OBLYTECH Logo
OBLYTECH Logo

Threat Intelligence Sightings, MISP and Observable Enrichment

A sightings search shows how often an observable, such as an IP address, domain, URL or file hash, appears in your logs, and whether a member of a trusted circle has also reported it. Results split into internal and external sightings. The steps below follow the Brazil release of the platform.

What a sighting measures

A sighting is a record that an indicator was seen in your environment. The items searched for are observables. Observable types are set in the search configuration. The configuration topic gives IP addresses, hash values, URLs and domain names as examples.

The point of the exercise is prevalence. A single hit says little. A count across a time window that runs back from the incident’s creation, or across an explicit date range, shows whether an address is a one-off or part of a pattern. Repeating the search after containment shows whether the fix reduced the hits.

Running a sightings search from an incident

The analyst needs the sn_si.analyst role, and an active implementation must exist. For the workspace used to work incidents, see the Security Incident Response Workspace guide. Supported sources are Elasticsearch, Splunk, McAfee ESM, HPE ArcSight Logger and QRadar incident enrichment. Without an implementation, the Run Sightings Search action does not appear in the menus.

  1. Open the security incident and select the Show IoC related link.
  2. On the Observables related list, select the observables to search.
  3. Choose Run Sightings Search from the actions drop-down.
  4. Set the window. “Last” counts hours or days back from incident creation, with a default of seven days and a limit of 99. “Between” takes a date range, which defaults to the opening time and the seven days before it.
  5. Select Search.

Values entered in the dialog override the capability configuration for that run.

Reading the three result views

View What it shows
Sightings Search Results One row per search: observable count, internal and external sightings, matched configuration items, and the date range searched
Sightings Search Details Aggregate counts for each observable and type across all searches on the incident
Sightings Search Data An “Is Local” flag, the sighting count, a search link that opens the log portal with the query applied, and the query text

The results form also lists unmatched hosts, which are potential configuration items that matched no record in your configuration management database. Those entries help a responder spot coverage gaps. When the implementation is set to include raw data and a sighting is found, a raw sample attachment is added to the record.

Sharing results with a trusted circle

To share one result, open the sightings search result, select Share sighting search result, enter a name and description, choose the circles and submit. Three Security Incident Response properties can automate sharing: sending results to the default ServiceNow trusted circle, including observables that had no local sightings, and replying with local sightings when a threat share arrives from a trusted circle. For implementations configured to include raw data, the raw samples are left out of what is shared. For the broader threat sharing setup, see Threat Intelligence feeds and sharing.

MISP sightings and sighting searches

In MISP, observables are called attributes. A sighting confirms that an attribute was seen, and one attribute can be sighted many times. Two other markings exist. A false positive means the attribute is not a valid sighting. An expiration means the attribute is valid for a limited time, and each organization can set one expiry date per attribute. Sightings from organizations marked local on the MISP server count as internal. Those from remote organizations count as external.

Automatic searches are switched on in the MISP integration configuration. The option to run a search when new observables join an incident is enabled by default, and a work note records each run. For a manual search, select observables on the Associated Observables tab, choose Run Sightings Search and set the window.

Analysts can also report back to MISP from the Sightings related list, choosing a sighting, a false positive or an expiry. A report applies across all events the observable belongs to. Reporting to one specific event means doing it locally in the MISP instance. The observable must already exist in MISP, and the sighting date is optional, defaulting to the current time.

Configuration needs the sn_si.admin and sn_ti.admin roles. A Sighting Search Configuration record takes a name, a source set to the MISP log store, an active flag, an observable type, a maximum number of observables per search, and a search string. The search string defaults to the observable placeholder. Inactive configurations do not run.

Finding phished and affected users

A phished user is someone who received a phishing email. A victim user is someone who clicked the phishing URL, which can expose credentials. Both matter during triage.

