OBLYTECH Logo
OBLYTECH Logo

Sighting Search in Threat Intelligence

ServiceNow threat intelligence sighting search lets an analyst investigate how often selected observables occur during a chosen period. The starting point may be a security incident or a Threat Intelligence case. CrowdStrike NextGen SIEM adds a separate configuration workflow for searching Falcon log data. In Brazil, the required role, search controls, and results depend on the route being used.

Begin with the observable and the record that contains it. An incident offers searches through its observable related list; a case offers them through Case Artifacts. For background on these records, see threat intelligence sightings and observables. The procedures below distinguish the shared search capability from the settings and limits of individual integrations.

Choose the threat intelligence sighting search route

  • Security incident observable search. Required role: sn_si.analyst. Configuration or prerequisite: An active capability implementation.
  • Case observable search. Required role: sn_ti.case_user_write. Configuration or prerequisite: Threat Intelligence plugin activation for Security Case Management.
  • CrowdStrike NextGen SIEM configuration. Required role: sn_sec_tisc.admin. Configuration or prerequisite: Installed CrowdStrike NextGen SIEM integration.
  • Falcon Insight profile configuration. Required role: sn_si.analyst. Configuration or prerequisite: A Sightings Search Profile for Falcon Insight.

The incident capability runs through Security Operations Integration – Sightings Search Flow. Given observables, that flow locates implementing capabilities, assembles queries using Sightings Search Configurations, and runs the configured searches. Supported incident enrichment integrations include Elasticsearch, Splunk, McAfee ESM, HPE ArcSight Logger, and QRadar. Without an available implementation, the corresponding capability action will not appear in product menus.

Connect NextGen SIEM and set its evidence options

Install the CrowdStrike NextGen SIEM integration before configuring enrichment. Prepare three connection inputs from the Falcon subscription: a region-appropriate API base URL and the OAuth client ID and secret. These are the mandatory connection fields. Optional settings use defaults if left blank. The client secret receives encrypted storage.

Open Workspaces > Threat Intelligence Security Center, then go through Integrations > Enrichment Integrations > Sighting Search. Use Configure new enrichment and choose CrowdStrike NextGen SIEM. Supply a name and description in Enrichment Integration; Integration Category, Integration type, and Vendor Name cannot be edited there.

Two address fields have different jobs. CrowdStrike API Base URL connects to the API for the Falcon cloud region. Console URL supplies the destination used by a sighting’s Falcon search link. An empty Console URL leaves the sighting without that link. Filling the console field does not replace the mandatory API connection input.

Repository defines which Falcon repositories the search covers. Repository examples include search-all, investigate_view, third-party, falcon_for_it_view, forensics_view, and 3pi_parsers. Max Result caps the returned log events. For automated runs, Default lookback period for automated runs (days) begins at 7; a search window supplied at run time takes precedence over that setting.

Evidence retention is another configuration choice. With Include raw data samples in search results selected, a sighting carries a JSON attachment containing the matched events. Without that selection, retention is limited to occurrence information and counts. After completing the settings, save the tile and use Enable to activate the configuration.

A match produces a Sighting record with associated assets in Sighting Configuration Items. ComputerName has priority as the matching input; host provides the fallback when ComputerName is unavailable. Asset association with the observable is a further action. Choose the desired CI rows and use Add As Configuration Item. The observable’s Related Configuration Items list then includes those selected assets.

For help planning this work, see ServiceNow implementation.

Search incident observables and understand the clock

From the security incident, open Show IoC and choose Observables on the Related List tab. Select the observable rows to investigate, then choose Run Sightings Search from Actions on selected rows…. The dialog allows a relative period through Last or an explicit range through between. Search starts the run with the values entered in that dialog, overriding capability configuration values for this execution.

The reference point for Last is incident creation. Its initial setting is 7 days, and the largest permitted number is 99 in either hours or days. It therefore does not describe a period counted backward from the analyst’s current time. The between option starts with boundaries at incident opening and seven days before opening. Adjust the dates to the investigation period before submitting.

