ServiceNow Telecommunications Network Inventory (TNI) is the application that holds a telecom provider’s record of its physical and logical network and the services provisioned to its customers. It separates reusable inventory models, which hold the manufacturer’s technical data, from inventory records, which describe each installed asset. Discovery and integrations then keep those records aligned with the live network.
How the inventory is organized
The application builds a digital representation of the network. The inventory holds the assets, the services running on them, and the relationships that tie the two together, from physical equipment and racks to the logical paths that run over them.
The Australia release supports multiple TM Forum Open APIs for telecom.
Models and records are separate objects
An inventory model is the reference definition for a kind of asset. It holds the name, model number, dimensions, compatible interface cards and the configurations the manufacturer publishes. An inventory record is one occurrence of that asset, placed at a site or in a data center.
The two connect through the design and assign function. A record created that way carries the standard manufacturer information from its model, so the technical details are not typed again for each unit of the same hardware.
Setup order matters: inventory models come first, because relationships refer to models that already exist. For the wider CMDB picture, see CMDB for Telecommunications.
The six model types
- Facility models describe the physical characteristics and behavior of facility hardware, such as power, cooling and connectivity components in a data center.
- Equipment models hold the vendor’s metadata and the characteristics shared by that equipment’s instances.
- Equipment holder models describe containers: bays, cabinets, cages, line ups, relay racks and slots. A Container Type field records which kind of container the model represents, and slot models are split by slot type, such as route processor, power or fan.
- Interface card models hold the attributes that each instantiated card shares. Network interface models capture the physical characteristics and behavior data that the manufacturer designates for the interface.
- Physical connection, logical connection, cable and strand models capture the metadata for each connection type, cable and strand.
- Network topology models capture the metadata for a topology.
A network topology model asks for a structure: ring, linear bus, mesh, star or tree. In a star, each node connects to a central hub. The form also takes a number of allowed nodes and a type of Generic or Product.
Relationships decide what can connect to what
Model relationships set compatibility and connectivity between models. Each one has a relationship type, a parent product model, a child product model and, where relevant, a count and a sequence.
The types cover the main layers of the network. Rack to Slot links a rack model to the slot models it is compatible with; the form labels it Rack to Rack Slot. Equipment to Slot records how many slots and which slot models an equipment model supports. Equipment to Network Interface records which interface models an equipment model supports and how many of each. Slot to Card and Card to Slot handle card placement, and Interface Card to Network Interface covers the interfaces a card carries. Other types link physical connections to logical connections, connections to network interfaces, racks and cabinets to equipment, logical connections to channels, and cables to strands.
The lists are filtered by model type. For Equipment to Slot, the parent list offers equipment models and the child list offers slot models. For Rack to Slot, the parent is an equipment holder with model category Rack, and the child is an equipment holder with category Slot. The root product model field appears for Slot to Interface Card and names the grandparent, either the equipment model or the card model.
The Count field sets how many child models can be created under a parent when a template is created. It applies to Equipment to Slot, Rack to Slot, Equipment to Network Interface, Interface Card to Slot, Interface Card to Network Interface, Cable to Strand and Logical Connection to Channel. Once a count is entered, a Sequence field appears. Its default is 1, and a second relationship from the same parent starts after the highest value used by the first. Equipment with two slots and two ports therefore receives sequence values of 1 and 3.
Creating company codes for manufacturers and vendors
Company codes are the records that identify each manufacturer, vendor and customer a provider does business with. Telecommunications Network Inventory lets you create one for every such company, and you can categorize those records to sort the network assets they relate to. Creating a code requires the user_admin or admin role.
Open User Administration, choose Companies and click New. Fill in the fields on the form, then click Submit to save the record.
Identification fields on network assets
Asset records share identification fields that say what an asset is, where it sits and who looks after it.
Life Cycle Stage takes values including Purchase, Design, Deploy, Inventory, Operational and End of life, and Life Cycle Stage Status adds In Maintenance, In Use and Pending Retirement. Network domain assigns ownership to the Mobility, Telco or Core equipment domain.
Two codes need care. The CLEI code is a 10-character alphanumeric code that identifies the manufacturer’s product, typically a part number that includes the hardware version. The CLLI code is the North American code for where telecom equipment sits and what it does. Function, Role and Type are user-defined codes. Other fields cover the managing person, the support group, and the network site or data center where the equipment is instantiated.
Cable records add a cable type, a cable number, the number of fibers the cable contains, a length in millimeters, a parent cable marking the top-layer physical connection, a color code, and spare length in millimeters at each end, toward site A and site Z. A KML Route option points to a fiber route map in KML format.