From the Explore tab, open Search Email and Observables and choose Email Search. The criteria are the sender’s full address, the message ID, the subject and a time window. Results list each email with its received date, recipient and message ID. The Affected Users page identifies phished recipients, though it shows only users that exist on your ServiceNow instance. For a URL or IP address, use Observable Search instead. The User Interaction column reads true when a recipient clicked. Select those users and create child security incidents for them.

Log events must be Common Information Model compliant for accurate results. For the wider Splunk setup, see the ServiceNow and Splunk integration guide. Saved searches on Splunk need the same name and parameters as the configuration, plus Read permission for Everyone, or they may return nothing. Creating them requires sn_si.admin and the CIM add-on. Use Generate Sightings Search Test Query to check a configuration before running it on live incidents.

Observable enrichment in Threat Intelligence Security Center

Observable enrichment adds external context to an observable. The Enrich Observable WhoIs workflow runs on observables of types that the WhoisXML API integration recognises. Threat Intelligence Security Center supports observable enrichment only for the WHOIS integration. For a related view of incident data, see the Investigation Canvas guide. The same section also shows Have I Been Pwned and Shodan cards, so confirm which integrations are live in your instance before planning around them.

To configure one, open Threat Intelligence Security Center, choose Integrations, then Observable Enrichment, and select Configure new enrichment. Name the integration and enter its configuration, such as an API key or a client ID and secret. Saving validates the configuration. The integration starts inactive until you select Enable. Save as Draft keeps unfinished credentials without creating the integration. The role required is sn_sec_tisc.admin.

Threat lookups and how findings roll up

A threat lookup checks observables against vendor integrations. Threat Intelligence Security Center supports threat lookup for VirusTotal and CrowdStrike Intelligence. Run lookups from Threat Intelligence, IoC Repository and Observables, using Run threat lookup on selected rows or on a single record. The role required is sn_sec_tisc.admin in Threat Intelligence Security Center, and sn_si.admin for the Zscaler lookup in Security Incident Response.

When several vendors report on the same observable, the overall finding follows this order:

Latest vendor results Overall finding
At least one vendor reports Malicious Malicious
No vendor reports Malicious, and at least one reports Suspicious Suspicious
All vendors report Clean Clean
No vendor reports Malicious or Suspicious, and at least one reports Unknown Unknown

Each provider can have a Threat Lookup Finding Calculator that maps its response to a finding. A sample script ships with the base system and can be modified.

Looking up indicators of compromise from an incident

Three routes start an IoC lookup. Automatic lookups run when observables are added to a security incident. They need the Threat Intelligence plugin and the sn_si.basic role. For attachments, use the paperclip in the form header, save the record and select Lookup attachments. Files are converted to hash values, and the lookup type for File is inactive by default. The Security Incident Catalog, under Self-Service, takes files through the paperclip attachment, and hashes, URLs and IP addresses as comma-separated entries. Status appears under My Requests.

A scheduled job, Lookup Security Incident Observables, runs the Create Lookup Request for IoC Changes flow for indicators that were added or changed. The flow scans only new data and does nothing when the indicator is empty. Earlier scans remain in the Security Scan Requests tab. The Create IoC Lookup Request activity can be placed in any workflow. It takes the IoC as JSON and the incident identifier, and it returns a lookup request identifier.

Frequently asked questions

How far back does a sightings search look by default?
With the Last option, it looks back seven days from incident creation. With a date range, the range starts at the opening time and reaches back seven days. The Last option accepts up to 99 hours or days.

What separates internal sightings from external sightings?
Internal sightings come from your own environment. External sightings arrive through threat sharing, or, in MISP, from organizations marked as remote.

Can sighting searches run automatically?
Yes, in MISP. The option is enabled by default in the integration configuration, and it runs when new observables join an incident.

Why might a Splunk saved search return nothing?
A name or parameters that differ from the Splunk side, or a missing Read permission for Everyone, can both cause empty results. For other fault patterns, see the Threat Intelligence troubleshooting guide.