OBLYTECH Logo
OBLYTECH Logo

Alert Impact Calculation and Services in Event Management

Alert impact calculation estimates how much an outage on one configuration item (CI) reaches the application services built on it. Event Management uses impact rules, CI relationships and maintenance state to set the severity of each alert, and that severity shows on impact trees, service maps and dashboards.

What the calculation weighs

Four kinds of input shape the severity of an alert:

  • The impact rules configured for the CIs involved.
  • The number of related active alerts.
  • The past history of the affected CI.
  • The relationships between CIs inside an application service.

When the failing element is a network or storage device, its path also feeds the result.

Impact is scored on a fixed scale: 100% down, 60% affected, 40% impaired or 20% impaired. When items in two or more clusters are affected, the impact rises to 100% down.

Which application services enter the calculation

Impact calculation applies to Service Instance services, stored in the cmdb_ci_service_auto class and any class that extends it. Technology Management Service records (cmdb_ci_service_technical) and Business Service records (cmdb_ci_service_business) are not calculated. A team that models a business capability as a business service should trace an outage down to the Service Instance layer underneath it. For the broader CMDB view of this, see CMDB service impact analysis.

By default, impact is calculated for all operational application services. Two lists narrow or widen that set. The inclusion list decides whether all services of a CMDB class are considered, and the filter list decides whether an individual service is considered.

Adding or removing a CMDB class

Open em_impact_inclusion_class.list from the all-applications search. Select New, choose a value in the Table field and submit. The dropdown lists the CMDB tables that the calculation supports. Once a class is listed, all application services related to it are considered, and a single class can bring in a large number of services. To stop a class contributing, select its row, open the actions on selected rows menu, choose Delete and confirm.

Including or excluding individual services

Individual services are managed in em_impact_filter_service.list, labelled Impact Filter Services. Two situations come up:

  • The class is on the inclusion list, but one service should not count. Set Calculate impact to false on that service’s record.
  • The class is not on the inclusion list, but one service should count. Add the service with Calculate impact set to true.

Deleting the record is not a dependable exclusion while the class stays on the inclusion list, because the class brings the service back in. The flag is the reliable control. Services on the filter list are the ones that appear on the Service Dashboard, so filter changes affect the dashboard as well as the severity figures.

How the service map is assembled

Event Management builds the map from the Service Configuration Item Associations table (svc_ci_assoc) and the CI Relationships table (cmdb_rel_ci). Associations record which CIs are assigned to a service, and relationships record how CIs depend on one another. If a CMDB path exists, the map keeps the CI hierarchy as the CMDB records it. If no path exists but an association does, a Depends-on link is drawn. With neither, no connection appears. The assignments are visible in the Service Configuration Item Associations section of the Application service form, which is the place to check when a map looks flatter than expected.

Network, storage and related CIs

Network redundancy has its own calculation, built from the Network Paths table (sa_network_paths) and the Infra Path To Elements table (sa_infra_path_assoc). The application CI becomes the parent and each path element a child, linked by a Depends on::Used by relationship. Each regular element passes its own severity up to its ancestors. Redundant elements follow the redundancy rule, which lowers severity by one level, so a Critical severity on a redundant element is carried into the calculation as Major. Storage paths use the same pattern, with the storage device definition drawn from the sa_fs_to_storage_path table.

Some outages reach CIs outside the service, such as a host the service relies on that is not a discovered member. Event Management reads the Infrastructure Relations table (em_impact_infra_rel_def), adds the related CI to the impact tree and the alert list, and shows a containment link to the host.

Impact rules and cluster behaviour

Impact rules are stored in the Impact Rule table (em_impact_rule). The defaults are:

Rule What it governs
Application Cluster Member How each member influences its cluster
Inclusion Impact on entities joined by a Contains relationship; read-only
Infrastructure Dependencies Propagation for CIs linked by infrastructure relationships
CI application service Impact between parent and child entities inside an application service
CI Impact Impact from child to parent, 100% by default, with an Influence value an operator can lower
CI Parent in Application Sets impact on the parent entity alone
Network Path Impact along a traditional network path
OS Cluster Member How host cluster members determine the cluster status
Storage Path Impact along a storage network path

Under the CI Impact rule, the parent takes the severity of its highest-severity child, so one critical child can make the whole service look critical.

Cluster arithmetic is straightforward. In a three-member cluster that needs 90% influence to set the cluster to Major, each member carries 30%, and the cluster moves to Major when all three members are Major. In a three-host cluster needing 60% influence, each host carries 20%, and the cluster moves to Major when two or more members are Major.

Manual clusters let you group CIs yourself and set the rule at cluster level, so one child can affect two parents differently. The Influence value on the Application Cluster Member row sets how many failing children must propagate upward.

Maintenance windows and change requests

Alerts on CIs in maintenance are excluded from the calculation. A CI counts as in maintenance when an active change request is scheduled for it, or when its Status field is In Maintenance. A child placed in maintenance also places its parent in maintenance. The Alerts tab then hides the affected alerts, and the impact tree draws the CI in green with the note (In Maintenance). The property evt_mgmt.impact_maintenance.sleep_time_sec sets the minimum number of seconds between checks of a CI’s maintenance status.

Timing properties for incoming alerts

The property evt_mgmt.impact_calculation.alert_copy_delay defaults to 2000 milliseconds. It pauses the calculation after an alert is created or updated, which compensates for late arrivals and slow business rules on the em_alert table. It applies when alerts are processed one at a time. Batch processing uses evt_mgmt.impact_calculation.alert_copy_delay_when_alerts_are_processed_in_batch_msec, which defaults to 30000 milliseconds.

Reading impact on a service map

Open Event Management, then Services, then Application Services, and select View Map beside the service. Click a CI tile to reach the tabs below the map. The Alerts tab lists alerts on that CI by type and severity, and the Affected CIs tab shows which CIs an alert is bound to. The Impact tab lists the rules behind a CI’s severity, which is where to look when a parent has taken a given colour.

On a map, a child service passes its severity up to its parent. Viewing alert impact on CIs needs evt_mgmt_admin, evt_mgmt_operator or evt_mgmt_user.

Adjusting impact while triaging an alert

Sometimes the calculated impact does not match the environment, and an operator can adjust it. Check the assumption before editing: confirm how the services and CIs really behave, and where the answer is unclear, run a network test or ask whoever runs that infrastructure. A change made on assumption can make a real problem look resolved on the dashboard.

Consider a hypothetical checkout service that depends on a primary and a standby database host. The primary carries a critical alert, but the standby can serve everything the checkout flow needs. Under the default CI Impact rule, the primary’s critical impact passes up at 100% influence, so the checkout service shows red. An operator who has confirmed that the standby really does cover the load can open the service map from the Service Operations Workspace, which is the route for new customers, and lower the Influence value on the primary’s row. Changing the Critical column then turns the inherited critical impact into non-impact (green). The service turns green, while the critical alert stays in the Alerts list. The problem still needs resolving, but the service is no longer reported as down. For more on common Event Management mistakes, see Common ServiceNow Event Management Mistakes and How to Avoid Them.

Frequently asked questions

Does removing a service from the list stop it being counted?

Not reliably. If its CMDB class is still on the inclusion list, the service is still calculated. Set its Calculate impact flag to false to exclude it.

Why does a parent turn red when a single child is critical?

Under the default CI Impact rule, the parent takes the severity of its highest-severity child at 100% influence. Lowering the Influence value on that rule changes the result.

Are alerts on a CI in maintenance counted?

No. Alerts on CIs in maintenance are excluded, and a CI counts as in maintenance when a change request is scheduled for it or its Status is In Maintenance.