OBLYTECH Logo
OBLYTECH Logo

Survey Designer in ServiceNow: Building and Publishing a Survey

The Survey Designer in ServiceNow is the screen where you assemble a survey from categories and typed questions, set its introduction and end note, choose who receives it, and publish. This guide follows the order of work in the Brazil release, covering the data types, scoring, dependencies, access settings and what changes once a survey has gone out.

Where the Survey Designer sits and who can open it

Open the designer from Survey > Survey Designer. In the Brazil release, users with the survey_admin role can build surveys there and publish them to chosen users or groups. Creating questions and publishing also name the admin role. A survey_creator can copy a survey they own.

The header bar switches the canvas between three views. Design, the default, is for categories and questions. Configuration holds the introduction, end note and signature. Availability chooses recipients for each category. The Controls tab holds the data type controls you drag onto the canvas.

Building the survey in order

Build the survey in this order: name it, create categories, add questions, set the details, choose recipients and publish. The name you type in the Name field becomes the survey name and the name of the first category, which the system creates for you. Rename that category, keep it, or add more.

Click the gear icon in a category’s title bar to open the Properties dialog, which holds the category name, a description and a Details field. The Details text introduces the category to recipients. Click the plus icon to add a category below the one you clicked, and the X icon in a header to delete one added by mistake.

A survey needs at least one category, and each question belongs to exactly one. A category produces results when it contains scored questions. Each category has a weight, which defaults to 10, and results are calculated from those weights. To change a weight, add the Weight field to the Survey Category form, then edit the value in the Metric Categories related list on the survey definition.

Copy Survey in the designer’s menu duplicates the questions, configuration, categories, metrics and role-based categories. Assigned users, survey instances and trigger conditions are not copied, so set recipients again on the new survey.

Choosing a data type for each question

The data type you drag onto a category decides the answer format and the kind of data collected. The Brazil release lists fifteen types.

Data type What the recipient sees
Attachment A Manage Attachments icon for adding files
Boolean A check box beside a statement
Choice A list of options to pick from
Date A date
Date/Time A date and a time
Scale Radio buttons on a custom scale
Number A number within a minimum and maximum
Percentage A number within a percentage range
Reference A value picked from a reference table, with auto-completion
String Text in a single line, wide single line or multiline box
Template An answer from a predefined set in a question template
Yes/No Yes or No from a list
Image Scale An image picked from a set of images
Multiple Selection Several check boxes, for select-all-that-apply questions
Ranking A separate order number for each option

A Scale question suits any question where the answer sits on a graded range, such as how closely a change request followed the agreed approval steps, with answer options you define yourself in the metric definitions. A Reference question draws its list from one table, such as User [sys_user]. Reference qualifiers are not supported in the Brazil release.

Attachments cannot be changed or removed after submission. Image Scale questions come with five built-in images running from very dissatisfied to very satisfied, and you can upload JPG, PNG or GIF images for the selected and unselected states. Larger images are reduced to 64 by 64 pixels. An N/A option is not supported, and with no selected image the question shows as a blank box.

Ranking asks recipients to give each option a different order number, or to drag the options into place. A number cannot be used twice. A Ranking question can be mandatory and can depend on a parent question, but not the other way round.

Scale definitions, limits and scoring

Boolean, Choice, Scale, Number, Percentage, Template and Yes/No each need a scale definition. Select High when a higher value, or a Yes answer, is the best result. Choice and Scale take their Min and Max from the metric definitions, so create the answer options first. For Number and Percentage you type the Min and Max yourself. The Number range defaults to 1 to 10 in the Brazil release. For Percentage, 0 and 100 are generally appropriate, and other limits are best stated in the question text. A Template question needs a question template defined first.

Scoring is separate from limits. The assessment engine converts responses to scored question types into a score from 0 through 10. In the Brazil release, Boolean, Choice, Template, Image Scale, Multiple Selection, Scale and Numeric Scale are scored, while Attachment, Date, Date/Time, Number, Percentage, String and Reference are not. Choice values must be numeric, because string values are not saved.

Adding, moving and ordering questions

In Design view, drag a data type into a category container, then click the gear icon in the question’s title bar to open the Properties dialog. Fill in the fields and click the X icon to save and close. The plus icon in a title bar adds another question of the same type to that category, useful for a run of similar questions. Drag a question to reorder it or move it to another category, and use the X icon to delete it.

Order is numeric. Questions created through the survey creator are numbered 101, 102 and so on, while a question created outside it defaults to 100 and so appears first. Reorder categories in the Metric Categories related list, and questions inside a category in the Assessment Metrics related list, then click Update.

Adding conditional questions with the Dependency tab

On the Dependency tab, the controlling question must be a Boolean, Choice, Scale or Template question. Select it in the Displayed when field. The system selects the operator and lists that question’s answers. Tick the answers that should trigger the new question, and each is marked with a check mark.

The dependent question appears directly beneath its controlling question when the condition is met, and does not appear in the survey when it is not. For example, a question asking how many client sites a field engineer has worked on can depend on a Boolean question asking whether the engineer has worked on any client site at all. The designer blocks recursive dependencies, so if Question A depends on Question B, Question B cannot depend on Question A.

Introduction, end note, duration and access settings

The Configuration tab frames the survey for recipients. The Introduction holds a welcome message or background, and the “Do not show survey introduction notes” check box skips it at launch. The End note appears after submission, for example as a thank-you. A Return URL sends recipients to a web page after they submit, and when one is set, the end note is not displayed. The Signature holds the recipient’s acknowledgement of requirements or expectations.

Duration sets how long recipients have to complete the survey. It counts from the moment the survey instance is generated, and the default is 14 days.

Anonymize responses keeps recipients out of the results and clears the Assigned to field on submission, though Created By and Updated By stay visible to users with the survey_admin role. Public Survey lets people respond without logging in, and completed public surveys show Guest in the Assigned to field. That check box appears once you save. The Active check box controls whether the survey is distributed. Survey Owners can be users with the survey_creator, survey_admin or assessment_admin role.

On the Availability tab, Accessible by offers Anyone, meaning anybody with the survey link can respond, or Specific users. With Specific users selected, you can tick Survey groups only and use the Add group users, Add users and Add recipients lists fields to name who can take the survey.

Saving, publishing and editing

Save keeps the survey without changing its state. Preview shows the survey as recipients will see it. Publish distributes it to the selected recipients, and Save and Publish saves it in Draft state and distributes it in one step. Changes must be saved before publishing.

Publishing emails recipients and their managers, and each recipient sees a card linking to the survey in the My Assessments & Surveys portal. The Survey Publish URL appears after publishing, so a draft has no shareable link yet.

To edit a survey, go to All > Survey > Survey Designer, open the menu icon, choose Load Survey, make the changes and select Save or Save and Publish. Added questions reach surveys distributed after the change. Changes to existing questions, such as added choices or a changed data type, take effect straight away for recipients who have not submitted or who are in the retake period. Deleted questions are removed from recipients’ queues. Editing requires that the survey share the application scope of your session.

Frequently asked questions

Can I add a question to a survey that people already received?

Yes. The new question appears in surveys distributed after the change, and surveys already in circulation do not gain it.

Why do I need to save before publishing?

Publishing requires saved changes. Save and Publish performs both steps together, saving the survey in Draft state and then distributing it.

Can a copied survey keep its recipients?

No. A copy keeps the questions, configuration and categories, but assigned users, survey instances and trigger conditions are not copied.

More ServiceNow guides on this topic