OBLYTECH Logo
OBLYTECH Logo

Migrating Legacy Analytics Content to Platform Analytics

Migrating legacy analytics content means moving Core UI dashboards, reports, interactive filters and Performance Analytics widgets into Platform Analytics. Dashboard content usually lands as native content. Anything without an equivalent arrives in an embedded frame called compatibility mode. Test on a non-production instance first, and users see the new content once you activate it.

What moves and where it ends up

After activation, dashboards, data visualizations, filters and KPIs all live under Platform Analytics in the Library, alongside any Core UI items not yet moved. Menu items that pointed at the old Core UI pages redirect to the migrated versions, so saved menu entries keep working. For the wider set of guides, see the reporting and dashboards guides.

One restriction matters for long migration windows. Once content has migrated, Core UI reports, Performance Analytics widgets and filters can no longer be added to Platform Analytics dashboards. Decide early when new Core UI analytics should stop being created.

Before you start: test on a non-production instance

Run the migration on a single non-production instance before production. Update sets cannot carry migrated material from non-production to production, so the tested result does not travel that way. You repeat the Migration Center process on the production instance itself.

The Migration Center exists only on upgraded instances. Net new instances do not have it, and from the Xanadu release onward they also lack the Ready to migrate column and the Switch to Next UI button. For the planning questions that come before any migration, see the migration considerations guide.

Roles decide who can do what. A full migration and its activation need the admin role. The pa_admin, report_admin and dashboard_admin roles can open the Migration Center to evaluate results. Partial dashboard migration needs dashboard_admin or higher.

Delete unused dashboards and reports before the run. To stop anyone starting or activating a migration, set the system property com.glide.par.coreui.migration.enabled to False. Set before migrating, it disables both Start Moving and Activate. Set after migrating, it disables only Activate, which suits a review period. The Migration Center’s scope is dashboards, reports, interactive filters and Performance Analytics widgets. For the table data side of a move, see moving table data rather than analytics content.

Running a full migration, step by step

The full procedure starts from All > Performance Analytics > Migration Center. Read the explanatory tabs first, because they describe what changes for users.

  1. Select Start moving. This migrates dashboards, reports, interactive filters and Performance Analytics widgets. Run time grows with the number of artifacts, so schedule large estates outside working hours.
  2. Optionally select Prevent users from creating Core UI analytics during migration. New Core UI analytics content may need to be migrated at a later time.
  3. Select Migrate and wait for the run to finish.
  4. Evaluate the results before anything goes live.
  5. Select Activate. Activation can take time on a large instance. Newly migrated content is not available in Platform Analytics experience until you select Activate.

The finished content appears under All > Platform Analytics > Library. Links to the original Core UI dashboards redirect there.

Checking results before activation

Evaluation is where much of the effort goes. The Migration Center sorts results into a Fully migrated column and lists for dashboards, visualizations, reports, Performance Analytics widgets and interactive filters. Open a list to review each category.

For any dashboard, the Compare link shows the Core UI original beside the migrated version. The Compatibility mode tab shows the content that had to be migrated as frames, and View Logs shows the issue recorded against each element. That log is usually where you find the filter or widget causing trouble.

For an audit trail, four bridge tables record what moved. Each bridge row carries a migration type: bulk for a Migration Center run, owner or list for partial migrations, or upgrade for content moved during an upgrade.

Partial migration of dashboards, reports and owned dashboards

A partial migration applies the same process to a chosen set. It suits a large estate you want to move in segments, or a trial on a few dashboards. Use the Try your content option in the Migration Center, select dashboards on the list, and choose Migrate Dashboard from the actions menu for selected rows.

Content used by one dashboard stays with that dashboard after migration. Content used by several dashboards moves into the Platform Analytics library.

The library offers a second route. Open All > Platform Analytics > Library > Dashboards and read the Ready to migrate column:

Ready to migrate value Meaning
Yes The dashboard is ready to migrate.
No Not ready. Editing a dashboard that showed Yes changes it back to No until it is reevaluated.
Already migrated An active Next Experience version already exists.
Not applicable Built natively in Next Experience, with no Core UI version.

Select the dashboards marked Yes, choose Switch to Next UI, and confirm the count. The Migration Center then opens for comparison and logs, and Activate selected finishes the job. Afterwards the Core UI versions show Active=False.

Reports follow their own route. From the reports list, select the reports and choose Migrate Report. Migrated results appear in the Platform Analytics Data Visualization library, and the original stays labelled Active=False. For building charts in that library, see the Platform Analytics data visualizations guide. Reports do not redirect the way dashboards do, because a dashboard still using a Core UI report needs the original for editing.

Non-admin owners can migrate a dashboard they own directly from the dashboard. Open it from the library, choose one showing Core UI in the UI version column, and select Switch to Next Experience UI. The migrated version replaces the Core UI one in the browser and the library. Dashboards with custom or dynamic content blocks, and dashboards using widgets that are not base-system Performance Analytics widgets (CMDB widgets are the example given), do not show the migration banner.

What does not carry over

Most dashboard content migrates. The items below do not, so each needs a decision before activation.

