OBLYTECH Logo
OBLYTECH Logo

Configure Threat Intelligence Feeds in ServiceNow TISC

A threat intelligence feed in ServiceNow Threat Intelligence Security Center is a scheduled data source that converts external indicators into threat library records. Setup means choosing a feed type from the catalog, completing the source, parsing and schedule settings, then enabling the record. For the background, read What Is ServiceNow Threat Intelligence? A Plain-Language Guide.

Find the feed catalog and choose a feed type

Feeds are managed from the Threat Intelligence Security Center workspace, and the Threat Intelligence guides place them in the wider program. Open the Integrations icon, select Threat Intel Feeds, and then open the All Feeds view. The catalog shows each source as a tile. A status filter separates Enabled, Disabled and Draft feeds, a source-type filter separates Open Source, Other Source and Premium Source feeds, and a search box matches names and descriptions.

To add a source, select Configure new source and then the feed type. Configuring a feed requires the sn_sec_tisc.admin role. Analysts with the sn_sec_tisc.analyst role can browse ingested records, but creating new RSS records is not supported from that view. For how access is planned across a team, see Threat Intelligence security and access design.

The feed type decides which fields appear and which integration script runs. The base system supports the following types.

Feed type What it brings in Setup note
TAXII STIX and TAXII collections Uses its own configuration procedure
STIX HTTPS STIX objects served over REST on HTTPS Changed through the Edit action on the feed card
MISP Events in MISP format REST endpoint must end in /manifest.json
Text, CSV, JSON Hosted files Extracts URLs, domains, file names, hashes and IP addresses
RSS Items stored as RSS Feed records Records can be tagged, linked to cases and set to expire
Custom Feeds with purpose-built parsers Includes the CrowdStrike premium feed and the custom MISP API feed

Fill in the source, parsing and authentication settings

The form opens with identity fields: a name, a description, a logo sized at 72 by 72 pixels, an industry category, and a source type drawn from Government, ISACs, Open Source, Premium Source and Other Source.

The Configuration section holds the settings that shape the data. The expiry period, entered in days, sets how long ingested data stays valid, so a value of 180 expires each record 180 days after ingestion. Override Source Expiration applies the profile’s expiry to incoming records in place of whatever the source supplies. Confidence takes a value from 0 to 100 and applies to all the applicable records from that source. Override Source Confidence applies the profile’s value in the same way.

Use REST Message controls how the request leaves the platform. When it is cleared, the application calls the REST Endpoint URL directly. When it is selected, you need headers or settings held in an outbound REST message record, and the REST Message and REST Method fields become mandatory.

Data Parsing Mechanism offers Automated IoC Extraction, the default for Text, CSV and JSON feeds, or Custom Field Mapping, which defines how feed fields map to observable attributes.

Authentication Required applies when the REST Endpoint URL retrieves the data. The options include API ID with API Key, API Key, Basic Authentication and several combinations. Request headers go in as one key and value pair per line, separated by a colon. To send a stored credential inside a header, wrap its authentication label in the dollar-brace markers, as in x-api-key:${API Key}$.

The Advanced checkbox reveals the Integration script and Report processor fields. The default integration script follows the feed type, so selecting MISP uses the MISP integration script. The report processor for MISP feeds is preconfigured and cannot be replaced.

Set the schedule and expiry so the feed stays current

The Run field sets the frequency: Daily, Weekly, Monthly, Periodically, Once, On Demand, or a business calendar entry start or end. The default is On Demand, so a new feed does not run on a timetable until you change this field.

Fetch Data From sets the starting point for ingestion, and it deserves a deliberate value. The first run pulls data from that moment forward, and later runs fetch the increment since the previous run. Suppose a feed runs hourly and the start date is 6:00 in the morning. The run at 10:00 collects everything from 6:00 up to that point, and the run at 11:00 collects the hour that has passed since. This field does not apply to Text, CSV and JSON feeds.

RSS records follow their own expiry logic. Each record gets an expiration time equal to its creation date plus the configured number of days, so a 30-day period gives each record 30 days. With the expiry period left empty, RSS records stay active and do not expire.

