The ServiceNow supplier portal is the Supplier Collaboration Portal, the application that gives supplier contacts their own working space. Supplier contacts self-register, then use it to work through tasks, raise requests, upload required documents and keep their profile current. This page explains how access is granted and what each area does.
How a supplier contact gets access
Access begins with self-registration, and no administrator has to take part. From the portal home page, the contact selects Register and completes the account sign up form. First name, last name, email address and supplier name are required, and the privacy policy and terms must be accepted before submitting. A verification email follows. Once the contact verifies the address, a supplier manager approves the request, and a welcome email arrives with a link to set a password.
Two settings sit behind that flow. The external user self-registration configuration must be enabled and mapped to the portal. The supplier name field arrived with the Xanadu December 2024 upgrade and appears once many-to-many mapping between supplier contacts and suppliers is enabled. Check your ServiceNow entitlements for the Supplier Collaboration Portal before installing it.
Colleagues can also join by invitation. Each address is given a role: Contact, which manages assigned files, or Primary, which manages all contacts and files. The invitee then follows an emailed registration link and fills in the required fields (first name, last name, email address and supplier name), plus the relationship contact email field added after the Xanadu December 2024 upgrade. When an invitation is sent, no approval step follows. Since that release, an invitation can reach a person on another email domain if that person sits within the same supplier hierarchy.
The portal works in mobile browsers. Open the instance address on a phone and add the supplier suffix at the end of it.
Setting up the portal before anyone signs in
An administrator installs the Supplier Collaboration Portal application from the ServiceNow Store, under the identifier com.snc.sn_supplier_sp. That install brings in Supplier Common Architecture, Service Portal, E-signature and Employee Center.
Several steps follow. The administrator either configures user criteria for the Service Portal plugin or runs a fix script to grant access. Self-registration for external users is then configured and mapped to the portal. Restricted caller access requests can be approved manually or through the fix script.
What the header and home page offer
The header holds four entry points. The Tasks menu is the one that changes with role.
| Header option | What it opens |
|---|---|
| My Company | The Supplier Profile page. Changes are submitted through the catalog with Request Change. |
| Tasks | The My Tasks and All Tasks submenus. The primary contact sees this menu. |
| My Requests | The requests the signed-in user has raised, with their assignees and status. |
| Raise a request | The supplier catalog, General category. |
A secondary contact sees My Tasks in the header and no other Tasks options. When a contact is linked to several suppliers, My Company lists each one. The home page opens with a search box labeled How can we help?, followed by the My active items, My tasks, My requests, Quick links, My company, My contacts and Most viewed articles widgets. The My company widget shows the employee count, founding year, industry, relationship manager and onboarding date.
Working through tasks
Tasks open from the My Tasks option in the header, from the Tasks tile in My active items, or from the My tasks widget. The My To-dos page lists the tasks assigned to the signed-in user in two tabs, Open and Completed. Selecting a task opens its Details tab, which varies by task type, and its Activity tab. Activity holds a dated record of updates, a Post button for comments, and an add attachments icon for documents and images.
| Task type | What the supplier does |
|---|---|
| Mark Complete | Marks the task complete |
| View Link | Opens the linked resource |
| Play Video | Plays the video |
| E-Signature | Signs documents electronically |
| Catalog Item | Submits a catalog item |
| Survey | Answers the survey |
| Checklist | Completes the checklist |
| Upload Document | Uploads the requested file |
Assigned tasks can also be approved or rejected from the portal. The All Tasks option opens the Supplier Task List page, which shows tasks assigned to the signed-in user and to other contacts at the supplier. A View drop-down switches between open and closed tasks, and a search field finds a specific one. The primary supplier contact and the supplier administrator can open this page.
Raising requests and following them
Raise a request opens the supplier catalog in the General category. The items available are: add or remove a location, enroll a supplier contact, remove a supplier contact, ask a question, submit an idea, submit an issue, update banking details, update profile details, update the default supplier, update tax information, and request something else. Tax change requests go through the update tax information item. Requesting elevated access is a separate catalog item for the privileges of the primary contact role.
Any request a contact raises creates a case automatically. The My Requests page lists the requests the contact has raised, and offers open or closed views with a search field. Each request shows its title, the person who opened it, the assignee and a progress bar with three stages: Open, Work in Progress and Resolved. Its tabs cover case details, an Activity stream for comments to the supplier manager, attachments, and a Task tab. With many-to-many mapping enabled, the list also includes requests for each linked supplier.
Issues that do not fit a predefined case type, or that span several departments, go through a Universal Request. The contact searches from the search bar, opens the Contact us for help section, and selects Request help. For a sensitive or confidential issue, tick the sensitive-information box and choose a department before submitting.
