should I check if the configuration shows an error?
Start with the API key. If the configuration shows an error message, the API key may be invalid. Get the key again from your Hybrid Analysis account, reopen Configure on the Hybrid Analysis tile, and enter the key in the Hybrid Analysis Configuration dialog box. If the error continues, confirm that the glide.outbound.tls_sni.enabled property record is saved with Value set to true and that the four Store applications are installed and activated before you configure again.
Why does a child observable show no lookup results?
First confirm that the observable is a type the integration supports for lookup. Then check the work notes for a successful lookup before you return to the Threat Lookup Results tab.
Can I look up an observable that the incident did not generate?
Manual attachment is covered in a separate optional set of steps, named for attaching an observable for Hybrid Analysis. The steps on this page cover observables the security incident generates and the child observables a lookup returns.
Do the steps differ across releases?
The install and verification steps for Xanadu, Yokohama, Australia, and Brazil use the same field names, labels, and roles. Their last update dates differ, from August 2024 for Xanadu to September 2026 for Brazil, so check which release your instance runs and confirm the labels on screen before you follow the steps line by line.