OBLYTECH Logo
OBLYTECH Logo

Set up vulnerability solution providers

Solution providers are configured in the Setup Assistant after you install the Vulnerability Solution Management application. You open Integration Configuration, go to Solution Integrations, and add a source for solution data by URL, API, or file import. The vendor data arrives in CVRF or CSAF format.

Check the prerequisites and roles first

Vulnerability Solution Management has to be installed before provider setup starts. The checklist that comes before the Setup Assistant covers every vendor that supports the Common Vulnerability Reporting Framework (CVRF) or Common Security Advisory Framework (CSAF) data format. It asks for Vulnerability Response version 16.1 or later, the third-party account credentials that some integrations need, and authenticated vendor connections for any API-based feed. List your vendors before you add anything, since each integration needs its own unique name.

Settle the vendor spelling before you start, because the name you enter is copied into the Source field of every solution the integration imports. If you are new to the product area, the plain-language overview of Vulnerability Response explains where solution data fits in the wider process, and the implementation roadmap shows when provider setup should happen.

The required role depends on the action. Configuring providers in the Setup Assistant and creating URL or API integrations require sn_vul.vulnerability_admin, sn_vul.admin (deprecated), or admin. Importing a CVRF or CSAF file requires sn_vul.vulnerability_admin or sn_vul.admin (deprecated), or admin. For who owns each step, see the roles, responsibilities and RACI guide.

Open the Setup Assistant and start a solution integration

Every solution integration starts from the same screen. Work through these steps:

  1. Navigate to All > Vulnerability Response > Administration > Setup Assistant > Integration Configuration.
  2. Click Solution Integrations.
  3. Under the Installed Solutions section, decide how to fetch the data: by URL, by API, or by import.

For a URL or API source, click Add Integration. For a CVRF or CSAF file saved on your computer, click Import File.

Choose the import method that matches the vendor feed

A file import loads one document once. A URL or API import fetches data on a schedule, which keeps the provider data current.

Import a CVRF or CSAF file

A file import is a one-time activity. For CVRF, upload one XML file at a time, with a maximum size of 1 GB. For CSAF, upload one JSON file at a time, with a maximum size of 15 MB. Enter a unique name in the Name field, enter the vendor name in the Vendor field, and click Finish. The scheduler is created under the name you entered.

The import creates a queue entry with the file attached. Use the link in the info bar to open the queue entries for the vendor, along with the related list and the job status.

Fetch CVRF data from a URL

Click Add Integration, set Import type to URL, and fill in Name, Vendor, and URL. Set Schedule, Day, and Time to control how often the update runs. On each run, the data is fetched from the URL, parsed, and stored in the sn_vul_solution table with the vendor name as the source.

Fetch CSAF data from a vendor or an aggregator

The CSAF URL form adds two choices. Select Single vendor to import from one vendor, then enter that vendor in the Vendor field. Select Multi Vendor to import from several vendors, and use the Aggregator field to name the trusted provider whose solutions you want.

The URL can point to a direct CSAF payload, which contains the advisory details, or to a Resource-Oriented Lightweight Information Exchange (ROLIE) Feed URL. Solutions that come through aggregators and trusted providers using ROLIE are mapped to the correct vendor and vulnerable items based on Common Vulnerabilities and Exposures (CVE) identifiers.

Import advisories through the API

Advisory imports set Import type to API. The Connection alias field selects an authenticated credential, and the sys_alias table stores that credential along with the base URL for the advisories. When the scheduler runs, a flow reads the advisories, extracts the CVRF or CSAF URL and advisory ID from each payload, and makes a REST API call for each URL. The parsed data is stored in the sn_vul_solution table.

Four fields shape how the flow reads the payload. Flow identifies the flow the scheduler triggers. Flow action holds the sliding window behavior. Mapping Table points to an Enrichment Data Mapping Table record used to extract the URL and advisory ID. Advisories from response names the tag in the payload that holds the list of advisories. If the existing flow does not fit your feed, copy it and edit the copy, for example to change pagination. The flow shipped with the application covers Cisco for CVRF and Red Hat for CSAF. For any other API vendor, customize the flow and flow action to extract a unique key and the CVRF or CSAF URL from the advisory response, because publishing that URL is not standard across vendors.

