A ServiceNow burndown chart is a line chart on the Agile 2.0 dashboards that tracks how much planned work is still open in a sprint or release. The Remaining line is compared with an Ideal Burndown line. Remaining above the ideal line means the team is behind schedule. Remaining below it means the team is ahead.
Where the burndown chart appears on the dashboards
Open the All menu, select Agile Development, then Dashboards, and pick the dashboard you need. The Agile 2.0 Sprint Dashboard and the Agile 2.0 Release Dashboard both carry a burndown, and both require the scrum_user role. The wider Agile Development guides are collected on the ServiceNow Agile Development hub.
The sprint view suits scrum masters and sprint planners, who watch scope changes and the split between completed and remaining work. The release view suits product owners, who track the stories planned for a release.
The Sprint Burndown sits beside a Sprint Burnup and a Sprint Cumulative Flow Diagram, so one screen shows remaining work, completed work and how stories are spread across states. The release view answers a wider question: whether the planned work is likely to be delivered on time, which the Completed Forecast line is there to show. For how dashboards are assembled from widgets in general, see the reporting and dashboards guide.
How the ServiceNow burndown chart is built
The sprint burndown has five series: Scope, Scope Forecast, Ideal Burndown, Remaining and Remaining Forecast. The release burndown has Completed Forecast in place of Remaining Forecast. Each series can be hidden or shown, so a reader can compare Remaining with the ideal pace without the other lines in view. The indicators behind these series are covered in Performance Analytics indicators explained.
| Series | What it shows |
|---|---|
| Scope | The work planned for the sprint or release. Changes to planned work move this line. |
| Scope Forecast | Possible scope change at future dates, projected from historical data. |
| Ideal Burndown | The pace the team needs to hold to finish on time. |
| Remaining | The work left to complete, read against the ideal pace. |
| Remaining Forecast | The burndown projected into future dates, showing whether the sprint can finish on time. |
Story points set the scale of each line. The sprint Scope indicator sums the story points of the stories in the current sprint. The Percent Completed widget divides completed story points by total story points and multiplies by 100. For a release, scope is the sum of story points for active stories in the current releases.
Beside Percent Completed sits the Time Elapsed widget, which shows the share of time between the sprint’s start date and planned end date that has passed. Reading the two together shows whether the work is keeping pace with the calendar.
Reading ahead and behind on the line
The gap between Remaining and Ideal Burndown is the main signal. Remaining above the ideal line means more work is left than the plan estimated. Remaining below it means less work is left than estimated. The same rule applies to the release view and to both prior views.
Scope is a separate line, and the Sprint Burndown reports any scope changes and their trends on it. For how release planning fits around sprints, see release agile explained.
Burnup and the release completion signal
A burnup shows the same work from the opposite direction. The Sprint Burnup plots Scope, Scope Forecast, Completed and Completed Forecast, counting completed work upward toward the planned scope. The burndown shows the gap that remains, and the burnup shows the progress already made.
The Release Burnup adds a useful signal. Where the Completed Forecast meets or crosses the Scope Forecast, the intersection predicts when the release might be completed. If the two forecast lines do not appear to intersect, scope is being added faster than work is being completed.
The sprint Cumulative Flow Diagram tracks how many stories arrive in each of Work in Progress, Ready for Testing, Testing and Complete, how long they stay there, and when they leave. Stories in the Ready and Cancelled states are not included.
Prior sprint and prior release views
Once a cycle closes, its numbers move to the prior dashboards. The Agile 2.0 Prior Sprint Dashboard shows scope, burndown, burnup and forecast trends for previous sprints. Its widgets are Committed Points, Stories Completed, Completed and Missing Estimates. The prior sprint burndown plots Scope, Ideal Burndown and Remaining, and its burnup plots Scope and Completed.
The Agile 2.0 Prior Release Dashboard covers previous releases and is aimed at product owners. Its Release Burnup plots Scope and Completed, and its Release Burndown plots Scope, Ideal Burndown and Remaining, read with the same ahead and behind rule.