Uploading and managing documents
Documents reach the portal by three routes.
| Route | Where to find it | What the contact does |
|---|---|---|
| Documents tab | Portal header | Uploads, downloads and manages documents and their permissions. |
| My Company documents widget | My Company, then the supplier if several are linked | Uploads a file, downloads the expected template, or uses the three-dot menu to update or download. |
| Upload Document task | My Tasks, Open tab | Opens the task, adds the file in the Attachments section and submits it. |
The Documents tab is the route that does not wait for a supplier manager to start the process. Supplier contacts can also manage document permissions from the Documents tab.
Managing documents requires the sn_slm.contact or sn_slm.admin role.
Roles inside a supplier company
| Role | What it can do in the portal |
|---|---|
| Primary supplier contact | Sees the full Tasks menu and can invite new members. |
| Secondary supplier contact | Sees My Tasks in the header and can request elevated access. |
| Supplier administrator | Can invite new members and open the All Tasks page. |
Managing contacts covers elevating a contact to the primary contact role, restricting that role again, reassigning a task, updating a contact’s email address and removing a contact. An elevated contact can access and manage all the contacts and tasks at the supplier.
Which tiles appear and what they depend on
The My active items tiles are Tasks, Requests, Surveys, Issues, Risk Assessments, Contracts, Supplier Products, Purchase Orders, Shipments and Invoices. The Risk Assessments tile needs the Third-party Risk Management plugin. The Contracts, Supplier Products, Purchase Orders, Shipments and Invoices tiles need the Sourcing and Purchasing Automation plugin (com.snc.sn_pr) and the Source-to-Pay Common Architecture plugin (com.snc.sn_shop). Through risk assessments, a contact can complete the assessments assigned to them, helping the supplier manager evaluate a supplier before onboarding.
Tile data is read from the Activity Configurations table. A custom record added there needs an explicit ACL for sn_slm_contact before it appears. The same rule applies to the To-dos Configurations table, which feeds the My tasks widget. User criteria on the Activity Access list can restrict which records appear, so one contact’s tiles may differ from a colleague’s. Further features, such as smart assessments and Supplier Payment Optimization, need additional plugins activated after installation.
Is the supplier portal included in a Standard source-to-pay order, and what does Professional add for supplier operations?
Yes. As of November 2026, the September 2026 edition table places the supplier portal in both Standard and Professional. Professional adds Supplier Operations, Supplier Relationship and Performance Management and Supplier Payment Optimization, plus broader integration, sourcing and invoice processing applications. Confirm the order form before buying.
What a Standard order covers for supplier work
The Standard set in that table is procurement case management, invoice case management, supplier case management and the supplier portal. Case management is a different scope from transactional workflow automation. The table lists Sourcing and Purchasing Automation under Professional only, so a Standard order should not be sold as full transactional workflow automation.
What Professional adds for supplier operations
Professional adds supplier operations applications on top of the Standard set. The documented additions are:
- Supplier Operations: the application the table names for supplier operations work. The table does not describe its functions, so ask for its scope in writing before promising it to the business.
- Supplier Relationship and Performance Management: the table lists it by name only, so confirm its screens and reporting before scoping.
- Supplier Payment Optimization: the table names it without describing its functions. Confirm on the order form whether it is licensed.
Where the invoice build and the package table differ
The Invoice Case Management listing, dated September 10, 2026, names Source-to-Pay Common Architecture, Source-to-Pay Workspace and the Supplier Collaboration Portal as required products. Invoice Case Management is a Standard application, yet one of its prerequisites, Source-to-Pay Common Architecture, sits under Professional in the table. Store availability or a visible plugin is not proof that every related product is included, so reconcile the package table and the dependency list in writing. Ask for a bill of materials that states whether a Standard invoice build can run without the Professional prerequisite.
Questions to ask before scoping either edition
- Which edition and which application names appear on the signed order form, line by line.
- Whether Source-to-Pay Common Architecture and Sourcing and Purchasing Automation are licensed, and what the invoice build does if they are not.
- Which supplier-facing applications the supplier group expects to use in the first release.
- Whether Supplier Payment Optimization and the relationship and performance application are in the first release or deferred.
- The platform release and Store application versions the bill of materials was checked against.
Frequently asked questions
Can a supplier upload a document without a supplier manager starting the process?
Yes, through the Documents tab in the portal header, where the contact creates the document, attaches the file and saves it. Upload Document tasks appear once they have been assigned to the contact.
Can one contact see more than one supplier company?
Yes, once many-to-many mapping between supplier contacts and suppliers is enabled, a feature the Xanadu December 2024 release supports. My Company then lists each linked supplier.