Understand how imported records are processed

The queue entry is parsed when the queue processes it, and the application log is updated once that processing completes. Before parsing, the application creates a scanner-mapping record based on your configuration, and the scanner-mapping data is then transformed into vendor-mapping data.

Parsing populates these tables in the Vulnerability Response application: sn_vul_solution, sn_vul_m2m_vulnerability_solution, sn_vul_nvd_entry, sn_vul_software, and sn_vul_product_category.

Set scanner mappings and read the preferred solution

Scanner mappings are optional for CSAF imports. They do not apply to NVD-based vulnerabilities, meaning vulnerabilities with a CVE in the National Vulnerability Database. For third-party vulnerabilities, the preferred solution is populated only when you add the corresponding scanner mapping. Each mapping takes a Scanner source, which selects the source of the third-party entry (TPE), a Vulnerability column to search, and a Keywords value for that column.

The preferred solution rule is the same for CSAF file, CSAF URL, and CSAF advisory imports. If an NVD entry has one highest superseding solution, and that solution rolls down to the vulnerable items, the preferred solution is populated. If one NVD entry contains several vendor solutions, the preferred solution is not populated, because more than one highest superseding solution exists. In that case, select the solution manually.

Set the update schedule for URL and API imports

URL and API integrations use three fields to set the update schedule. Schedule sets the frequency, Day sets the day of the week, and Time sets the time the data updates.

Advisory imports use a sliding window after the first run. The Time range parameters option under Filter Criteria controls the request time range. The Start Date and End Date request parameter names vary by API, for example StartDate, start_date, endDate, or end_date, so match the name your API expects. The date format must be one that GlideDate supports, such as mm/dd/yyyy, because unsupported formats do not work.

Verify the import and work through common failures

Verify each new integration in three places. Open the queue entries from the info bar link and check the job status. Then open the application logs, which hold the detailed information about errors and exceptions. Finally, confirm that solution records for the vendor appear in the sn_vul_solution table with the vendor name in the Source field.

  • CVRF file: confirm the upload is one XML file no larger than 1 GB before you retry.
  • CSAF file: confirm the upload is one JSON file no larger than 15 MB before you retry.
  • Advisory API: confirm the Connection alias points to an authenticated credential and that the Advisories from response value matches the tag in the payload.
  • NVD entry with several vendor solutions: expect no preferred solution and select one manually.
  • Date filtering: confirm the date format is one GlideDate supports.
  • Error ‘Scanner mapping to vendor-mapping data transformation is in progress’: wait for the transformation to finish, then run the integration again. A file import that creates no queue entry means the same transformation is still running.

For configuration mistakes to check before you run anything, read the guide to common Vulnerability Response mistakes. For help planning this work, see ServiceNow implementation.

Confirm the release before you configure

The steps for configuring providers read the same way in the Yokohama, Zurich, Australia, and Brazil releases. The details in this page reflect the Brazil release, updated September 10, 2026. The Australia release was updated March 12, 2026, the Zurich release July 31, 2025, and the Yokohama release January 30, 2025. Compare field names and menu labels with your instance before you build a runbook from them, because the release your instance runs decides which version applies.

Questions about provider imports and feed updates

Should I use a file import or a URL import for a vendor?

Use a file import when you have one document and do not expect it to change. Use a URL or API import when the vendor publishes a feed that updates, because only URL and API integrations have Schedule, Day, and Time fields to refresh the data.

Why does a URL integration switch to On Demand after the status shows FINAL?

When the status tag of the CVRF or CSAF document shows FINAL, the Schedule field is set to On Demand automatically. That stops the integration from running on a timetable and prevents unnecessary runs. If the vendor changes the document after it is marked final, select Execute Now on the configuration page to run the integration when you need the update.

Does Oracle need a different setup?

Oracle publishes its CVRF URL directly, so the setup for Oracle data uses that URL. Use the same CVRF URL steps, entering the Oracle URL in the URL field.

What does the initial range in days control for an advisory import?

Initial range in days sets how many days of data the scheduler fetches the first time it runs. Later runs follow the sliding window. If you do not want a time range at all, select No Parameters instead.