To import an old project status report, open its project in Project Workspace, select Status Reports, and use Create status report to choose Import existing status report. Select Import to move the old report into the new reporting tool. The import choice appears when old reports are linked to that project.
Prepare to import an old project status report
Start with the project whose reporting history you need to carry forward. The migration route brings reports from classic Project Workspace into the new Project Workspace. Keep the project context clear: finding a report somewhere in the instance does not establish that it is linked to the project you have opened.
For the import action, the listed roles are it_pps_admin and it_project_manager. Check access for the person doing the migration before scheduling a reporting handover. Someone who receives the final report may have a different responsibility from the person importing it. Avoid using a stakeholder’s ability to read a report as proof that they can perform the import.
These steps reflect Brazil behavior; check the labels and settings on your instance and release before proceeding. For background on the interface, see Project Workspace explained. Establish which workspace your team is using before comparing navigation paths or reporting screens. Import is a separate step under Create a status report in Project Workspace, within Project Portfolio Management, so look for it there if your labels differ.
As a preparation check, record the project and the old reports you expect to bring across. Choose a report that the project manager can recognize and review. This gives the migration a concrete acceptance target: the reviewer should be able to identify the expected reporting content after import, rather than merely confirm that a page opens.
Move the report through the project reporting screen
- Open the relevant project from the Project Workspace home page.
- Select Status Reports from the project’s list to open its reporting page.
- In the Pages section, select Create status report and choose Import existing status report.
- Select Import to bring the old status report into the new reporting tool.
- Review the resulting report in the context of the same project before treating the handover as complete.
The classic workspace also provides export routes into Next Experience. At project level, the link is Export status reports to Next Experience. At individual record level, it is Export to Next Experience. Distinguish these locations when asking someone to prepare an old report: one instruction concerns the project, while the other concerns a particular report record.
Keep the first migration small enough to inspect closely. A sensible acceptance exercise is to identify one expected old report, perform the import, and ask the reporting owner to review its meaning.
If a broader migration program is running alongside this work, keep its checklist separate from the report action. The data migration and import sets overview can help frame those wider decisions.
Resolve a missing import choice before creating replacement reports
Create status report and the option for starting from a template are visible by default. Import existing status report has an additional condition: old status reports must be linked to the project. When the import choice is absent, first establish whether the selected project actually has the old reports you intend to migrate.
Check the project identity with the reporting owner. Similar project names can make a navigation mistake look like missing history. Then review the expected report in the classic workspace and identify whether the project-level or record-level export location applies. Keep a note of what you found so that the next person does not repeat the same search.
Do not treat a newly created report as evidence that an old report was imported. The two actions answer different needs: one starts a reporting document, while the other carries existing reporting material into the newer experience. Agree which outcome the project needs before substituting one action for another.
If access needs investigation, give the administrator the project, the action attempted, and the missing label. That is more actionable than reporting that the workspace is broken. For broader preparation errors, review common data migration and import sets mistakes when organizing the surrounding migration work.
Check the reporting meaning after import
To inspect a report, open the project, select Status Reports, and select the report name in Pages. The roles listed for analyzing a report are it_pps_admin and it_project_manager. Review with a person who knows the project’s reporting history, especially where narrative comments explain a change in health or a missed milestone.
The Default status report template provides sections covering Overview, Key Milestones, Cost (Planned vs Actual), Resources (Allocated vs Actual), Schedule, Risks, Issues, and Dependencies. The One-page status report template has fewer information headers. Use the report’s actual layout when planning the review; a shorter layout is not itself evidence of an import failure.
Check the summary against the supporting detail. For example, compare the reported project health with the schedule narrative and outstanding issues. Where the layout includes milestones, inspect planned and actual dates. Where it includes risks, examine probability, impact, and mitigation information. These are review questions, not claims that import changes or repairs the underlying project records.
Two reports can also be compared to analyze progress. Keep the review question specific: whether a reporting period’s information is understandable, whether an issue has a clear owner, or whether a milestone variance needs explanation. Record discrepancies before making follow-up changes so the reporting owner can distinguish migration review from normal project updates.
Understand live content before reusing the migrated material
Dynamic content changes when its underlying record changes. That matters when someone expects a report to preserve a historical position. During acceptance, distinguish manually written commentary from fields that draw on project data. Ask what the reader needs to understand about the reporting date before reusing material for the next update.
For adding dynamic content, the listed roles are it_pps_admin and it_project_manager. In the editing flow, the Doc tab accepts a forward slash to expose actions such as Mention a user, Mention a record, and Insert a dynamic content. A record mention becomes a link to that record; inserting dynamic content serves a different purpose by displaying configured project data.
Creating a document template within Project Workspace requires it_project_manager. In Doc Templates, select New, complete Create New Document Template, and select Save. Choosing Project status report in Category enables dynamic content by default. For Project Docs, the Is Dynamic check box controls that behavior. Platform-level template creation is governed by ACLs, so workspace visibility and platform access need separate consideration.
Settle the import question first: confirm the intended old report is available and understandable. Only then decide whether future reporting needs a different layout or live fields.
Questions about using the report after the transition
Why can I open a status report but not edit it?
The sn_pw.status_report_doc_read_only system property defaults to true. Editing requires the sn_pw.status_report_doc_read_only system property to be set to false, or the Allow edit status report field set to true on the report’s Details page. Treat a proposed change as a reporting governance decision: establish who should edit reports and how historical commentary will be reviewed before changing the setting.
Does duplicating a report preserve its historical dynamic values?
Duplication retains static or manually added information, while dynamic data refreshes to the current date and latest project information. The duplicated report appears alongside the original. The role required for duplication is it_project_manager, using Duplicate status report under More actions.
Can I keep a PDF copy for a reporting handover?
A status report provides Export as PDF under More actions for sharing and archiving. Decide which reviewed version belongs in the handover and give it clear context in your team’s records. An exported copy can support the review without becoming the editable working report.
Which role is required to download reports as PowerPoint?
Downloading a status report as PowerPoint requires the sn_ppt_export.ppt_user role on the general download route. The Project Workspace export route lists the it_project_manager role instead, and it needs the Export to PowerPoint for Strategic Portfolio Management application installed and a PowerPoint template uploaded first. Check which route your instance uses before assigning access. The PowerPoint download uses the project number and status report date in the filename, helping the recipient identify the project and reporting period.
Do Draft and Published labels restrict who can see a report?
These report statuses track the project team’s reporting process. They do not send, share, or restrict a status report. If your handover includes an approval or distribution step, assign that responsibility explicitly instead of relying on a visibility label to perform it.
For help planning or carrying out this work on your instance, see our ServiceNow implementation services.