OBLYTECH Logo
OBLYTECH Logo

Smart Assessment Engine: templates, delegation and normalization

Smart Assessment Engine is the ServiceNow application for running assessments in governance, risk and compliance work. A template defines the questions, a published template produces assessments, and work can be passed to someone else by reassignment or delegation. Scores roll up from single questions to the whole assessment and can then be normalized onto a common scale.

How a template is built and what it holds

A template is the blueprint each assessment is generated from. You design it in the template designer, which needs the Smart Assessment Designer plugin. Creating a template requires at least one active template category, the template manager role, and a role that matches the category. Copying an existing template carries across its questions, sections, instructions and settings.

A template can be published or unpublished, and the Assessment Workspace landing page lists both states. Assessments are created from published templates, and a published template is locked unless its category has quick edit switched on. The Settings page holds the duration, which is the number of days between sending an assessment and the expected return, and the assessment reader role, which sets the minimum role needed to view the assessments the template generates.

Questions sit inside sections. A section holds either subsections or questions, but not both, and a subsection holds questions alone. This lets a subject expert answer one section while a colleague answers another. The designer offers nine question types: text, drop-down list, radio button, check box, number, reference, attachment, date and code. Choosing several records as an answer is available for drop-down list, check box and reference questions. Each question can carry guidance text, a required flag, a justification requirement, and a condition that shows the question when earlier answers meet a rule.

Reference cards keep the record in view while an assessor works. On the Questions tab, choose Add assessment reference, enter a card description, pick an assessment target, select fields and drag them into order. The card appears in the reference panel during the response.

Plugins and roles to activate before the first assessment

Four plugins form the core.

Plugin Plugin ID Purpose
Smart Assessment Dependencies com.sn_smart_asmt_dep Installed with the Smart Assessment Engine package
Smart Assessment Core com.sn_smart_asmt Templates, instances and the Assessment Workspace
Smart Assessment Designer com.sn_smart_asmt_desg The drag-and-drop template designer
Smart Assessment Connected com.sn_smart_asmt_conn Integration, including the Trigger Smart Assessment flow action

The same package also includes migration tools for legacy metric types, post-assessment actions, response automation and basic scoring.

Access is governed by roles. Assessment actors respond to assigned assessments and reassign that work. Assessment admins manage categories and templates and can view, cancel and reassign any assessment. Template managers write templates within their mapped categories. Template developers write response automation scripts, alongside an admin or manager role.

Passing, cancelling and delegating in-progress work

Reassignment moves an in-progress assessment to another person. The user needs the reassign role and the template category role for that template. From the assessment list, select the assessment, open the more actions menu, choose Reassign, enter the new assessor in the Reassign to field and confirm. Actors can reassign work assigned to them, so an administrator is not needed to hand work on.

Cancelling ends the work instead of moving it. An assessment admin can cancel and confirm the dialog, after which the assessment can no longer be edited.

Delegation covers an absence. It uses the standard platform delegate feature and is off by default for each category, so an administrator must switch on Allow user delegation first. Each user then adds a delegate on their own profile, on the Delegates tab, selects the Assignments option, sets start and end dates and saves. Enabling the category alone is not enough.

What a delegate can do follows the role the delegator holds:

  • A delegate of the owner can respond to questions and submit.
  • A delegate of the requestor can cancel, reassign and edit the due date while the assessment is open.
  • A delegate of a contributor can answer questions inside that contributor’s scope.

Delegation does not grant roles. The delegate must already hold the role the action needs, so submitting needs the actor role, and acting for a requestor needs the assessment reader role. Actions taken by a delegate are recorded against the delegate.

How scores roll up from questions to the assessment

Scoring needs the Basic Scoring plugin and is set up on a draft template, not a published one. Scores can be set at four levels, each optional: question, subsection, section and assessment. The levels depend on one another, so an assessment score draws on its sections, a section draws on its subsections and questions, and a subsection draws on its questions.

