A ServiceNow dashboard layout decides where each widget, filter and visual sits, how much space it takes, and which tab holds it. Classic responsive dashboards use a drag-and-drop canvas with quick layouts. Platform Analytics dashboards use a grid, split content into tabs, and scope each filter to the whole dashboard or to one tab. The steps below cover both models.
Two dashboard models and what each one holds
Check the model first, because the controls and the allowed content differ. Core UI responsive dashboards hold Performance Analytics widgets and reports. In the Australia release, Core UI reporting functionality is in maintenance mode, is no longer being augmented or changed, and receives security fixes. Owners can migrate these dashboards to the Platform Analytics experience through the Platform Analytics Migration Center.
Platform Analytics dashboards hold data visualizations, filters, headings, images, lists and rich text. Reports and Performance Analytics widgets cannot be placed on them, so a report that must appear there needs rebuilding as a data visualization. For the general dashboard explainer, see how ServiceNow dashboards work overall.
Arranging widgets on a Core UI responsive dashboard
Open the dashboard from All, then Self-Service, then Dashboards, or from All, then Performance Analytics, then Dashboards. Select it from the dashboard picker, then click the plus sign to enter edit mode.
Moving, resizing and snapping widgets
Drag a widget to move it. To enlarge one, point at its header and click the resize icon. To shrink it, hold Shift while you click that icon. For a faster start, open the Configuration pane and click a quick layout. The widgets snap to that arrangement, and you can adjust each one afterward.
Headers, titles and colors
Click the gear icon on a widget to open its Edit Widget window. Select or clear the boxes that show or hide the border, header and title, and choose left, center or right alignment for the title. Hiding the header also removes its icons, including the icon that marks an interactive filter, so keep the header visible on any widget that viewers filter.
A widget title cannot be renamed from the dashboard. The title comes from the underlying visualization, so change it there. Title and header colors use the color picker beside each field. Enter a hexadecimal code, or delete it to return to the default. A dark header color turns the header icons white and a light one turns them black, so check contrast after you choose.
Background, content blocks and removing widgets
In the Configuration pane, select Use custom background color, then open the color picker. The sliders include grayscale, RGB, CMYK and HSB, and RGB accepts hexadecimal codes. The background applies to all tabs. Clear the checkbox to restore the default.
To divide a long dashboard into sections, add a content block from the Add Widgets list by selecting Content Blocks. Responsive dashboards do not support the Sticky Notes widget. To remove a widget, enter edit mode, point at its top and click the X icon. No confirmation appears, and the widget disappears at once.
Filtering and widget access
A report widget follows the dashboard’s interactive filters when you select Follow interactive filter in its Edit Widget window. Performance Analytics widgets cannot follow interactive filters. They are filtered through breakdowns, which users with the pa_admin or pa_power_user role can add. The pencil icon on a widget header appears when your roles give you access to the widget’s source. Edit rights on a dashboard do not necessarily give you edit rights to the widgets on it. For the indicator a Performance Analytics widget draws on, see the Performance Analytics indicator explainer, and for how breakdowns are set up, see the indicators and breakdowns guide.
Tabs on Core UI and Platform Analytics dashboards
Core UI tabs
Open the Configuration pane and click Create Tab. New tabs take default names built from the dashboard name, followed by New Tab and New Tab 2. Rename a tab by clicking it, pointing at its name, clicking the pencil icon and typing the new name.
You cannot link an existing tab into a dashboard, but one tab can appear on several dashboards. Deleting a tab removes it from all dashboards where it appeared, so check the others first. To reorder tabs, drag them in edit mode, or enter numbers in the Order column of the Dashboard Tabs related list. Lower numbers appear further left.
Platform Analytics tabs
Select Add a tab to create a tab named Untitled, then rename it with the pencil icon. Adding the first tab creates a new area between the dashboard title and the tab row. Elements placed in that area stay visible whichever tab is open, which suits a date range or region filter that should shape each view.
Reorder tabs by dragging, or from the keyboard: press Tab to focus a tab, use the arrow keys to select it, press Shift with an arrow key to move it, and then select Save. Duplicate a tab from its More actions menu, which also offers Delete. Deleting a tab asks for no confirmation.
