OBLYTECH Logo
OBLYTECH Logo

NVD and CWE Imports in ServiceNow Vulnerability Response

Before a third-party scanner sends its first findings into Vulnerability Response, the NVD and CWE reference data should already be in the instance. The NVD integration brings in CVE records and the CWE job brings in weakness types. This guide covers import order, CWE scheduling, the three libraries and how to confirm a run succeeded.

Why the NVD and CWE imports come before scanner data

On a first installation, or before the first import from a third-party scanner, the order is fixed. Install the NVD integration if it is missing, run the CWE scheduled job, and then import scanner findings. The NVD integration is an app available on the ServiceNow Store, and activating it on a production instance may need a separate license, so settle that before a change window is booked.

After the first import, library records can be refreshed on demand or on a schedule. Vulnerability Response keeps them under Libraries.

How the CWE scheduled job is configured

The CWE import runs through the CWE Comprehensive 2000 Integration. Its updates run On Demand from the integration record by default, so a recurring update needs the scheduled job configured.

The Run field offers On Demand, Daily, Weekly, Monthly, Periodically and Once. Each choice reveals the fields it needs, such as a Day for weekly and monthly runs or a Repeat interval for periodic runs.

The CWE update should run before the NVD database update. The NVD update defaults to Weekly on Monday at 01:00:00, so a CWE schedule that finishes earlier gives the NVD pass current weakness definitions.

Field on the CWE job What it controls Practical note
Active Whether the job runs Deactivate it to skip a period while keeping the parameters saved
Run Update frequency On Demand is the default
Day Weekday or day of month Shown for weekly or monthly runs
Time When the job starts Set it ahead of the NVD run
Report processor strategy Data Source Attachment or Custom Report Processor Custom processing needs a report processor script and a processor factory script

The job needs the sn_vul.vulnerability_admin role, or the older sn_vul.admin role, which is deprecated. Holders of sn_vul.vulnerability_read can run the job, and holders of sn_vul.vulnerability_write can edit it. Admin users can add repositories to it.

Execute Now starts the job immediately. To follow the run, reopen the job and select the Vulnerability Integration Runs tab.

Choosing the NVD integrations and what runs by default

Three NVD integrations come in the base system, and one of them is active from the start.

Integration What it retrieves Default state
NIST National Vulnerability Database Integration – API (CVE only) CVE vulnerability data Active, runs daily
NIST National Vulnerability Database Integration – API (CPE only) CPE data with a formal name format, a checking method and a description format Inactive; set to run daily once activated
NIST National Vulnerability Database Integration – API (Unmapped CPE) CPE data tied to the CVEs already fetched Inactive; set to run On Demand

The CPE-only integration stores its data in Vulnerable Software. The Unmapped CPE integration stores its data in a related list on the NVD vulnerability entry. Activate either one when you want that CPE detail captured.

Activating the Unmapped CPE integration makes it run after the CVE integration. Its first full import is started with Execute Now, and on that run CPE data is fetched for all retrieved CVEs regardless of the Import since value. Two cautions belong in any change request. Each integration record has a run-as user, which defaults to VR.System and should not be changed. The combined CVE and CPE integration is deprecated, so new setups should use the separate CVE and CPE integrations.

Reading the three libraries

Open the libraries from All > Vulnerability Response > Libraries. Viewing them needs the sn_vul.remediation_owner role.

Library What it holds How to use it
NVD Vulnerabilities from the National Vulnerability Database, with security checklists, software flaws, misconfigurations, product names and impact metrics including exploits Open a CVE record to see its links to vulnerable items, exploits and possible solutions
CWE Software weakness types from the CWE database, each with a knowledge article. Read each weakness and its knowledge article
Third-party Vulnerabilities imported from scanner integrations, with references, vulnerable items, exploits and CVEs Follow an entry into the vulnerable items it affects

Each CWE record comes with a knowledge article, but you cannot escalate a vulnerability from the CWE screen. Use the library to understand the weakness behind a finding, then escalate from the vulnerability record itself.

Vulnerability records are created automatically when data arrives from NVD, CWE or a third-party integration. The NVD entries sit in the National Vulnerabilities Database Entries library, where each CVE record links to its related vulnerable items, exploits and possible solutions.

