Process Mining is the ServiceNow application that helps analysts and process owners analyze and optimize their business processes. It builds process flows from table records, maps the routes those records take, and highlights steps where work runs long or repeats. Teams use the map to find improvement opportunities and track the changes they make.
How a Process Mining project is built from table records
A project starts from a parent table, the table that holds the records you want to analyze. In the Project Builder you set the objectives, define the scope of the analysis, add improvement opportunities from a list of rules or your own, and then mine the project. Audit Log must be enabled on the parent table before a project can be mined. Once the project is mined and opened, the Analyst workbench opens by default. The overview panel reports the total records in scope, the number of routes they represent, the average days records took to close, the standard deviation of route duration and the median duration.
Processes that span more than one table can be mined together. Multi-dimensional mining brings a parent table and its related child tables into one view, which helps you understand why SLAs are breached. In the Brazil release, you can also create a project directly from a list of records on any workspace, moving straight from those records into the process behind them.
Projects can be shared as Can view or Can edit. A user with edit rights can change the project definition and run full or sample mines, but cannot share the project.
What the Analyst workbench shows and how to drill into it
The process map displays routes using the primary and secondary metrics you select. Selecting a node opens a window with its incoming and outgoing distribution and repetitions. Selecting a transition opens its occurrences, repetitions and duration. You can apply a bar from one of those histograms as a filter, which narrows the project to the records behind it.
The Investigate drop-down in those windows offers relevant records, work notes analysis, cluster analysis, root cause analysis and transition filters. Each runs as a scheduled background task, so you can carry on working and open the result once it completes.
The Breakdowns tab creates and deletes filter sets and sets advanced conditions. The Process steps button defines advanced filters on transitions, and in multi-dimensional projects those filters apply to parent and child tables. Selecting columns also shows touchpoint and idle case counts.
The Variants tab lists each route with its number of cases, average duration and number of steps. Selecting a route highlights it on the map. Show Records lists the records behind chosen routes, and Model Statistics sets the filtered records or a selected route beside the overall model, showing records, routes, average duration, standard deviation and median duration.
Reading the summary, the opportunity list and their states
The Summary and insights page opens with a process overview. Its two graphs show the average time records take to complete over time, and how records are spread by the time they take to reach the end of the process.
Below that sits the improvement opportunities list, which holds rule-based and automated opportunities. Each carries one of three states. New means no work has been done on it. Under review means action has been taken, either by you or by setting the state by hand after work happened outside the platform. Archived means the item is no longer relevant, and it can be moved back to New.
Adding a note, a continual improvement management (CIM) item or an automation request to a New opportunity moves it to Under review automatically. From an opportunity you can also edit its definition or start root cause analysis.
The variation analysis on the same page compares variants of a mined project. You filter and sort the routes, then select View process analysis to open that variant’s graph in the Analyst workbench.
Opportunity details and the inefficiency patterns they highlight
The Opportunity details page opens from the Improvement Opportunities icon on a project’s side panel. Metrics for the finding sit at the top, and the process graph highlights the pattern in red. The highlighted pattern depends on the kind of inefficiency found:
| Pattern | What the graph highlights |
|---|---|
| Ping-pong | The nodes involved and the arcs between them, where a path moves back and forth |
| Rework | The designated node, and nothing else |
| Extreme duration | The nodes and transition where a step takes much longer than usual |
| Extreme repetition | The nodes at either end of the repeating transition, and the arcs between them |
| Extra step | A node in a variant, with its incoming and outgoing arcs |
| Slow transition | The two nodes either side of the team handover, and the arcs between them |
| Repeating pattern | The nodes and arcs forming a sequence that recurs in the path |
Analyze in analyst workbench opens the workbench in the context of that opportunity. The Take action menu sets its status, adds a note, creates a CIM item or raises an automation request.
Generating highlights, which explain the main reasons for inefficiency, needs the Process Inefficiency Highlights skill activated on the instance. Without it, that option does not appear.
Cluster analysis and what it needs
Cluster analysis groups similar records without a label you define. It is an unsupervised machine learning method, so the groups come from the data. You can run it on an activity, a connection between activities, a route or an improvement opportunity. The view shows keyword descriptions and assignment groups for the top three clusters of an activity, a connection between activities, or a route, so you can identify patterns among the records in a suspected bottleneck.
It needs a record count between 100 and 300,000, and the process must be configured first. If the configuration changes, a follow-up cluster analysis can be scheduled.
Setting up Process Mining in the current release
In the Brazil release, Process Mining is available by default. Sample mining works without a license, and full mining needs one. Content packs follow two routes. Some need manual activation from the application list. Each of those packs contains prebuilt templates and process configurations for a specific area, with process model definitions, process finding definitions and improvement insights. Others install automatically. In Brazil, the packs for IT Service Management, Customer Service Management, HR Service Delivery, Strategic Portfolio Management, Security Incident Response and Field Service Management are accessed automatically when the matching application plugin is active and its table is present.