Feed-type rules that change the setup

MISP API feed. Under Integrations, open the Custom tab, select the MISP feed card, and choose Edit. The feed is inactive by default. Update the REST endpoint URL and add authentication if the server requires it. Then open Additional Settings. The filters cover whether to include unpublished events, creator organization names or IDs, tag names or IDs, a threat level, and a distribution level. Leaving the threat level or distribution level empty includes all levels. The filters combine, so an event must meet all the criteria you set.

The fetch date is compared with a different timestamp for each event status. Published events use their Published timestamp, and unpublished events use their Last updated timestamp. Each imported event carries an External Reference record in Related Records with a link back to the event on the MISP server. Entity types outside the mapping are not ingested into the library.

Text feeds. Text feeds extract URLs, domains, file names, hashes and IP addresses from the file. The base system ships with a long list of prebuilt text feeds on the Text tab under Integrations. To change one, select Edit, adjust the settings, and select Save.

CrowdStrike premium feed. The CrowdStrike feed sits under the Custom tab and is disabled by default. Open Details and enter the Client ID and Client Secret for an API client created in CrowdStrike. That client needs five Falcon Intelligence scopes: Indicators, Actors, Reports, Malware Families and Vulnerabilities. For the wider connection between the two products, see the ServiceNow and CrowdStrike Integration Guide.

Additional Settings controls what comes in. If you leave the record types unselected, all five record types are ingested. Indicator filters cover indicator types, malicious confidence, targeted industries, and whether indicators must link to actors, reports or malware families. Vulnerability filters cover severity, exploit status, CVSS v3 severity, a minimum base score, CVE IDs, a published date range, and links to actors, threats, products and vendors. Threats in CrowdStrike correspond to malware in the library.

The confidence mapping takes four levels, High, Medium, Low and Unverified, and assigns each a value from 0 to 100. A mapping saved in Additional Settings overrides a confidence value entered under Details, so check the Additional Settings values first. Several system properties tune CrowdStrike runs. The sn_sec_tisc.crowdstrike_api_limit property sets how many records come back per call, with a default of 1000.

Enable the feed and check the first run

Select Save to create the record. Its details are validated, and the feed is disabled by default. If you are not yet sure of the details, select Save as Draft instead. A draft stores the configuration but cannot be enabled, so you return later, fill in the remaining fields, and save it as a full record.

Select Enable on the record, or use the Actions menu on the feed tile. Once a feed is enabled, its configuration fields become read-only. On the CrowdStrike feed, the Save button is hidden as well. That prevents changes to a feed that is actively ingesting data. To change anything, disable the feed, make the change, and enable it again. The same rule applies to TAXII collections and enrichment integrations.

After enabling, execute the record to start the integration, then open the Integrations Run section to verify the run details. If a run fails, the troubleshooting guide is the next place to look. For a structured sign-off after the first run, use the testing and acceptance checklist.

A feed that loads poor records can be cleaned up from the library. Open an observable and select Delete. That removes its related records, except the original source data, and triggers re-aggregation. If you also select the Delete Source Records check box, the source records go too, and re-aggregation stops for them. That option removes the source records themselves, so use it with care.

To set up a similar feed, open the existing feed’s edit form, select More Actions, then Duplicate. The copy takes the original name with Feed-copy appended, such as CrowdStrike Feed-copy, and it carries the associated observables, indicators and actors with it.

For how feeds fit alongside other connections, the integration patterns guide covers the wider design choices.

Frequently asked questions

Why can’t I change a feed after I enable it?

Its configuration fields become read-only so that a feed that is ingesting data does not change underneath the run. Disable the feed, make the change, and enable it again.

What is the difference between Save and Save as Draft?

Save validates the details and creates the feed in a disabled state. Save as Draft stores the configuration without enabling it. A draft cannot be enabled, so finish the remaining fields and save the record in full first.

Which feed types need a manifest URL?

MISP feeds. The REST endpoint URL has to end with /manifest.json for the feed to be supported.

Why does a scheduled feed skip older records?

The Fetch Data From date sets the starting point. Ingestion begins there, and later runs collect what has arrived since the previous run. The date you enter in Fetch Data From is the earliest point the feed will collect from.

Do RSS records expire?

They do when an expiry period is set. Each record receives an expiration time equal to its creation date plus the configured number of days. With no expiry period, RSS records stay active.