OBLYTECH Logo
OBLYTECH Logo

ServiceNow IPAM: CMDB Records, Infoblox and Discovery Schedules

ServiceNow IPAM data is the set of managed networks, IP subnets and allocated IP addresses that an IP address management system places into the CMDB, typically through the Infoblox connector. Once those records are operational and linked, the IPAM Discovery integration builds Discovery schedules from them, and CMDB Coverage measures how many allocated addresses have a matching configuration item.

Which IPAM Records the CMDB Needs

The CMDB holds IP address management data in three tables: managed networks, IP subnets and allocated IP addresses. Discovery uses a record when its operational status is set to operational, so a record that is not yet operational stays outside the integration’s reach.

Table Record type Requirement for Discovery use
Managed Network [cmdb_ci_managed_network] Managed networks Operational status set to operational
IP Network Subnet [cmdb_ci_ip_network_subnet] IP subnets Operational status set to operational; valid CIDR notation for IPv4
Allocated IP Address [cmdb_ci_allocated_ip_address] Allocated IP addresses Operational status set to operational

IPv4 subnets need valid Classless Inter-Domain Routing notation, because address calculation depends on it. The three record types must also be linked to one another before the integration can work from them.

How the Infoblox Connector Brings Data In

The Service Graph Connector for Infoblox imports subnets and IP addresses from an Infoblox instance into the CMDB. It supports Infoblox API v2.11.2 on the Zurich, Australia and Brazil ServiceNow releases. It also creates IPAM tasks when subnets are added or deleted, and a scheduled import keeps the IPAM configuration items in step with Infoblox.

Setup runs through SGC Central, which opens from the Service Graph Workspace or the CMDB Workspace. The setup stage needs the sgc_admin role or the admin role, and the connector must be version 1.2.0 or later, installed from the ServiceNow Store. Leaving the network view property empty imports from each view on the server. For the broader pattern of feeding external sources into the CMDB, see CMDB integration patterns.

Connector version Release What changed
1.0.0 May 2023 First version. Imports subnets and IP addresses.
1.1.0 August 2023 IPv6 support. CNAME records can import as DNS aliases.
1.2.0 September 2024 Network view property and connection message fixes.
1.3.1 June 2025 Parallel loading; separate import schedules for IP addresses, subnets and networks.
1.4.0 August 2025 Multi-instance support.
1.5.0 March 2026 IPAM table life cycle management, IPv4/IPv6 fields, direct subnet reference.
1.6.0 July 2026 Security fix.

Version 1.5.0 adds an ip_version field to allocated IP addresses, managed IP pools and IP network subnets, so each record can be classed as IPv4 or IPv6. It also adds a subnet reference field on allocated addresses that points directly to the subnet table. That reference replaces the older relationship between subnet and address.

Upgrading to 1.5.0 requires a full data load. Configuration items from version 1.4 and earlier are then marked retired, with operational status 6, rather than deleted. You decide whether to delete those records or keep them.

Writing Back to Infoblox From Workflows

Four Infoblox IPAM activities manage IP addresses through an Infoblox DDI Grid Server, and they apply to the Australia release. In the Workflow Editor they sit under the Custom tab, then Custom Activities, then Infoblox DDI, then IPAM.

  • Register IP Address registers an IP address on a network for a given MAC address.
  • Reserve IP Address reserves the next available address in a specified network.
  • List IP Reservations returns an array of all IP addresses held on the named Infoblox server.
  • Delete IPAM removes an IP record on the named server.

The four activities use the REST web service template, so each must run on a MID Server with REST capabilities. Each takes an api_version input that defaults to 2.0 and is mandatory, and an empty value makes the activity fail. Each exposes Success and Failure conditions, so a flow can branch on the outcome.

How the IPAM Discovery Integration Builds Schedules

On each sync, the integration identifies operational resources in the IPAM tables, processes the changes since the last sync, groups the resulting schedules by a tag key you choose, and disables any schedule that no longer has a valid network target.

Component Version
Service Graph Connector Central v2.4.0
Service Graph Connector for Infoblox v1.5.0
CMDB Workspace v9.0.0
Discovery Admin Workspace v1.13.0 to enable schedules; v1.15.0 to activate them
ServiceNow AI Platform Australia release, ZP9 or later, or YP13 or later

Enabling the feature happens in the Discovery Admin Workspace. Go to Settings, then IP Address Management (IPAM), and follow these steps.

  1. Turn on the Enable auto-created schedules toggle.
  2. Enter a tag key. Discovery looks up the key’s value in the Key Values table, searching subnet records, so addresses that share a value land in the same schedule. Enter a single space if you do not want a key.
  3. Choose the update frequency, the refresh time of day and a start date, then select Save.
  4. To pull IP data immediately, select Refresh IP data.