Placing a Process Mining map on a PAR dashboard requires the sn_process_mining_power_user or sn_process_mining_admin role. In that task you choose the project, set the graph’s outline orientation, and decide whether the map follows the dashboard’s filters.
Retention, cleanup and default analysis settings
The Process Mining properties page sits at Process Mining > System > Properties. These defaults control how long work is kept and how analysis behaves:
| Property | Default | What it controls |
|---|---|---|
| promin.persist.pa_model | 30 days | Days a project definition is kept after its last update |
| promin.auto_retire_days | 90 days | Days of inactivity before a project is retired |
| promin.auto_clean_days | 90 days | Days after retirement before cleanup; the project configuration is kept |
| promin.rca.result-count | 20 | Leading influencers needed for root cause analysis to be enabled |
| promin.rca.min_condition_and_effect | 10 | Minimum percentage of records shown in the leading influencers list |
| promin.rca.min_odds_ratio | 1 | Minimum odds ratio used in root cause analysis |
| promin.primary_metric | Unique Occurrences | Primary metric shown in the Analyst workbench |
| promin.secondary_metric | Avg Duration | Secondary metric shown in the Analyst workbench |
A scheduled job named ProminVersionCleanup, found in the Process Mining background jobs list, removes obsolete cached statistics when projects regenerate and clears records created by cluster analyses. It runs daily when active.
How the product has changed across releases
Xanadu added an evaluation version on the Incident table, offering sample mining and limited features without an entitlement. It also added a perspectives filter on the process graph, a finding builder and variation analysis on the Summary and Insights page.
Yokohama added the process configuration builder, a content pack importer for process configurations, work notes analysis enhanced with Now Assist, and evaluation projects for HR and Customer Service Management. Its performance work applied a transition filter before mining.
Australia added parallel processing for playbook data, the process step filter (previously the transition filter), Intent and Activity analysis, and a template for mining Agentic AI logs.
Brazil added meter-based usage guardrails, which validate, cap or flag projects before mining starts, along with multiple templates per table, quick starters for transition filters, and the Can view and Can edit sharing rights. In the same release, Now Assist for Process Mining was renamed ServiceNow Otto for Process Mining.
Which IT and HR service problems can Native Process Mining investigate, and what must a buyer check before acting on what it shows?
Native Process Mining can investigate reassignment loops, rework, slow handoffs, SLA-breach routes, approval delays, intake-channel differences and automation candidates in IT and HR cases. Before acting, a buyer should confirm the history is representative, validate the findings with process owners, and separate elapsed time from effort or fault.
IT service problems a transition trail can answer
For IT work, these questions usually produce a usable finding:
- Reassignment loops: which incidents move between the same two groups more than once, and what happens on the return trip?
- Rework: which cases go back to an earlier state or get categorized again, and in which categories does that cluster?
- Slow handoffs: which assignment transitions account for a disproportionate share of elapsed time?
- SLA breaches: which routes appear more often in breached cases than in comparable cases that stayed inside target?
- Intake differences: do requests that arrive through different intake channels take different paths to resolution?
HR service problems that depend on linked tasks
Some of an HR case’s elapsed time can sit in linked work outside the case itself. As of March 2026, the HR scope covers HR cases and, when Lifecycle Events is installed, those events too, so a linked view can ask:
- Which recategorizations or handoffs delay an HR case before its resolution work starts?
- Which approval steps add delay, and how often do they reject the request outright?
- Which linked tasks hold up a lifecycle event, and who owns them?
What to check before acting on a finding
A route on a map describes recorded history, not a diagnosis. Before committing budget or changing a workflow, work through these checks with the people who run the work:
- Fix the unit of analysis as an incident, a request, an HR case or a linked lifecycle.
- Confirm the retained history covers the transitions under investigation and the full window in question.
- As of November 2026, there is no fixed minimum case count, so judge coverage by the question.
- Compare flagged cases with a comparable group that did not show the problem, so a breach route is weighed against cases that stayed inside target.
- Validate apparent bottlenecks with the people doing the work. Elapsed time between recorded events is not automatically hands-on effort, proof of inactivity or proof of causation.
- Agree the outcome measure and comparison group before any change, so before and after figures are read on the same basis.
How to read the figures a finding gives you
A finding locates time and repetition in recorded work, but it cannot price a change. Before accepting any figure, ask for the baseline period, the case count behind each route, and whether the number was measured or modeled. A diagnostic count tells you where to look. It is not evidence of realized savings.
Frequently asked questions
Where does a Process Mining project start?
It starts from a parent table that holds the records to analyze. In the Project Builder you set objectives, define the scope and add improvement opportunities, and Audit Log must be enabled on that table before the project can be mined.
Can I analyze a list of records instead of a process table?
Yes, in the Brazil release. You can create a project from a list of records on any workspace and examine the process behind those records.
Do I need a license to try Process Mining?
Sample mining works without a license, and a license is needed for full mining.
What do the New, Under review and Archived states mean?
New means no work has been done on an improvement opportunity. Under review means action has been taken. Archived means it is no longer relevant, and it can be moved back to New.