A SIEM event ingestion integration pulls correlated events, alerts or offenses from a security console and turns them into security incidents in Security Incident Response. Each source gets a profile that sets its event selection, field mapping, polling schedule and write-back rules. ArcSight ESM, Splunk Enterprise Security and IBM QRadar share the same basic sequence.
Why the profile is the unit of work
The profile is where ingestion decisions live. One profile holds one source, one event selection, one field mapping, one schedule and one set of write-back rules. A team that watches three different detections in ArcSight therefore needs three profiles, while the console connection itself is configured once and can be shared between them.
ArcSight profiles carry an Order value that defaults to 100. When two profiles share triggering conditions, the lower number runs first. The Active checkbox is cleared by default, and an inactive profile ingests nothing, so leave it cleared until the profile is fully configured. For the wider planning around these choices, see the Security Operations Integrations planning guide.
Connecting the console
The configuration is handled by a user with the sn_si.admin role. Install the vendor’s application from the ServiceNow Store first, then create a new entry under the integration configurations.
| Field | What to enter |
|---|---|
| Name | A unique label for the manager; spaces are accepted, parentheses are not |
| API endpoint URL | The console address including its API port |
| API account user name and password | The dedicated API user created inside the console |
| On premises deployment | Cleared for a cloud console with direct internet access; selected for an on-premises console |
| MID Server application | Required on premises; any available MID Server in the application is used |
For an on-premises console, create a MID Server application, deselect the option that includes it in the ALL application, and add the MID Servers to its members list. Once submitted, the configuration appears as a tile on the Security Integrations page. If the tile is missing, check the Show Configurations choice list on that page.
Choosing the query viewer and the correlation rule
For ArcSight, the profile needs the Resource ID of a Query Viewer that exists in the ArcSight console. When you continue past that field, the form validates the ID and returns the viewer’s name, which confirms you picked the right one. If validation fails, look the ID up in the console.
Next, select one correlation rule type from the events the viewer exposes. A profile takes one rule type, so a second detection needs a second profile. That keeps one detection’s mapping from having to cope with another’s fields.
Splunk handles single events differently. Splunk ES also supports manual forwarding of individual notable events into the instance, and an incident is created using the manual forwarding profile’s mapping. This path needs the sn_sec_splunkes.api_account_access role and has no polling schedule, because the analyst decides which events cross over. For the wider Splunk setup, see the Splunk integration guide.
Mapping SIEM fields to incident fields
The form lists the sample data’s field name and value pairs on the left. You drag a field onto the Input Expression column beside an incident field on the right. Unmapped source fields appear in light blue and mapped ones turn gray, so gaps are easy to spot.
A source value can fill several places. A field holding several IP addresses, asset names or URLs is parsed into separate entries, which can populate several observables or configuration items. The Observable field can be mapped more than once, and Configuration Item and Work notes accept multiple values. A field that does not support multiple values, such as Category or the user fields in IBM QRadar, cannot take two values, and the preview reports an error if you try.
IBM QRadar offenses carry list fields for categories, destination networks, source address IDs, local destination address IDs, remote destination IPs, contributing rules and users. Base-product fields such as Category and the user fields accept one value, so a QRadar list elsewhere needs a new incident field of type List. Typed event or flow fields take a prefix such as ${Event:fieldname}$ or ${Flow:fieldname}$.
Values that are close to, but not exactly, a choice list need the script editor, which opens from the link on the mapping form or the bracket icon beside a field. A common case is the configuration item. If a host name has no matching record in the configuration management database, the rule can be edited so that an IP address populates the field instead.
Incident generation conditions gate creation on chosen criteria, joined with AND or OR. The comparison is case-sensitive, so a rule name has to match the source exactly. Alert aggregation criteria work the other way round: they attach a new alert to an open incident that already matches on chosen fields, which stops one ongoing problem from producing a stream of duplicates.