Each generated schedule has a consistent shape. Its maintenance source is Discovery-IPAM Integration, it starts inactive for review, its MID Server selection is set to a MID Cluster, and its description records the managed network, the grouping criteria and navigation links. Each synchronisation writes an execution record covering metrics, configuration and errors, and the integration is designed to prevent simultaneous runs. For the general concept behind these schedules, see how Discovery schedules work.

Activation is a separate step. Open the Discovery Admin Workspace, go to Schedules, choose IP-based discovery, and tick the schedules in the Needs attention section. Select Activate. In the dialog, pick either a specific validated MID Server that is up, or a MID Cluster, which adds failover and load balancing. Set a run option such as On Demand, After Discovery, Weekly, Daily or Calendar Quarter End, then select Save and activate. An optional time limit cancels remaining tasks when it is reached, even if the scan has not finished.

Property Default Effect
glide.discovery.schedule.autogenerate.debug false Turns on detailed logging.
glide.discovery.schedule.autogenerate.group empty Sets the key used to group schedules, such as a location attribute.
glide.discovery.schedule_ipv4_limit 65,536 Maximum IPv4 addresses in one generated schedule.
glide.discovery.schedule_ipv6_limit 20,000 Maximum IPv6 addresses in one generated schedule. On instances below ZP3 and YP9 the limit must not exceed 5,000.

Measuring Coverage With CMDB Coverage

CMDB Coverage compares the allocated IP addresses held in IPAM with the configuration items discovery has found, and reports where the CMDB and the address records disagree. For background on how the CMDB matches records to configuration items, see identification rules. It supports the Zurich and Australia releases and is available through the ServiceNow Store. Users with the sn_cmdb_admin role configure the application and manage its records, while sn_cmdb_user holders read the data and view the dashboard.

The dashboard reports four groups of figures:

  • Infrastructure coverage: the percentage of allocated IP addresses linked to a configuration item.
  • IP-to-CI association: how allocated addresses divide across single matches, multiple matches and no match.
  • Discovery schedule gaps: allocated addresses in IPAM that no active discovery schedule covers, shown as a count and a percentage.
  • Network coverage: the totals of managed networks, IP subnets and allocated IP addresses imported from IPAM.

Open the CMDB Coverage Dashboard from the Governance area of the Service Graph Workspace, under the Manage group, or from Quick links in the CMDB Workspace. The CMDB CI class models store app installs automatically and SGC Central is required. The Discovery plugin is optional, but the Discovery schedule gap widget needs it. Configure an IPAM connector asks whether a connector is already set up; if IPAM data reaches the CMDB from another source, set “Already configured or set up through another source” to true. Initialize CMDB Coverage starts with Begin initialization, and a progress tracker shows the percentage complete. For a related view of CMDB health, see the CMDB health dashboard guide.

Job What it does
PopulateBinaryTable One-time job that converts historical IPv4 addresses to binary for fast matching. IPv6 is not converted.
InitializeAllocatedIPTable Runs after PopulateBinaryTable. Sets each address to no, one or multiple CI matches and links to discovered items.
ProcessStagingTable Processes new and changed address records detected in real time by the database listener.
SubnetUsageCount Daily job that counts free, allocated and reserved addresses per subnet.
Find missing IPAM ips in discovery Finds gaps between IPAM data and configured discovery ranges and schedules, and records them for review.

The db_listener_enabled and table_extension_enabled properties both default to true and should not be changed. A third property is off by default. To fill the table that links schedule gaps to allocated addresses, create a custom system property named sn_cmdb_ip_cov.log_associated_missing_ip in the CMDB Coverage scope and set it to true. Without it, that table stays empty.

To check the tables behind the figures, open Settings on the dashboard and select Review CMDB tables, which needs the sn_cmdb_admin role. Review the tables in the IP coverage CI table configurations list and add any others you need.

Frequently asked questions

What does ServiceNow IPAM data consist of?

Managed networks, IP subnets and allocated IP addresses, held in three CMDB tables. Each record needs an operational status before Discovery uses it.

Does the IPAM Discovery integration start scanning straight away?

No. The schedules it creates start inactive and need activating in the Discovery Admin Workspace.

What IPv6 limit applies to an auto-generated schedule?

The default is 20,000 addresses per schedule. On instances below ZP3 and YP9 the limit must not exceed 5,000.

Can workflows change IP records in Infoblox?

Yes. Four Infoblox IPAM activities can register, reserve, list and delete IP records. They run on a MID Server with REST capabilities.