Element sizes and placement on the Platform Analytics grid
Each element receives a default footprint when you place it on the stage. Drag an element’s handlebar to resize it, or drag the element itself to move it.
| Element | Default size on placement |
|---|---|
| Filter | 6 columns by 3 rows |
| List, Multipivot and Indicator Scorecard visualizations | 48 columns by 18 rows |
| All other components | 11 columns by 11 rows |
Filters start compact, so several can sit side by side. A list, multipivot or indicator scorecard starts much larger, so reserve room for it before you place filters next to it.
Elements you can place
The element types covered here are these.
| Element | What it holds |
|---|---|
| Data visualization | Current or imported instance data, from the dashboard designer or the library |
| Filter and filter group | Criteria applied to visualizations; a filter group applies several filters together |
| Heading | Text at the top of a dashboard or section, with six heading levels |
| Rich text | Formatted text or HTML, edited through the code tag icon in the Configuration panel |
| List | Table records that support Platform Analytics filters and drilling down by default |
| Image | Static or animated images |
Grouping elements and edit locks
Select Edit to enter edit mode, move and resize elements, then select Exit editing mode. Grouping lets several elements move together and share one border and background. The grouping property must be enabled for the dashboard list. Then select the grouping icon in an element’s header menu, check the other elements, select Confirm Group and save.
Only one person at a time can hold a Platform Analytics dashboard in edit mode. A viewer of a locked dashboard sees no Edit button, and sees the locking user’s initials beside the refresh and details icons. The More actions menu includes an option to clear the lock. Use it with caution. Mistakes that come up when layouts are built this way are listed in the common reporting and dashboard mistakes guide.
Filters and the scope they cover
To add a filter, select Add new element, then Filter, then New filter or Saved filter. The filter types are single select (the default), multiple select, date and true/false. Date filters apply automatically to indicator data on the page or tab.
Placement sets the scope. A filter inside a tab affects the visualizations on that tab. A filter above the tabs, or on a dashboard with no tabs, affects all visualizations on the dashboard. Put a date range or region above the tabs, and a filter that answers a question for one tab inside that tab.
Filter values persist across sessions on dashboards built in the inline editor, so a viewer who reopens the dashboard sees their last selections preselected. Technical dashboards do not keep these values.
Editing a saved filter
A saved filter comes from the filter library and can be reused on other dashboards. Unlink from library gives one dashboard its own copy and leaves the library version unchanged. Deleting a saved filter from a dashboard removes it there, while it stays in the library and on other dashboards. When you save a change to a saved filter, choose whether it applies to the current dashboard as a new version, or to the library, where it reaches all dashboards that use the filter.
Roles and tab refresh settings
On Platform Analytics dashboards, any role can create a dashboard and share it. Editing rights come from sharing rather than from role, so the owner or a user granted editing rights can change the layout. The dashboard_admin role can edit, share or delete any dashboard. Technical dashboards also need the ui_builder_admin role to edit. The wider access model is covered in the reporting and dashboards security and access design guide. Viewing rights are enough to export, print a copy of or bookmark a dashboard, and to duplicate one, unless it is a technical dashboard, which cannot be duplicated.
On Core UI dashboards, the required role is User, and dashboard_admin covers all dashboards.
Tab content is cached between tab switches, so it does not refresh each time someone moves between tabs. The default cache period is 20 minutes. Administrators can change it through the next_experience.dashboard.tab.timeout system property.
Frequently asked questions
Can I place a classic report on a Platform Analytics dashboard?
No. Reports and Performance Analytics widgets cannot be placed on a Platform Analytics dashboard. Build a data visualization that answers the same question and place that instead.
Which filters affect all tabs?
A filter placed above the tabs, or on a dashboard that has no tabs, affects all visualizations on the dashboard. A filter placed inside one tab affects that tab alone.
Why does a dashboard show no Edit button?
Either you lack the right to edit it, or another user holds the edit lock. A locked dashboard shows the locking user’s initials beside the refresh and details icons.
How long does a tab keep its content before refreshing?
The default is 20 minutes. An administrator can change the period through the tab cache timeout property.