OBLYTECH Logo
OBLYTECH Logo

Hardware Vulnerability Assessment for OT Firmware in ServiceNow

Hardware vulnerability assessment (HVA) checks the firmware on operational technology devices against published CVE records. It compares normalized firmware data, mapped to CPE names, with each device’s manufacturer, model and version. Matches are scored with a confidence value and shown as fully or partially matched assessments, which can become vulnerable items for remediation.

How a device is flagged as at risk

An operational technology device is treated as at risk when a CVE record in the National Vulnerability Database lines up with that device’s data in CPE-mapped normalized content. The assessment builds on the vulnerability assessment feature of Vulnerability Response, and adds a firmware layer specific to hardware. Range information from the database adds precision: when a CPE entry has no version, the range recorded for that publisher and model is used, and a version comparison decides whether the device’s version falls inside it. For the wider concept behind fixing a flagged item, see the remediation task explainer.

Why firmware normalization comes first

A discovery tool such as ServiceNow Discovery finds the firmware on each OT asset. Each installation links to a firmware discovery model that holds the publisher, product and version as the scanner recorded them. Normalization matches those values against the Enterprise Asset Management content library and attaches the best-fitting firmware model. For how the scans that feed this data are timed, see the discovery schedule explainer.

Devices without normalized content are assessed only when the property that includes unmapped discovery models is set to Yes. Those matches use a matching score and are approximate. HVA can work with unmapped discovery models using a matching score algorithm that compares CPE values with the discovered publisher name, model name and version. These matches are approximate, so results are less exact than fully normalized ones. They still help teams judge exposure until CPE-mapped content exists.

Reading the assessment tabs

Tab What it holds
Fully matched assessments CVEs whose manufacturer, product model and firmware version all match the device
Partially matched assessments CVEs that match the firmware version, or the manufacturer and model, but not everything
Vulnerable Items Vulnerable item records created from assessments, automatically or by hand
Ignored assessments Assessments for devices an analyst chose to set aside
Awaiting Normalization Device data with no normalized content yet, not yet used for an assessment

When the property that creates vulnerable items automatically is on, the Fully matched tab stays empty because those records move into Vulnerable Items. Also, once a device receives a new firmware version, its older assessments become expired and the device needs a fresh assessment. For background on the records themselves, see the vulnerable item explainer.

Confidence scores and the threshold

Confidence Score appears on partially matched assessments, vulnerable items and ignored assessments. Fully matched assessments score 1, because all the parameters in the CVE information agree with the discovery values. Partial matches score below 1.

Factor Partial match score Extra score for a full match
Publisher name 20 5
Model name 20 5
Version 0 25
Base score 25, given to all matched discovery models not applicable

The factor scores total 75 when all matches are full, and the base score brings the total to 100. In a worked case, the publisher contributes 25, the model matches partially and contributes 20, and the version does not match and contributes 0. With the base score of 25, the total is 70, or 0.70.

The hva_confidence_score_threshold property sets the minimum score a match needs before an assessment is created. It takes a decimal from 0.0 to 1.0, and the default is 0.75. At the default, the 0.70 case would not generate an assessment. A threshold of 0 is accepted, but a score of 0 still produces no assessment.

Setting up the assessment through guided setup

The Industrial Workspace Admin guided setup covers the whole configuration. Its path is All, Industrial Workspace Admin, Guided Setup, then Operational Technology Vulnerability Response. For the wider application, see the vulnerability response guides.

Assign the two HVA roles

The sn_vul.manage_exposure_assessment role lets a user view or edit assessment properties. The sn_otvr.vul_event_manager role, labelled OT Vulnerability Event Manager, lets a user view assessment records and act on them. An admin assigns these roles to users or groups through standard user administration.

Run the three NVD integrations

Install and run the three National Vulnerability Database integrations: CVE only, CPE only and Unmapped CPE. Running them requires the sn_otvr.vul_event_manager role and the admin role.