Content Result
Widget title alignment Not migrated.
Dashboards with dynamic content blocks Not migrated. The Core UI version stays in the library.
Debug filter, filter user preferences, filtered list content Not migrated.
Cascading filters using Choice to Choice Not migrated.
Restriction of dashboard access to specific roles Not migrated. Reapply access in the new library.
Group edit rights on a report Groups keep view rights only. Share the migrated visualization again.
Show Distribution and Show Bullet chart on indicator and breakdown scorecards Not migrated.
Calendar year view component Not migrated.
Breakdown source dropdowns Migrated, but each breakdown becomes one filter pill.
Header and color settings on shared visualizations In a bulk run, visualizations used in one or more dashboards lose them.

The header and color row needs a closer look. Core UI sets those per dashboard, while Platform Analytics sets them per visualization. In a partial migration, a visualization used by one dashboard keeps its settings. Once several dashboards share it, the settings are lost and must be reapplied. A bulk run loses them in either case.

Compatibility mode and rollback

Compatibility mode is the fallback for content with no native equivalent. The original artifacts are embedded as frames in the migrated dashboard and are neither changed nor moved. Any dashboard holding something other than a Performance Analytics widget, report or interactive filter goes this way. The examples given are custom interactive filters, custom content blocks, gauges and gadgets. Dashboards in compatibility mode can have performance issues, so review that tab first after activation.

Smaller configurations also move into compatibility mode. Examples include sorting by dot-walked fields, breakdowns based on choice fields, and reports of the Control, Trendbox, Histogram, Funnel and Pyramid types. List scorecards using Show Key indicators or the Best Performing and Worst Performing filters follow the same path.

Rollback returns a migrated dashboard to Core UI format, with its content brought back as frames. It suits dashboards built on custom charts, custom content blocks or custom interactive filters. Analytics managers and admins can roll back any migrated dashboard from its More actions menu, and dashboard owners can roll back only dashboards they migrated themselves. The rollback step requires the dashboard_admin role. UI Builder dashboards, shown as Advanced Dashboards, cannot be rolled back. For how the underlying dashboard model works, see how a dashboard is built.

Dashboards left unopened, and re-running the migration

Non-responsive dashboards that have not been opened can migrate with empty tabs, because the canvas page the Migration Center looks for is created only on first open. Open each affected dashboard in Core UI, then run the full migration again. This also affects solutions dashboards.

Re-migrating a changed Core UI dashboard overwrites its earlier migrated copy. A full re-run also overwrites changes made to a migrated report’s Platform Analytics visualization, while a partial dashboard migration leaves changed reports alone.

Is Platform Analytics migration mandatory in the Australia release?

No. Migrating existing analytics content is optional in the Australia release. As of November 2026, Platform Analytics is enabled by default when an instance upgrades, so the new experience is available without any migration step. You choose when to move existing dashboards, reports, filters and widgets; the release does not force that step.

Three questions get called one question

Release discussions merge three separate questions. Keep them apart, because each has a different answer.

  • Default-on: Platform Analytics is active after the upgrade. It is a platform setting and moves no content.
  • Creation: whether new work is built in Core UI or Platform Analytics. You set that policy. Core UI content created during a long migration window may still need moving later.
  • Migration of existing content: moving what already exists. This is the optional part, and it starts only when someone selects Start moving.

What optional means for content you leave behind

Leaving a dashboard in Core UI is legitimate, with one catch. The catch sits with reports, which keep their original Core UI object in place for edits. Record which content stays and why, so the decision is not reopened each time someone asks for a change.

A decision sequence for your estate

  1. Inventory Core UI dashboards, reports, filters and widgets, noting which dashboards share each one. Shared items are handled differently in the move, so this count matters.
  2. Weed out unused content early, since each unused item still needs a migrate-or-skip decision.
  3. Sort the rest into content that migrates cleanly, content that lands in compatibility mode, and content that does not carry over.
  4. Set a cut-off date for new Core UI analytics before the run starts.
  5. Prove the run on a non-production instance, then treat production as a separate run.
  6. Record each exception, its reviewer and the review date.

Get the answer in writing and keep the end-of-life upgrade separate

Ask your ServiceNow account team to confirm in writing whether Platform Analytics is enabled on your production instance, whether any Core UI migration is tied to your upgrade or subscription terms, and whether your entitlement covers the features you plan to use. As of November 2026, the end-of-life program makes upgrades mandatory for unsupported release families, on customer-specific schedules with advance notices. That is a different obligation from the reporting migration. If someone calls the analytics migration required, ask which requirement they mean and where it appears in your upgrade plan.

Do not read default-on as content moved

Enabled by default describes the platform, not your dashboards. Existing content keeps its current form until you run the migration and select Activate. Teams that skip this distinction often announce a cutover that has not happened.

Frequently asked questions

Do I have to migrate all dashboards at once?

No. A partial migration handles a chosen set, and the Ready to migrate column shows which dashboards are ready. Moving in segments also lets you check results before committing the whole estate.

Can I move migrated dashboards to production with an update set?

No. Update sets cannot carry migrated material from a non-production instance to production. Test on the non-production instance, then run the Migration Center on production.

Can a migrated dashboard go back to the old format?

Yes, through rollback. The dashboard returns to Core UI format with its content in frames. UI Builder dashboards cannot be rolled back.

Why did a shared visualization lose its header and colors?

In a bulk run, a visualization used in one or more dashboards loses those settings. Core UI set them per dashboard, while Platform Analytics sets them per visualization, so reapply them on the visualization.