OBLYTECH Logo
OBLYTECH Logo

Otto for CMDB: Duplicate and Stale CI Clean-Up Steps

ServiceNow Otto for CMDB adds AI-assisted tools for CMDB clean-up. Administrators can group duplicate CIs, preview a de-duplication template before running it, and process the tasks in bulk with templates. Stale CIs are checked against staleness thresholds and receive a recommended action such as rediscovery or retirement. In the Brazil release, these tasks start from the ServiceNow Otto panel.

Setting up Otto for CMDB before the first clean-up run

The ServiceNow Otto for CMDB plugin is installed from AI Admin Hub by a user with the sn_nowassist_admin.nsa_admin role. Open the Settings tab, choose Plugins, and on the ServiceNow Otto for CMDB card select Get plugins, then Install Plugin. The plugin identifier is com.snc.cmdb.gen.ai. The install continues in a new browser tab that opens the ServiceNow Store. Confirm the status reads Installed on the Installed tab.

Skills are configured afterward on the AI Skills tab: expand Technology, select CMDB, and set each skill’s properties. A skill can be switched off from its menu icon with Deactivate skill. For the wider set of CMDB guides, start at the CMDB guides hub.

Clean-up task Role that gates it
Install the ServiceNow Otto for CMDB plugin sn_nowassist_admin.nsa_admin
Enable the duplicate CI scheduled jobs admin
Run the manage duplicate CIs skill cmdb_dedup_admin and now_assist_panel_user
Start Ask Otto on the Stale CIs card a CMDB editor-level role and now_assist_panel_user
Read the readiness summary sn_cmdb_user or sn_cmdb_admin

Scheduled jobs behind the duplicate CI skill

An admin should enable three scheduled jobs. De-duplication: Populate Duplicate Task Data fills the duplicate task data. Enable the PopulateDuplicate Task Group Daily scheduled job, which provides analysis of the root cause of remediation tasks. CMDB Health Dashboard – Correctness Score Calculation makes the summary figures on that dashboard more accurate.

On a domain-separated instance, AI results draw on material inside the user’s own domain. In this setup the data resides on the instance, and the shared generative AI services do not persist prompts and responses. The data transfer described further down still applies to the application as a whole.

Finding duplicate CIs and their root causes

The Identification and Reconciliation engine (IRE) detects duplicate CIs and generates de-duplication tasks. The manage duplicate CIs skill helps with that work, starting with the causes behind the duplicates. For the wider concept, see how identification and reconciliation works.

Open the ServiceNow Otto icon in the toolbar of the Service Graph Workspace, the CMDB Workspace or any form or list view, then select Manage duplicate CIs. The user needs the cmdb_dedup_admin and now_assist_panel_user roles.

The root-cause review checks the IRE identification rules, including their criterion attributes, and the discovery sources behind the CIs. It groups the causes into suggested groups of tasks. Seeing which rule or source produces the duplicates shows where to fix the cause. The skill’s own guidance is to use this to help avoid creating further duplicate CIs.

Next, select Review existing templates. The skill previews what a template would produce without running the remediation. Name the template once the preview shows the result you want. Reset conversation deletes all messages and starts a new thread, so copy anything you need first.

Working through duplicate CIs with the CMDB Duplicate CIs Agent

The CMDB Duplicate CIs Agent is a separate agent from the stale CI one. It is part of the Feature Preview Program, so confirm it is enabled on your instance first.

On the Data Foundations advisor dashboard, reached from CMDB success advisor, find the Duplicate CIs card and select its Ask Otto action.

Templates process de-duplication tasks in bulk, so preview a template first to see what it would change, then run it on the tasks you want to process.

Working through stale CIs

What makes a CI stale

A CI is stale when its record no longer matches the asset it represents, for example a device removed from the network, taken offline or hidden from discovery. The common causes are:

  • no agreed definition of stale, and many CI classes are non-discoverable by nature;
  • discovery failures from network problems, expired credentials or configuration errors;
  • silent decommissions, where an asset leaves the network and its record is not updated;
  • unmanaged imports that are not tied to discovery or to a lifecycle status.