Configure the three properties

Property Default What it controls
sn_vul_analyst.auto_create_vits Yes Creates vulnerable items automatically for fully matched assessments
sn_vul_analyst.assess_unmapped_disc_models No Set to Yes to include discovery models with no CPE mapping
hva_confidence_score_threshold 0.75 Minimum confidence needed before an assessment is created

Schedule the Full and Delta jobs

The Full job is run on demand. It assesses all OT devices in the inventory regardless of earlier results, which sets a baseline, and it must run before the Delta job is scheduled. The Delta job is activated and set to a frequency such as daily or weekly. It is incremental, picking up changes to firmware, normalized content and vulnerabilities since its last successful run. The Mark Expired Assessments job flags older assessments once a firmware version changes, and expired assessments older than a month can be deleted. For the scheduling mechanics behind both jobs, see the scheduled job explainer.

Turn on the normalization opt-in

The Firmware Discovery Model opt-in shares unnormalized enterprise model data with the Enterprise Asset Management Content Service to improve the normalization process, and the opt-in makes OT device firmware data available for normalization. Open the Normalization opt-in task in the Admin center view of the Enterprise Asset Workspace, select the check box that accepts the Opt-In Agreement, and select Opt-In. Opting in enables the Firmware Discovery Models, and selecting Opt-Out in the same task stops the company contributing. The role needed is sn_eam.enterprise_admin.

Normalizing firmware in the OT Asset Workspace

Normalization happens in the OT Asset Workspace, which requires the OT Asset Management application. Each discovered firmware model carries a normalization status. For licensing questions about the workspace itself, see OT asset management workspace licensing.

Normalization status What it means
New Not yet processed by normalization
Match not found Nothing matched, or no normalization rule exists for the model
Publisher normalized Only the publisher matched
Partially normalized The product matched
Normalized A background job matched it and created a firmware model
Manually normalized An operator set the values by hand

A firmware model is created when a discovered record is normalized, or manually normalized with a product and version. It can also be created directly on the Firmware tab of OT Model Management, where Product and Version are required. An operator can set the normalized publisher, product and version directly on a record, and choose whether to exclude it from the content service.

Revert with care

Revert normalization applies to models that are normalized, partially normalized, publisher normalized or manually normalized. The normalized fields are cleared and the status returns to Match not found. The normalization rule attached to the model is deactivated, and that rule cannot be reactivated. The procedure is one-time. After the rule is deactivated, revert runs on the models that were normalized with it.

Add custom products, versions and CPE mappings

When the content library lacks a product, create a custom firmware product with a manufacturer, product name, eight-digit UNSPSC classification, description, and active and exclude flags. If an existing firmware publisher shares the manufacturer, it is associated automatically; otherwise a custom publisher is created.

The custom CPE mapping links a firmware product and version to CPE publisher, product and version values, which HVA uses to connect a device to CVE records. Those values should follow the CPE Product Dictionary, which the National Institute of Standards and Technology maintains. Creating custom products, versions and mappings needs the sn_eam.enterprise_admin role.

Create firmware models and lifecycles

Create a firmware model on the Firmware tab under OT Model Management, with Product and Version required. Lifecycle entries record a type, a phase, a start date and an optional end date. Phases are General availability, End of sale, End of support, End of extended support and End of life. Entries of the Internal type are not shared with the instance during a reverse push. When the content service already defines phases for a version, they populate automatically.

Move firmware content in and out of an on-premise instance

Import and export need the system property sn_itam_common.onprem_content_import_export set to true, an opt-in to the Enterprise Asset Management Content Service with the Custom Firmware Models KPI enabled, and the sn_otam.ot_asset_manager role. The import and export actions are available only in the OT Asset Workspace. To import, open Admin center, then Manage library and Import firmware content, attach the zip file, and select Run Import. The apply-latest-content-changes job then runs automatically. To export, choose Export firmware content and Run Export. The zip file is downloaded from the Attachments panel and sent to the Content Service team.

Frequently asked questions

Does a device need an exact firmware match to be assessed?

No. HVA can assess a discovery model without a CPE mapping when the property for unmapped discovery models is set to Yes. Those results carry a confidence score, and the threshold, which defaults to 0.75, decides which become assessments.

Why is the Fully matched assessments tab empty?

With automatic vulnerable item creation enabled, fully matched records move to the Vulnerable Items tab, so that tab is where to read them.

What happens when a device gets new firmware?

Its older assessments become expired once the version changes. The Mark Expired Assessments job flags them, and the device needs a new assessment, which the Full or Delta job supplies. Expired records older than a month can be deleted.

Why run the Full job before the Delta job?

The Full job assesses all OT devices regardless of earlier results, which gives the Delta job a baseline. The Delta job then processes only changes since its last successful run.