Scoring logic depends on the question type. Radio questions take a score per choice and a question weight. Multi-select questions take a score per option, a function across the selected options and a weight. Number questions use the entered number as the score.

Each level applies one aggregation function to the scores beneath it.

Function How it combines scores Available at question level
Sum Adds the scores together Yes
Minimum Takes the lowest score Yes
Maximum Takes the highest score Yes
Average Adds the scores and divides by the count Yes
Weighted average Weights each score, sums them, then divides by total weight No

Weighted average suits items that should count for more. Take three questions scored 4, 2 and 5, weighted 3, 1 and 2. The weighted total is 12 plus 2 plus 10, which is 24, and dividing by the total weight of 6 gives 4. A plain average of the same scores is 3.67, so the function changes the result. Question, subsection and section weights default to 1.

Assessment and section levels also choose what they group together. An unanswered question is skipped by default, and clearing that option shows a default score field instead. Sections and subsections follow the same pattern.

Once an assessment is completed, question scores are stored in the question instance table. Section, subsection and assessment scores are stored in the scoring metric instance table.

Normalization puts scores on a common scale

Raw scores are hard to compare when questions use different scales. Normalization converts them to a standard range, typically 0 to 100. It supports number, drop-down, radio button and check box questions, at the assessment, section, subsection and question levels.

Normalization is switched on for a draft template on the Scoring tab. The category must allow it, and the category sets the template’s defaults, including whether normalization is on and which strategy applies. Changing a template’s purpose resets those settings, and reassigning the purpose is what updates the template’s values. Settle the purpose before tuning the scale.

For the built-in linear strategy, the defaults are the strategy, the current minimum and maximum, the new scale minimum and maximum, the scale definition and relative scaling. The scale definition says whether a higher score or a lower score is better. Relative scaling, when on, calculates the normalized score relative to the maximum value.

The formula depends on the direction. For a higher-is-better value, the raw score is placed as a fraction between the current minimum and maximum, and that fraction is stretched across the target range. For a lower-is-better value, the fraction is inverted first, so a low raw score gives a high result.

Administrators with the assessment admin and developer roles can create custom strategies with named inputs and a script that returns a floating-point number.

A manual change at a specific level stops later default edits from reaching that level. Disabling scoring also disables normalization.

Triggering assessments, scope and responding

Assessments are generated with the Trigger Smart Assessment flow action in Workflow Studio, or by a script that calls the same action. The caller supplies the published template, the assessors, scope items, due date, duration, duplicate handling and an assessment group.

Scope items record what an assessment is about. Each one points to a record, identified by a table name and a record sys ID. Scope is not set on the template. It is attached when the assessment is created, so one questionnaire can be sent about different vendors or controls, and each copy keeps its own answers. The header, navigation panel and section viewer show up to three scope items, and extra items sit behind a “+ N more” indicator.

Assessors answer from their workspace, where answers save as they go, or from My Assessments in Employee Center. Submit completes the response. The All questions filter narrows the list to questions matching all selected filters.

Assessors with several assessments can combine them and submit or reassign the group in one action. Auto copy replicates a response to matching questions in the other combined assessments. Auto copy is available only when all the combined assessments come from the same template.

Frequently asked questions

Can someone hand an assessment to another person?

Yes. A user with the reassign role, and the template category role, can move an in-progress assessment to another user. An assessment actor can reassign the work assigned to them. A delegate of the requestor can reassign on the requestor’s behalf once delegation is set up.

Does a template’s purpose change how scores are normalized?

Yes. The purpose determines whether normalization is on and which strategy applies by default. Changing the purpose resets those settings, and reassigning the purpose updates the template’s values.

Which scoring function suits a weighted assessment?

Weighted average is built for weighted questions: it multiplies each score by its weight and divides by the total weight. Sum, minimum, maximum and average are defined without weights.

Is the designer plugin needed to run assessments?

The designer plugin provides the template designer, which is required to design or change templates. The core plugin provides the Assessment Workspace, and the connected plugin provides the trigger flow action.