How CVSS and SSVC shape severity and priority

The CVSS data in NVD and third-party entries describes the main characteristics of a vulnerability. Vulnerability Response turns it into a normalized severity value, which helps you assess and prioritize remediation. Severity is one input, though. Risk calculations and business context also shape the order of work.

SSVC adds a second layer of signal, and it is available only in Unified Security Exposure Management. NVD supplies three decision values per CVE:

  • Exploitation: None, Public PoC or Active.
  • Automatable: No or Yes. This is a different field from the Automatable supplemental metric in CVSS v4.0, so check which one a filter or report uses.
  • Technical Impact: Partial or Total.

If a risk calculator uses SSVC fields, a change to an SSVC value can trigger a recalculation. If it does not, the values stay viewable, filterable and reportable without changing any score.

SSVC values roll up from CVEs to third-party entries. When an entry is linked to several CVEs, Automatable is Yes if any CVE is Yes, and Technical Impact is Total if any CVE is Total. Exploitation takes the highest-priority value among the CVEs, in the order Active, Public PoC, None. To populate older CVEs that lack SSVC values, set the Import since field to an earlier date.

Known exploitation is a separate signal. The CISA Known Exploited Vulnerabilities integration flags CVEs in its catalog, rolls the flag up to the third-party entry, and rolls the earliest due date up to the vulnerable items. From version 21.0, a known-ransomware-use field is ingested too.

Keeping third-party libraries current

Third-party libraries refresh as scheduled jobs. Each integration has its own setup steps, listed with the Vulnerability Response integrations.

Setup Assistant installs the third-party applications you are entitled to. On production, confirm entitlements under Subscription Management > Subscriptions first. A non-production instance skips the entitlement step and activates the application from the Store. Setup Assistant also repeats the ordering rule: activate and import the NVD integration and the CWE job before a scanner application imports data. Vulnerability Solution Management is a separate subscription that adds Microsoft Security Response Center and Red Hat solution integrations.

Scanner detections need their own planning. A detection is one distinct occurrence of a vulnerability as a scanner reports it. Detections pair with vulnerable items, and an import creates a vulnerable item when none matches. Supported sources include Qualys, Rapid7, Tenable and Microsoft Defender Vulnerability Management, each sold separately.

Two behaviours surprise people on a first scanner import. Running more than one scanner against the same asset can create more than one vulnerable item for the same weakness. The duplicate-VI view finds these pairs, but only for combinations matched on CVEs. Detection counts can differ from vulnerable item counts, because each detection is paired with a vulnerable item using a detection key built from fields such as vulnerability, port, protocol and asset ID.

Checking import runs and handling a stuck import

Open Administration > Integrations, select an integration, and review its Vulnerability Integration Runs related list. The most common causes of a failed run are a network interruption and a data transfer problem that corrupts data during transform. Select Execute Now to rerun the integration after either one.

A quieter failure is the stuck import. Each import queue entry has a one-hour time limit. From version 18.2.4, the platform sends heartbeats during processing and updates the Last Record Processed field. An entry that passes one hour with a last record also older than an hour is treated as stuck and timed out. Two system properties govern this: sn_sec_cmn.record_threshold_heartbeat sets how many processed records trigger a heartbeat, and sn_sec_cmn.maximum_heartbeat_delay sets how long an entry can go without one.

A timeout error does not automatically mean lost data. The integration keeps processing after the error, so check the record count before assuming failure. If the count has stopped moving, rerun with Execute Now.

Frequently asked questions

Does the NVD integration have to run before a scanner import?

Yes. The setup order calls for the NVD integration to be installed and the CWE job to run before a third-party scanner imports its data.

Can I escalate a vulnerability from the CWE library?

No. The CWE library is for reference. Each CWE record has a knowledge article that explains the weakness, and escalation happens from the vulnerability record.

Why is the CPE integration inactive by default?

It is an opt-in. The CPE integrations capture a formal name format, a way of checking names against a system and a description format, so you activate them when you want that detail. The CPE-only integration stores it in Vulnerable Software.

What does a stuck import look like?

An import queue entry is stuck when it has passed its one-hour limit and its Last Record Processed field has not moved for an hour. If the Vulnerability Integration Runs list shows no change, rerun the integration with Execute Now.