OBLYTECH Logo
OBLYTECH Logo

Indicators and Observables in ServiceNow Threat Intelligence

In ServiceNow Threat Intelligence Security Center you create observables and indicators in the Threat Intel Library, then join them with relationship records. An indicator built on a STIX pattern creates its observables automatically when the record is created. Each record type has its own steps below.

How observables and indicators differ

Observables cover two kinds of data: stateful properties, such as the MD5 hash of a file or the value of a registry key, and measurable events, such as the creation of a registry key or the deletion of a file. Observables apply to STIX 1.1 and STIX 2.x. In practice, an observable tells an analyst more when it is recorded next to context about how the threat behaves.

The concept of an indicator is covered in the indicator explainer.

Creating observables by hand

Observables can arrive through scheduled feed ingestion or the import assistant, and you can also create one by hand. In the Threat Intelligence Security Center workspace, open Threat Intel Library, then Observables and All Observables, and choose New. Select the Observable Type first, since it decides which form opens. The role is sn_sec_tisc.analyst.

Fields on the observable record

The fields below match the Brazil release of the product.

Field What it holds
Value The value itself, such as an IP address or a hash
Type The classification, such as IP address, domain name, artifact, file or hash
Confidence A number from 0 to 100 for the creator’s confidence in the data
TLP The Traffic Light Protocol setting for data sensitivity
Reputation The malicious reputation of the observable
Prevent System Updates Stops the system overwriting field values on the record

Other details on the form include Description, Author, Status (active or inactive), Attack Phases, Threat Score, Expiration Time, Source and Is False Positive. The Additional Information section holds Threat Level, First Seen, Last Seen, Threat Severity, Usage Categories and Additional Context.

Domain names add two attributes. Resolves To lists the IP addresses or domain names the name resolves to, and Is FQDN marks a fully qualified domain name, meaning the complete address of a host, naming its hostname, domain and top-level domain. Both appear only on domain name observables.

Source Reported Score, the aggregated value of the threat scores reported by the sources an observable was ingested from, is not on the form by default and must be added manually.

After you save, the system offers Continue, which opens the record for relationship work. A Prevent System Updates check box then appears. Ticking it stops later system changes to the record.

Scanning observables against threat sources is covered in the guide to sightings, MISP and observable enrichment.

Attributes change with the observable type

Each observable type carries its own attribute list, so confirm the type before you fill in the record.

Observable type Examples of attributes
Artifact MD5 Hash, SHA256 Hash, MIME Type, URL
IPv4 Address AS Number, MAC Address
User Account Is Privileged, Is Service Account, Last Login Time
Windows Registry Key Key Modified Time, Subkeys Count
X.509 Certificate Issuer, Subject, Valid From, Valid Until, Is Self Signed

The IoC Repository path and composite observables

A second route runs through All, then Threat Intelligence, then IoC Repository, then Observables. It requires sn_ti.admin, and its form adds a Finding field with Malicious, Suspicious, Clean and Unknown, where Unknown is the default.

An observable composition holds child observables. After you save an observable, the Is composition check box appears; tick it to make the record a composition. An Operator field then sets how the children count toward an associated indicator: AND requires every child to be present, while OR counts the indicator when any child is present. Must not be present marks the absence of the observable as the potential issue, such as a registry key that should exist and does not.

Check Finding values on upgraded records, since existing observables were marked Malicious after the upgrade.

Defining an indicator and its pattern

Indicators live under Indicators in the Threat Intel Library, where you choose New. The role is sn_sec_tisc.analyst. The ID must be unique, and Source records where the indicator came from.

The Pattern field drives extraction

The Pattern field holds the detection pattern. It can be a STIX pattern, and if it is, the system reads observables from it as soon as the indicator’s source record is created. Pattern Type names the language, and Pattern Version must match the kind of pattern data entered.

