OBLYTECH Logo
OBLYTECH Logo

Discovery Admin Workspace in ServiceNow: Configuration Guide

The Discovery Admin Workspace is the ServiceNow interface for configuring discovery. You open it from the Workspaces menu. It gathers the work into a Home page for errors and onboarding, a Settings page for anomaly detection, IPAM, notifications and URL Discovery, and a Schedules page for IP-based and cloud runs. This guide covers what each area controls.

Opening the workspace and reading the Home page

Open the Workspaces menu and select Discovery Admin Workspace. The Home page is where an administrator checks whether discovery is healthy. It contains an onboarding area that changes with your configuration progress, a quick overview showing active schedules, schedules with anomalies and the Discovery Operations Monitor, and a list of the top discovery errors. Lower on the page sit tuning advice, a Quick Discovery entry point, the ITOM Visibility applications and a Learnings area.

Several parts of the Home page depend on versions. The Home page capabilities described on the page begin with Discovery Admin Workspace version 1.17.0. The Learnings resources need the ITOM Content Service plugin at version 1.2.8, and the ITOM Configuration Console needs Zurich Patch 8 or later.

The Error 153 video player configuration message on the Videos tab of the Learnings area is addressed by setting com.glide.security.referrerpolicy to origin-when-cross-origin. Setting up the discovery tool itself is covered separately in the Discovery tool setup guide.

Settings: time scale, anomaly detection and sensitivity

The Settings page controls the dashboard time scale, which can be 7, 14 or 30 days across the Home, Schedules and Diagnostics pages. The default is 7 days, and a browser refresh is needed after you save a change.

Anomaly detection flags three kinds of problem. A critical anomaly means a schedule failed to run. A major anomaly means a low configuration item (CI) discovery rate. A minor anomaly means a long run time or a high error count. Anomaly detection is on by default, and turning it off significantly affects the Discovery pages and charts.

Two settings shape how anomalies are judged. The detection method is ML-based by default. The stats-based option uses fixed numerical thresholds and standard deviations instead. Choices include Lowest, Low, High and Highest, and the default is Low. The threshold defaults to 20 percent, and Reset returns it to that value. For common setup and tuning mistakes, see the common Discovery mistakes guide.

IPAM integration and automatic schedules

IPAM integration needs the AI Platform on the Brazil or Australia release, on Zurich starting with Patch 8, or on Yokohama starting with Patch 13. It also needs Service Graph Connector Central version 2.4.0 or later and Service Graph Connector for Infoblox version 1.5.0 or later.

When it is enabled, the integration creates and maintains schedules from IPv6 IPAM data. Schedules created this way are inactive until you activate them manually.

Notifications for critical errors and schedule failures

Discovery notifications send real-time alerts and daily summaries of critical errors and schedule failures through Microsoft Teams and email. They need the AI Platform on the Brazil, Australia or Zurich release, or on Yokohama starting with Patch 6, and the Microsoft Teams Graph spoke must be configured first.

Email recipients can be added with no recipient limit. Use a test notification to validate the integration.

Notifications are off by default. Four categories can be switched on: auto-created IPAM schedules, critical anomalies, MID cluster down and MID server down. Teams and email notifications are both enabled by default. Delivery is Immediately for each category except critical anomalies, which are sent as a Daily summary. For background on MID clusters, see the MID server cluster guide.

URL Discovery settings

URL Discovery controls how the Agent Client Collector for Visibility (ACC-VC) gathers web usage data from managed devices. It needs the AI Platform on the Brazil, Australia or Zurich release, or on Yokohama starting with Patch 6, the Software Asset Management Professional plugin, ITOM URL Discovery 1.1.0 or later, Discovery Admin Workspace 1.14.0 or later, and ACC-VC 1.8.0 or later. The browser extension must be enabled on the host.

There are two collection modes. The broad mode records URLs accessed on Chrome-based browsers across managed devices. It is off by default, requires the ITOM URL Discovery application scope, and keeps its data for up to 30 days. The settings page warns that capturing URLs this way may not meet GDPR and other privacy rules, so company policies should be reviewed before the toggle is switched on. For access design around discovery, see the discovery security and access design guide.