Completion creates a Sightings Search record. The incident presents aggregate information in Sightings Search Results and observable-level information in Sightings Search Details. The Number field identifies the search in the results view; Sighting search identifies it in the detail view. The search identifier connects the result to its detail rows. These views answer different questions: how much was searched, what was found overall, and which observable contributed each count.

  • Observable count identifies the number of observables included in the query.
  • Internal sightings and External sightings separate the two count categories; threat sharing supplies the external category.
  • Matched configuration items reports matches against existing CMDB records for observables found in the environment.
  • Start date range and End date range show the boundaries used to look for sightings.
  • Updated records the most recent modification time.

In the detail view, each observable has its type and aggregated internal and external totals alongside the search reference and update time. For an implementation configured to retain raw data, finding at least one sighting also produces a raw-sample attachment on the sighting search record. Trusted Security Circle can receive search results, while retained raw samples are excluded from that sharing.

Vendor-specific sightings search flows

Vendor-specific flows exist for Elasticsearch, Splunk, ArcSight Logger, McAfee ESM and QRadar. Each one is launched by the Security Operations Integration – Sightings Search Flow. That shared flow uses the configured queries to search the observables through the integrations that support the capability.

The Elasticsearch flow requires the sn_si.analyst role. The Splunk and ArcSight Logger flows list the analyst role as sn_si_analyst, with an underscore where the dot appears elsewhere.

Run the case action with case permissions

Security Case Management depends on activation of the Threat Intelligence plugin. The observable search action for a case requires sn_ti.case_user_write. This case permission differs from the analyst role used by the incident procedure; access planning can start with the threat intelligence security and access design.

Find the case under All > Threat Intelligence > Case Management > All Cases. Inside it, follow Case Artifacts to the Observables tab. After selecting one or more entries, use Actions on selected items and choose Run sightings search. The Run Sighting Search dialog accepts hours, days, or a date range. Set the desired period and select Search. Each occurrence of an observable is counted as a sighting.

Apply the Microsoft Defender for Endpoint limits

The manual Microsoft Defender for Endpoint procedure lists sn_si.admin and sn_si.analyst. Supported observable types are domain names, IPv4 and IPv6 addresses, and MD5, SHA1, and SHA256 hashes. Its search history is restricted to the latest 30 days, regardless of how far back a requested range extends.

There are three range outcomes. A request wholly older than the 30-day boundary retrieves nothing. A request spanning that boundary retrieves only the portion in the latest 30 days. When the requested range lies inside that period, retrieval begins at the specified start and continues to the current time.

Open an existing security incident or create one, follow Show IoC, and open Associated Observables. Select the observables and use Run Observable Enrichment from Actions. Then select the observables under Action on selected rows and choose Run Sightings Search. Enter the time frame and submit Search. After completion, inspect Sightings Search Details, the Sighting tab, and Sightings Search Results; the Summary field provides additional information for an individual sighting.

Configure and use a Falcon Insight profile

Falcon Insight uses Sightings Search Profiles under All > CrowdStrike Falcon Insight Integration. Create a new profile with a name, the CrowdStrike Falcon Insight Sighting Search source, and the desired Active setting. Is saved search creates a saved search configuration when selected. Maximum observables per search defines the observable limit for a query.

The integration identifies Hash, IP, and URL observable types, while its sighting search supports domain names, IPv4, IPv6, MD5, SHA1, and SHA256. Search initially contains $(observable). Custom expressions must use parameters supported by the integration. Sightings Search Parameters supports more complex logic and operators, and Related Links can generate a test query after those parameters are defined. Submit saves the profile.

To reach the Falcon Insight actions, open a security incident and use Show all Related Lists at the bottom of the record. The incident workflow then depends on the selected related list. From Running Processes, select CI rows and choose Run CrowdStrike Sightings Search. Find the required profile and submit it. That CI route performs a Process Hash search only. From Associated Observables, select observable rows instead, choose Run Sightings Search, and complete the time-frame dialog.

After the Falcon Insight run, results can be checked in work notes and related lists. Sightings shows individual sighting information, and the CI preview provides additional CrowdStrike detail. Sightings Search Details and Sightings Search Results provide the corresponding detail and result views. For a structured review of search selection, periods, and returned evidence, use the threat intelligence testing and acceptance checklist.