Indicator field What it means
Valid From and Valid Until The period in which the indicator is valid
Confidence A number from 0 to 100 for the creator’s confidence in correctness
Spec Version Must be 2.1 for STIX objects under this specification
Revoked The creator no longer considers the indicator valid

How extraction behaves

Extraction applies to STIX pattern indicators and runs when the record is created. Editing the Pattern field later does not extract observables from the revised pattern, so treat a pattern change as a reason to review the observables by hand.

Only comparisons resolving to a single literal value produce an observable. Equals, IN and ISSUBSET comparisons are extracted; inequality, greater-than, less-than, LIKE, MATCHES, ISSUPERSET and EXISTS comparisons, and any comparison preceded by NOT, are skipped. Email Message and Network are left out. Unrecognised STIX types, such as vendor extensions, are stored as Other Observables.

Extracted observables inherit Confidence, Expiration Time, TLP, Threat Level and Threat Severity from the indicator, along with its source and source execution run values. Their Additional Context field records the indicator’s ID. If an observable with the same value, type and source already exists, the extracted record links to it instead of duplicating it. Values longer than 256 characters are cut to 256. Extraction is on by default; setting sn_sec_tisc.extract_observables_from_indicator to false turns it off. Setup mistakes beyond these rules are covered in the guide to common ServiceNow Threat Intelligence mistakes.

Linking indicators and observables with relationship records

A relationship record joins two objects: two observables, or an observable and a STIX domain object. The relationship type sets the direction. Direct describes the relationship from the object to the observable, and Inverse describes it the other way round.

Extraction links an indicator to each observable it produced, but not those observables to each other. Create or confirm that link yourself.

Indicator to indicator, and observable to observable

Under Relationships in the Threat Intel Library, choose Indicator-Indicator or Observable-Observable and click New. Fill in the source and target records and the Relationship Type, then Submit. The Domain field on indicator relationships fills itself in and sets the record’s scope.

Confirming potential relationships

Automated correlation rules propose potential relationships. Under Potential Relationships, choose the matching type, select the record and click Confirm Relation. The record then moves into the Relationships section. A relation shows as confirmed only when the correlation rules match, such as two URL observables that share a domain name.

You can also link by hand from the Related Records tab of an observable. Delete removes a relationship.

Recording threat reports that group the objects

A threat report describes a threat actor, a piece of malware or an attack technique, with the context around it. Create one under All, then Threat Intelligence, then IoC Repository, then Threat Reports, and choose New. The role is sn_ti.admin.

Field Purpose
Name Identifies the report
Published The date the author officially published it
Source and Source ID Where the report came from and its identifier there
Description Additional insight and context

After you submit, Reported Objects, Reported Indicators and Reported Observables list what the report mentions. Show Relationships opens the STIX Visualizer, but only when an associated object exists.

An indicator’s related lists include the observables extracted from its pattern, along with sightings, malware, threat actors and threat reports.

STIX TAXII feeds are a separate concern. They are viewed and managed under Integrations and then STIX TAXII by a user with sn_sec_tisc.admin. Setup is covered in the feeds and sharing guide.

A practical order for a new indicator set

  1. Settle the observable values and types, and check whether a record already exists.
  2. Create any observables the feed or import did not supply.
  3. Create the indicator with its STIX pattern, so extraction fills in the observables.
  4. Review the extracted records and their inherited confidence and threat level.
  5. Add the relationships your investigation needs, then confirm the potential relationships the correlation rules propose.
  6. Record the threat report and link it back to the indicators.

Steps 3 and 5 are where rework tends to appear, since a pattern change does not re-run extraction. The threat intelligence guides and services hub groups the wider topics.

Frequently asked questions

Does an indicator create its observables automatically?

Yes, when the indicator uses a STIX pattern. The pattern is read when the indicator record is created. Editing it afterwards does not repeat that step.

Why are extracted observables not linked to each other?

The system links the indicator to each extracted observable, but not the observables to one another. Create those relationships yourself or confirm them from the potential relationships list.

Can extraction be turned off?

Yes. Set sn_sec_tisc.extract_observables_from_indicator to false.

Why do some older observables show as Malicious?

After an upgrade, existing observables were marked Malicious. Check the Finding value on older records and correct it where the evidence does not support that verdict.