Thresholds and the Replacement CI Staleness Agent

Staleness thresholds are set in CI Class Manager, with defaults of 60 or 90 days without an update or rediscovery. Past the threshold, the system can trigger rediscovery or retirement through Data Manager. CMDB success advisor is the main interface for this work.

The Replacement CI Staleness Agent is a lighter, semi-interactive version of Data Manager for users who do not manage CI lifecycles in depth. For each CI class it takes settings such as the days before a fresh CI counts as stale, automated attestation when AI confidence is high, manual attestation tasks when confidence is low, and the periods between retirement, archival and deletion.

Rediscovery can run on demand or on a schedule, which helps with assets that were temporarily unreachable. Health recommendations point to discovery schedules, Service Graph Connector schedules, credential problems and configuration gaps. One staleness definition feeds the Data Health Dashboard and CMDB success advisor, so both scores follow the same rule. The CMDB Health Dashboard guide explains how to read them.

Non-discoverable CIs are marked for retirement and handled by Data Manager. Manually entered CIs are checked against events, incidents and other actions before retirement is recommended. For the sequence from a finding to a verified fix, see the CMDB remediation workflow article.

Running Ask Otto on the Stale CIs card

Open CMDB success advisor, select View insights for Data Foundations, and find the Stale CIs card. The card offers different actions depending on your access:

Your access What the Stale CIs card shows
sn_cmdb_editor, the panel user role, and the agent available Ask Otto, which opens a new conversation with the CMDB Staleness Agent
Required role missing, or agent unavailable Review policies
CMDB success advisor scope-user role Learn more

Before acting on the agent’s recommendations, check the retirement settings for the affected CI class. The health scores in CMDB success advisor follow the same staleness definition as the Data Health Dashboard, so they are driven by one rule.

Ranking the clean-up work with the readiness summary

The summarize CMDB readiness skill reads the HAM or Data Foundations advisor data and summarizes accuracy, completeness and health findings with recommended actions. It requires sn_cmdb_user or sn_cmdb_admin, but remediation links into business rules and Data Manager policies need sn_cmdb_admin.

Ranking input How it affects the order
Share of CIs or CI classes affected The main measure; severity does not set the order
Duplicate CIs and stale CIs (not updated in the last 90 days) Evaluated first, because they can inflate the counts behind other issues
Gap of more than 15 percentage points within one category Can change the default order inside that category
Gap of more than 40 percentage points across categories Can change the default order across categories

Each ranked issue maps to one primary remediation action chosen by role. If no action is open to you, none is offered for that issue.

Keeping people in the loop on AI suggestions

The application can produce inaccurate, incomplete or inappropriate output. Test it against your own cases, keep a person reviewing its suggestions, and do not rely solely on AI output for decisions, especially in consequential areas such as healthcare, finance, legal, employment, security or infrastructure. Who approves merges and retirements is a governance question too, and the CMDB governance guide covers ownership, policies and audits.

Data moves from your instance to a central ServiceNow environment, which can sit in another data center region and may use a third-party cloud provider such as Microsoft Azure. Customers can opt out of future data collection on the AI Opt-Out page. Model providers can be Now LLM Service, Azure OpenAI, Google Gemini or Anthropic Claude, and availability varies by region, SKU and restricted environment, so check your instance and release before planning around these skills.

Frequently asked questions

Can the duplicate CI agent merge records without a person approving them?

In the manage duplicate CIs skill, a CMDB administrator reviews the preview of a template and then chooses whether to proceed with it. The CMDB Duplicate CIs Agent is a Feature Preview capability, so check what it offers on your instance.

Which CIs does the readiness summary count as stale?

The summary evaluates duplicate CIs and stale CIs first, because they can inflate the counts behind other issues. In that context, a stale CI is one not updated in the last 90 days.

What happens to a CI that had recent activity?

For a manually entered or non-discovered CI, activity signals decide whether it is still in use before retirement is recommended.

Who can start Ask Otto on the Stale CIs card?

A user with a CMDB editor-level role and the now_assist_panel_user role can start it, when the CMDB Staleness Agent is available. A user with the CMDB success advisor scope-user role sees a Learn more link on the card instead.