OBLYTECH Logo
OBLYTECH Logo

Authoring Knowledge Articles in Agent Workspace, Step by Step

Agent Workspace lets an agent with the agent_workspace_user role write, edit, publish and track a knowledge article without leaving the workspace. This guide follows the path from the Agent Workspace Home page to a published article, covering the form fields, the rules that decide when an article goes live, and the review and version steps that follow.

Access and starting point

Creating or changing an article needs contribute access to the knowledge base that will hold it. Reading an article needs read access. Both tasks use the agent_workspace_user role name, so a missing control usually points to the knowledge base permissions rather than the workflow.

Start at All > Agent Workspace > Agent Workspace Home. Under Lists > Knowledge, the All Articles view covers the full library, while My Articles – Published and My Articles – Unpublished show your own work.

The Knowledge list in the workspace depends on the Agent Workspace plugin (com.glide.core-ui-components). Category creation and Wiki articles are not supported in this interface, so plan those steps on the main platform.

Creating a new article

Click New. You can start from an article template or from the default form.

With the template path, pick a knowledge base and then an article template in the Create Article dialog. The template list shows only templates configured for that base. This path needs article versioning and knowledge article templates enabled.

The Standard template shows these fields:

Field What to enter
Knowledge base The single base that stores the article
Category A category from that base
Ownership Group Shown when the ownership group property is enabled
Short description The title, up to 100 characters; similar text surfaces in Agent assist
Article body Content built in the HTML editor
Source Task Filled in when the article comes from an incident, case or submission
Scheduled publish date A future date for automatic publishing
Valid to The expiry date; expired articles drop out of search

Other fields depend on plugins and templates. The Language field needs the internationalization plugin, Confidence and Governance need the KCS capabilities plugin, and the KCS, FAQ, How To and What Is templates each add their own fields, such as Question and Answer for FAQ articles.

Attachments need one note. Attachment link downloads an attached article when a reader opens it from a search link. Most browsers download only the first attachment, so bundle several files into one archive first.

Checking for duplicates before you save

Search Lists > Knowledge > All Articles for similar titles. Then open Agent assist from the contextual side panel, choose a search resource such as Knowledge Articles, and enter the short description. The Similar Articles (ML) option needs Predictive Intelligence and a trained similarity solution. Attachments are added from the same side panel.

Saving and publishing

Click Save. The article moves to My Articles – Unpublished, and the rest of the form becomes available. What happens next depends on the workflow setting of the knowledge base:

Workflow setting Result
Instant Publish Publishes immediately, unless a schedule applies
Approval Publish Publishes when approval completes, unless a schedule applies

On an article that has an ownership group, its members can approve their own articles, unless an administrator turns off self-approval with the glide.knowman.ownership_group.enable_self_approval property. To publish, open the article from My Articles – Unpublished and click Publish. It then appears in My Articles – Published and All Articles.

Scheduling and expiry

A scheduled publish date holds a finished article until the chosen day, which suits a change that should take effect on a fixed date. Scheduling needs the Knowledge Management Advanced plugin and article versioning turned on. Valid to works the other way. Its default comes from the Article Validity value on the knowledge base, counted in days from creation. When versioning is on and a published article is edited, the count restarts from the update date, and a blank Article Validity value keeps the earlier Valid to date. On a new article with a blank Article Validity value, the default becomes January 1, 2100. On the first day of each month, authorised recipients receive an email listing articles that expire the following month, and they can extend the date. If a user preference uses the yy year format, the default date can misbehave, so switch to yyyy.

After publishing, you can request translations for any language the article does not yet have.

Editing a published article

Open the article from Lists > Knowledge > All Articles and click Edit. If versioning is enabled, click Checkout first, because only the latest version can be edited. Under versioning, the knowledge administrator, the knowledge managers and the author can edit the checked-out version. With versioning off, any user with contribute access can edit the draft.

Ownership groups change the picture after publication. The author or reviser loses contribute rights unless an administrator enables the override property. Articles that began in Microsoft Word can be edited only in Word, through Open in Word. To use the HTML editor, unlink the article from its Word document first.

Saving a versioned article raises its version by 0.01. Publishing moves it to the next whole number, so 2.02 becomes 3.0. The related lists on the Knowledge form hold the feedback, approvals, version history and mappings covered in the next section.

Related articles and affected products

Open the Related Articles list and click New. Fill in Active, choose the related knowledge article with the search icon, and set Order. Order defaults to 100, and a lower number ranks higher. Mapped articles appear in the Related Articles section of the portal view, ahead of predicted matches. Administrators decide how many related articles that section shows, so some mapped articles may not appear.

Affected products need the Knowledge Product Entitlements plugin (com.snc.kb_product_entitlements), which adds the Affected Products list. Click New there, use the search icon in the Configuration item field, select the product, and save.

Knowledge blocks and preview

A knowledge block is reusable content that several articles can share. Inserting one needs the article and the block in the same knowledge base, blocks enabled for that base, and an HTML article type. In the contextual side panel, click the add blocks icon, search for the article you need, and click Insert. If no block fits, Create New Block starts a new one. Click Update to save.

Before publishing, open the article in Edit and choose Preview with Blocks. Show Blocks highlights each inserted block so you can check placement, and OK closes the view. For background on reusable content, read the guide to knowledge blocks in ServiceNow before you start.

Reviewing, recalling and comparing versions

With approval publishing, the article waits in a Review state. The approver opens it from My Articles – Unpublished, clicks Edit, opens the request in the Approvals list by clicking its Requested state, sets State to Approved in the approval form, and saves. The article then goes live at once or on its scheduled date, its workflow state becomes Published, and the version is added to Article Versions. With versioning on, only assigned approvers can change an article in Review, so if you need edits, recall it instead.

Recall stops the approval. It needs versioning and contribute access. The author, the knowledge administrators and the system administrators can recall an article, and so can the ownership group manager and members for grouped articles. The article reopens in edit mode with a Draft state, and its version rises by 0.01. The knowledge article lifecycle guide places these steps within the wider life of an article.

To compare two versions, click Edit, select the pair in Article Versions, and click Compare. A Compare versions tab opens with the fields side by side and the differences highlighted.

Viewing an article and reading its details

Articles open from All Articles or the My Articles lists. The tab name carries the article and version numbers. The language list switches between translations, and Download as Word appears for Word-created articles when the administrator has enabled it.

The details view includes a read time, calculated at 200 words per minute, or 500 characters per minute for Chinese, Japanese and Korean. Images add time: 12 seconds for the first, 11 for the second, and so on, then 3 seconds each after the tenth. Average rating is a weighted average of 1 to 5 ratings and carries to the next version.

Frequently asked questions

Which role do I need to write an article?

You need the agent_workspace_user role and contribute access to the knowledge base that will hold the article.

Why did my article go to approval instead of publishing?

The knowledge base uses Approval Publish. The article goes live when the approval completes, unless a scheduled publish date applies.

Why can I not see the Ownership Group field?

The field appears only when the ownership group property is enabled on the instance.

What happens after an article’s Valid to date passes?

The article stops appearing in search results. Authorised recipients get a monthly reminder and can extend the date.