Setting up the Agile 2.0 dashboards
The dashboards come from the Performance Analytics Content Pack for Agile 2.0, installed from the ServiceNow Store. An administrator opens System Applications, searches the ServiceNow Store for the content pack, and follows the Store instructions. Some dashboards in the solution are inactive by default and can be activated to make them visible to end users.
The content pack requires an activated subscription to Performance Analytics for Business Management. Full feature access requires a Performance Analytics subscription.
The burndown numbers depend on scheduled data collection. The job to enable is [Scrum] Daily Data Collection, found under Performance Analytics, Data Collector, Jobs. Setting it up involves four steps:
- Start the job and open its Job parameters section.
- Set the Run as field to a user with the pa_admin, pa_data_collector or admin role.
- Set the time zone in the Run as tz field, because the job’s database queries and conditions such as created today use it.
- Select the Active checkbox and save the record.
The job does not collect historical data for its underlying indicators, so the chart’s history begins when the job starts collecting. For background on how scheduled jobs run, see scheduled jobs explained.
Business stakeholders can receive the sn_agile_read role, which gives read-only access to all Agile 2.0 dashboards once the Agile Development 2.0 plugin is active.
Teams upgrading from version 1.0.2 or earlier of the content pack should reinstall the sprint dashboard from the Solution Library. That install upgrades the layout and adds the Sprint Burnup and Sprint Cumulative Flow Diagram visualizations.
Customizing the chart for your own story states
Teams that add states such as review or staging need three configuration steps, because the dashboards read story states through the State field.
- Add the state. Open a story under Agile Development, Stories, right-click State, choose Configure Choices, enter the new state name and a numeric value, select Add, and save. This step needs the admin or pa_admin role.
- Update the indicators. Under Performance Analytics, Indicators, Automated Indicators, open the indicator that feeds the report, change its additional conditions, and select Update. This step needs the admin or pa_admin role.
- Update the UI scripts. Under System UI, UI Scripts, open the script for the affected report. For the Sprint Cumulative Flow Diagram, that script is ScrumAreaChartImpl. Customize it by overriding methods in its empty implementation class, or by overwriting the base implementation. This step needs the admin role.
A new state may need to be reflected in any indicator that reads the State field, so review the burnup and cumulative flow views alongside the burndown. For the story record that carries the State field, see story explained.
What can distort the burndown
Canceled stories are not included in the data on the prior sprint or prior release dashboards.
Stories without estimates are a common source of error. The Missing Estimates widget counts them, and estimates are required for the other indicators, widgets and reports on the dashboard to be meaningful. Because the lines are sums of story points, an unestimated story is missing from them. Read the Missing Estimates count before reading the chart. Entering 1 in the Story Points field makes the indicators and reports count stories instead of points.
The sprint dashboard uses the planned end date of each sprint as its report filter. A completed sprint appears in the chart when its planned end date is on or before the current date, so a sprint closed ahead of that date can be absent from the chart until then.
Frequently asked questions
Where do I find the sprint burndown chart?
Open the All menu, select Agile Development, then Dashboards, and choose the Agile 2.0 Sprint Dashboard. The scrum_user role is required.
What does it mean when Remaining sits above the Ideal Burndown?
More work is still open than the plan estimated for that point in the cycle, so the team is behind schedule.
Why does the chart show a Scope line as well as Remaining work?
The Scope line shows the work planned for the sprint, while Remaining shows the work still left to complete.
How are stories without estimates handled?
The Missing Estimates widget counts them, and the lines are built from story points, so an unestimated story is missing from them. Entering 1 in the Story Points field makes the indicators and reports count stories instead of points.
Are canceled stories counted on the chart?
Canceled stories are not included in the data on the prior sprint or prior release dashboards, and the sprint Cumulative Flow Diagram leaves out stories in the Ready and Cancelled states.
Can the burndown reflect custom story states?
Yes. Add the state to the story, update the indicators that read the State field, and update or override the matching UI script.