IP address blocks and IP subnetworks each have their own form. A block is defined by its CIDR range. A subnetwork has to sit inside its parent’s range, use a longer prefix than that parent, and must not duplicate a sibling under the same parent.
Keeping the inventory current with Telecom Visibility
Telecom Visibility keeps records matched to the network. It extends the discovery and reconciliation features of ITOM Visibility to telecom providers. It discovers physical and logical components, compares them with what the inventory holds, and maintains a telecom-specific configuration management database and TNI. The mismatches it looks for are missing configuration items, model mismatches and stale inventory entries. The discovery side has a page, Discovery for Telecommunications, and ServiceNow Discovery guides cover the general case. For the reconciliation logic, see Identification and Reconciliation Engine explained.
Discovery arrives from two directions. Direct discovery uses SNMP and CLI against standalone devices such as routers and switches. Indirect discovery pulls data from element management systems, network management systems and controllers through their APIs, using Service Graph Connectors. Prebuilt patterns cover Cisco models including the ASR1K, 7613 and Nexus 9000, and Juniper models including the MX80, MX104, MX240 and MX460. For GPON networks, the Nokia Altiplano integration supports discovery across more than one controller instance.
The telecom discovery set is built from these components: Telecom Discovery Patterns for SNMP and CLI discovery of standalone routers, switches and network functions, Service Graph Connectors for EMS, NMS and controller APIs, and the Telecom Visibility plugin. The Service Graph Connector for Nokia Altiplano reads from that controller through REST APIs. The Telecom Visibility plugin supplies the shared logic and reusable components for discovery and discrepancy reconciliation and remediation. The Telecom Discovery Builder framework is an extract, transform and load component that ships with the Telecommunications Service Operations Management Core application. Once that plugin is active, the framework appears in Integration Hub ETL Studio, ready to copy and adjust for a new connector.
Two monitoring tools support this. The Discovery Admin Workspace shows discovery tasks, lets an administrator validate reconciliation, tune schedules and read diagnostics. CMDB 360 keeps the history of which discovery source proposed each CI attribute value, so administrators can track how the CMDB was populated and revert a source’s updates. For how discovery runs are timed, see Discovery schedule explained.
Using the data model navigator and design and assign
The TNI Data Model Navigator narrows the configuration management database, which holds a large number of CI classes, to the telecom subset. Its six child contexts sit under a parent TNI context: Physical, covering fiber cables, strands, splice closures and cross-connect panels; Logical, covering PON paths, VLAN circuits and MPLS paths; Services, covering service instances that contain logical paths; Site, covering site containers and racks; Facilities, covering power and cooling; and Topology, covering network topology views. The navigator is read through four tabs (Contexts, Tables, Fields and Relationships). Tables describe what a CI class tracks, and Fields mark the attributes that drive planning, such as the strand count on an optical fiber cable table, and Relationships show how classes connect. To open it, an admin activates the Racks Allocation Workflow plugin, searches for Data Model Navigator and picks a tab. For the general meaning of a CI class, see CMDB class explained.
A topology record can be built by hand or created with design and assign. The design and assign path starts in the Network Inventory Workspace. The user opens the list menu, goes to Changes and then All, selects New, chooses Design & Assign topology and selects Next. After the details are saved, a change task appears. The user opens it, completes the Task Attribute tab and submits. The result is a topology configuration item, with its root nodes stored in a separate topology root node table. This path needs the inventory admin and inventory agent roles.
Customizing the validation of a revision CI
Telecommunications Network Inventory lets you customize the validation process that runs against a configuration item. The customization works through adjustable parameters in the script behind the process, so you can specify the criteria and rules that suit your requirements. The aim is a tailored check of data accuracy and integrity.
The role needed is sn_ni_core.inventory_admin. Go to All, then Process Automation, Workflow Studio, Flow Designer and Actions. Select Validate CI Revision, then open the Script Step under the Action Outline section.
In the script, you can set the CI relations, the related items, or both, to false. A value set to false is not included in the validation process.
Frequently asked questions
Which set-up step comes first? The inventory models. Relationships refer to models, so the models must exist before the relationships between them are defined.
Which relationship type links an equipment model to its slots? Equipment to Slot. It states how many slots and which slot models are compatible with the equipment model.
What does the Count field do? It sets how many child models can be created under a parent when a template is created. The Sequence field appears once a count is entered and orders the child entries.
Can discovery reach devices that have no API? Yes. Direct discovery uses SNMP and CLI against standalone devices such as routers and switches, which extends coverage beyond systems that expose an API.