The targeted mode monitors specific URLs or domains while broad discovery is off. Removing a targeted URL keeps its monitoring history for 30 days before it is deleted.

Schedules: IP-based and cloud discovery

The Schedules page is a single place to monitor discovery performance, manage schedules and statuses, and set up IP-based or cloud schedules. Its capabilities are available from workspace version 1.19.0. Quick Discovery and New Discovery can be opened from any tab. Quick Discovery runs an IP-based discovery by selecting an IP range and a MID Server. New Discovery lets you choose between IP-based and cloud-based discovery.

The Cloud discovery tab gives quick access to the cloud-based schedules, and the related cloud tasks cover Alibaba Cloud, AWS, Azure, GCP, IBM, OCI, OpenStack, oVirt and VMware. Each of these providers has its own schedule creation steps. For the cloud side of this workspace, see the Cloud Discovery Workspace guide, and for the schedule concept in general, see how discovery schedules are explained.

Selecting a schedule opens its details, reached through Workspaces, Discovery Admin Workspace, Schedules and Discovery schedules. The schedule details view has three tabs. The Overview tab shows completed discoveries, success rate, errors and trends over time. The Schedule Details tab lets you edit the schedule form directly. The Run History tab lists the status of the last 10 scheduled discoveries, with anomaly icons when detection is on. Discover now runs the schedule, and Quick Ranges creates an IP range to discover. These schedule details capabilities are available from version 1.8.0.

Reading a run: status details and the Debugging tab

Status details are reached through Workspaces, Discovery Admin Workspace, Schedules and then Discovery status, and they are available from version 1.8.0. The header shows start and end times, probes triggered and completed, and anomalies detected. For runs with an Active or Starting status, selecting the Refresh icon updates the Started and Completed values in real time. Anomaly information appears while anomaly detection is enabled in Settings.

The Details tab has visualizations for IP-based, cloud-based and certificate discovery. The IP-based figures are Total Devices, New Devices, Total IPs and Duplicate IPs, with an Errors count alongside. Cloud runs show Total Cloud Resources as a bar chart grouped by CI type. Certificate discovery requires workspace version 1.20.0 and the Brazil, Australia or Zurich release starting with Patch 8, and its table lists the collected certificates. Each visualization can be refreshed or exported as CSV or Excel.

Errors are sorted by priority by default. Each error card shows the error title, severity, refined code, occurrence count and error category. Selecting a card or its Occurrences link opens the Error Details page, which shows the root cause, remediation steps and individual error instances.

The Debugging tab holds two logs. The Discovery Log records classification failures and CMDB updates, with one record created per action. The ECC Queue shows connected probe and sensor activity. For fault finding beyond these two logs, see the Discovery troubleshooting guide.

Version history of the workspace

Capabilities on this page are tied to these workspace versions: 1.8.0 for schedule details and status details, 1.14.0 for URL Discovery, 1.17.0 for the Home page, 1.19.0 for the Settings and Schedules pages, and 1.20.0 for certificate discovery.

Frequently asked questions

Where do I find the Discovery Admin Workspace?

Open the Workspaces menu and select Discovery Admin Workspace. The Home, Settings and Schedules pages sit beneath it.

What do the anomaly severities mean?

A critical anomaly means a schedule failed to run. A major anomaly means a low CI discovery rate. A minor anomaly covers a long run time or a high error count.

Why do I not see anomaly details on a run?

Anomaly information appears on status pages while anomaly detection is enabled in Settings. Anomaly detection is on by default.

Do schedules created from IPAM data start running on their own?

No. Schedules created from IPv6 IPAM data are inactive until someone activates them manually.

How long is URL Discovery data kept?

Broad URL data is kept for up to 30 days. When a targeted URL is removed, its history is kept for 30 days before it is deleted.

Which version added certificate discovery?

Certificate discovery management arrived in version 1.20.0. Certificate discovery results on the status details page require workspace version 1.20.0 together with the Brazil, Australia or Zurich release starting with Patch 8.