Previewing before scheduling
Preview is a read-only check. Choose a sample event and the form shows the incident as it would be created. Nothing is saved, so you can repeat it freely. Read the description and work notes in the preview as they will appear on the incident, and correct any mapping before scheduling. For a broader go-live checklist, see the testing and acceptance checklist.
If the preview shows an error, return to mapping, correct the field and preview again. The scheduling step does not open until the preview succeeds. Choose a sample that resembles the detection you are ingesting.
Setting the polling schedule
Each profile has its own polling interval. The default is five minutes for ArcSight and QRadar profiles, and it can be lowered to one minute. Splunk profiles also default to five minutes and can be changed as needed. A shorter interval puts incidents in the queue sooner but adds load on the console, so match it to how quickly the detection needs attention.
Ongoing ingestion keeps polling for new events. One-time retrieval pulls historical events from a Since date through the present and then stops. For ArcSight, that retrieval can reach back seven days from the current date. It suits events still being worked when the profile is switched on, not an archive load. To run at a fixed time, set an initial ingestion time and an increment in minutes. For a daily check that runs at 4 AM, enter 04 05 00 as the initial time, so the profile runs five minutes later, and enter 1440 as the increment.
The Splunk alert ingestion integration can create up to 1,000 security incidents in a 24-hour period, and each fired alert contributes up to 100 events. Beyond those limits, later events are ignored, so check event volume before tuning the schedule.
QRadar pulls both new and updated offenses. An offense that failed the incident criteria on first appearance is checked again on later pulls and becomes an incident once it qualifies. Once an incident exists for an offense, later updates to it are ignored, since the incident becomes the working record.
Writing status back to the console
In ArcSight, the Update Correlated Events upon SIR Incident Creation option changes the event stage and can post comments. Without that option, the stage does not change. Comments can include incident values written as a field name inside the dollar-and-brace pattern, such as the incident number or the assignment group. On closure, the stage can be set on each correlated event linked to the incident, including aggregated events.
QRadar uses offense status instead. On creation, an offense can be set to Open with a comment or to Hidden, which removes it from the dashboard. On closure, the offense closes when the incident’s close code matches a closing reason configured in the QRadar dashboard. If no match is found, a default close code is used. For how write-back fits with other integration designs, see the Security Incident Response integration patterns.
| Console | At incident creation | At incident closure |
|---|---|---|
| ArcSight ESM | Event stage updated, comments posted | Stage set on triggering and aggregated events, closure comments posted |
| IBM QRadar | Offense set to Open with a comment, or to Hidden | Offense closed with a matching closing reason, or with the default close code |
Reading integration runs when ingestion stalls
When a profile looks idle, open the integration runs under the common ingestion area. A run takes place each minute and records a status of Success, Timed-out or Waiting, along with the number of incidents it created. The Number link shows which events were ingested, and the execution details link steps through the flow. For the wider checks, see the Security Operations troubleshooting guide.
Authentication problems often sit on the console side. On Splunk, a certificate error on port 8089 means the certificate does not carry a common name matching the server’s host name. The default certificate used for API access on that port has to be replaced with a valid one. The system logs show the condition, which confirms the cause before you change anything.
Frequently asked questions
How often does an ingestion profile check the console?
The default is five minutes for ArcSight and QRadar profiles, and it can be lowered to one minute. Splunk profiles also default to five minutes and can be changed as needed. The right value depends on how quickly analysts need the incident and what the console can handle.
Can a profile load events from before it was activated?
Yes, through a one-time retrieval with a Since date. For ArcSight it can reach back seven days. After the one-time retrieval finishes, the profile does not pull further events from that date onward. Ongoing ingestion is a separate setting on the scheduling step.
Why are some list values missing from an incident?
Base-product fields such as Category and the user fields accept one value. QRadar list values need a new List type field, and the default supported type is non-reference List.
Can an analyst push one event into the instance?
Yes, through manual forwarding from the Splunk Enterprise Security console. That route is manual, so it has no polling schedule.