OBLYTECH Logo
OBLYTECH Logo

Workspace dashboards: configuring and sharing dashboard views

A dashboard appears on a workspace in two steps. Its Details panel has to list the workspace under Dashboard Visibility, and the dashboard then has to be placed on a workspace page. Sharing is a separate step that decides who can view or edit it. Sharing grants access to the dashboard itself, while each chart keeps its own access rules. For the wider concept, see the plain explanation of what a dashboard is.

Two dashboard families share one name

Platform Analytics dashboards live in the Platform Analytics library: All, then Platform Analytics, then Library, then Dashboards. Responsive dashboards built in the Core UI sit under All, then Self-Service, then Dashboards, or under All, then Performance Analytics, then Dashboards. Check which family a dashboard belongs to before you edit or share it, because the steps and roles differ.

Core UI dashboards are in maintenance mode, and changes to them are limited to security fixes. Teams can migrate them to the Platform Analytics experience.

Linking a dashboard to a workspace

Dashboard Visibility is set on the Details panel, which opens from the info button on the Dashboards overview. The field works in one direction. Naming a workspace there does not put the dashboard on that workspace’s pages. It only makes the dashboard available to choose when a page is built.

The Details panel also records the requester, the owner and an owner group. The owner is the creator by default, and an entire group can own a dashboard. Marking a dashboard as Certified requires the admin or dashboard_admin role.

To place a dashboard on a workspace page, create the page from the Dashboards page template inside the workspace. Open All, then Experiences, then the workspace. Creating that page needs the ui_builder_admin role. Then open the Dashboard component’s configuration panel and choose the dashboard under Default dashboard. For the workspace build itself, see creating a ServiceNow workspace in Workspace Builder. If it is missing from that list, check that its visibility includes this workspace or experience. To make a dashboard the landing page for users, see setting a default dashboard as the home page.

Sharing a Platform Analytics dashboard

Open the dashboard in the library, select More actions, and choose Share. In the Grant access field, enter users, groups or roles. Sharing with roles needs read access to the Roles table.

Each recipient gets one of two rights. Add as viewer grants viewing rights only. Add as editor grants editing rights, and the sharer must be in the same application scope as the dashboard to add an editor. Viewers can open and view the dashboard but cannot edit it.

Sharing can be passed on. Select Allow recipients to add, edit, or delete sharing permissions to let recipients share further. A viewer can share only as a viewer. An editor can share as a viewer or as an editor. Nobody can use sharing to give themselves or someone else edit rights they were not originally given.

Copy link copies the dashboard address for the tab that was open when the dialog was opened. Copy link with filter also applies the filters configured on the dashboard or tab. Confirm saves the share, and reopening the dialog shows each recipient and their rights.

Sharing with the dashboard_user role reaches any user who holds at least one role. For the access design behind sharing choices, see the security and access design guide for reporting and dashboards.

What a shared dashboard exposes

Sharing a dashboard does not share the charts on it in the same way. Visualizations built on table data are shared automatically with the people you share the dashboard with. Edit rights from sharing do not extend to those visualizations, and view rights do not extend to them outside the dashboard.

Visualizations that show raw data, such as lists, depend on the viewer’s rights to the underlying table. A viewer without those rights sees a message in place of the visualization, including when drilling into list data.

Sharing a responsive (Core UI) dashboard

Core UI sharing starts from the Sharing icon in the dashboard list, which opens the Share panel. Select Add groups and users, type a name in the To field, pick a user, group or role, and set Can view or Can edit in the Recipients list. Select Share. Clearing the Send an email invitation check box skips the notice, and sending notices needs email servers configured.

Can edit works only when the recipient is in the same domain as the dashboard. Ordinary owners share Core UI dashboards with users and groups. Admin and dashboard_admin can manage users, groups and roles on any dashboard, and users with admin, pa_admin, dashboard_admin or pa_power_user can see roles in the Share panel.

Sharing a Core UI dashboard does not grant permission to its widgets. Most Performance Analytics widgets inherit security rules from the dashboard they sit on.

Limiting who is allowed to share

Admins can narrow Core UI sharing with a comma-separated list of roles in the property glide.cms.share_dashboards.role, found under System Properties, then Dashboard Properties. Users with a listed role see the Share icon on dashboards they own. Users without one do not see the Share panel. If the list is empty, any user can share their own dashboards.

A misspelled role cannot share. If the list holds one role and that role is misspelled, nobody can share until the value is corrected.

Roles and what each one can change

On Platform Analytics dashboards, any role can create a dashboard and edit one the user owns or has editing rights to. Editing rights come from sharing rather than from a role. The dashboard_admin role reaches across ownership and can share, edit, delete and configure any Platform Analytics dashboard. Certifying a dashboard requires the admin or dashboard_admin role.

Core UI permissions work differently. A user with no role can view only the dashboards shared with them. Any role can create dashboards and share the ones the user owns with users and groups. Adding or removing Performance Analytics widgets requires pa_power_user rights, and only pa_power_user, pa_admin and admin can add those widgets at all.

Widget access is a separate layer. For how roles govern access to data more broadly, see how roles control access in ServiceNow. Widget ACLs apply when a widget is added to a dashboard, except for Performance Analytics widgets. A viewer who can see the dashboard but not one of its widgets sees an empty placeholder.

Restricting recipients with reference qualifiers

On the Australia release, reference qualifiers limit the names that appear in the recipients list. Open the par_dashboard_permission table, open the dictionary entry for the Users column from the Columns tab, add conditions on its Reference Specification tab, and save. Repeat for the Group and Role columns. The steps need the admin role.

Sharing across domains

Only dashboards that have been shared are visible to other users in a separated domain. A user can edit a shared dashboard only when they are in the same domain as it. Child-domain users have read access only. For child-domain users to view parent-domain dashboards, both domain separation and delegated administration must be enabled.

Administrators should avoid editing a separated dashboard from the global domain, because their additions will not show inside the separated domain.

Frequently asked questions

Does adding a workspace to Dashboard Visibility put the dashboard on that workspace?
No. It makes the dashboard available to choose when a page is built from the Dashboards page template. The dashboard still has to be selected in the Dashboard component’s configuration panel.

What is the difference between Add as viewer and Add as editor?
An editor can save changes and can share the dashboard further. Adding an editor requires the sharer to be in the same application scope as the dashboard.

Does sharing a dashboard also share the charts on it?
Visualizations built on table data are shared automatically. Edit rights from sharing do not extend to them, and view rights do not extend to them outside the dashboard.

Why does a shared dashboard show a placeholder where a widget should be?
The viewer probably lacks access to that widget. Widget ACLs apply to widgets added to a dashboard, except Performance Analytics widgets, and a viewer without access sees an empty placeholder.

Can I stop some roles from sharing Core UI dashboards?
Yes. List the roles that may share in glide.cms.share_dashboards.role, separated by commas. Users without a listed role do not see the Share panel. Admin and dashboard_admin can always share.