OBLYTECH Logo
OBLYTECH Logo

Alert Groups in the Express List: Handling and Review

Alert groups in the Express List gather related alerts under one primary alert, so you triage a problem once, not event by event. For the full set of event management topics, start at the event management overview. From this list you can assign, acknowledge, close, mute, or remove secondary alerts from a group, and follow a group’s development through its timeline and link view. Your Event Management role sets which actions you can take. Operators (evt_mgmt_operator) and administrators (evt_mgmt_admin) can change alerts, and the evt_mgmt_user role is view-only. For the wider roles picture, see event management roles and responsibilities.

The grouping method explains why alerts were tied together

Alert groups form from alert rules, shared tags or CMDB proximity, and the method behind a group tells you what links its alerts. Read the link view before you act, since a group built from shared tags and one built from CMDB proximity offer different evidence about a shared cause. For the rule side of rules-based groups, see how correlation rules build alert groups. Where alerts first enter the system, see ServiceNow event rules.

One primary alert leads each group

A group has one primary alert at its head, and the remaining members are secondary. To add an ungrouped alert to an existing group, an administrator sets the alert’s Parent field to the primary alert from the alert record under All > Event Management > All Alerts, which makes it a secondary alert of that parent.

Severity and priority answer different questions

Severity describes the condition, from Critical down through Major, Minor and Warning to OK. Priority answers a different question: what to look at first. The system calculates it for each open alert from inputs such as alert state and business criticality, as a composite score that ranks alerts for handling.

Acting on alerts from the Express List

Handling runs through the Close drop-down list at the top right of the Active alerts list. Each action applies to the rows you select, and Select All lets you act on up to 1,000 alerts in one step. The same actions appear in the preview panel, which opens when a single alert or a single group is selected.

Assigning alerts to a person or a group

Select the alerts, open the Close drop-down list and choose Assign to. You can assign to yourself, to a named person or to an assignment group. For a person or group, pick the individual from the Assigned to field, add work notes if they help the next owner, and confirm.

Closing and acknowledging alerts

Close an alert when you know its root cause or have fixed the problem. Choose Close alert from the drop-down, or from the more actions icon on an alert tile in the preview panel.

Acknowledge, the bulk action, is for alerts you have seen and can set aside for now; assign an alert that still needs work. Use it once you have seen an alert and it can be set aside for now, which clears clutter from the list. Assign any alert that still needs work.

Muting alerts while a CI changes

When you replace or upgrade a configuration item, its alerts can fire mid-task. Select the alert rows and choose Put in Maintenance from the Close drop-down list to mute them. For the wider picture of how alert management rules are configured, see alert management rules. The action sets no timeframe. An alert’s maintenance status follows the CI, which counts as in maintenance during an active change request or under a maintenance rule, and the Maintenance Calculation scheduled job updates alerts as the CI enters or leaves maintenance.

Removing secondary alerts from a group

If a secondary alert does not belong with its group, expand the group with the chevron icon, select the alert and choose Remove from group. In the preview panel, use the Alerts in group tab and the more actions icon on the alert tile. Removing the last secondary alert dissolves the group, and a message offers an undo.

Reading how a group developed

The timeline shows when each alert arrived and changed

Timeline view turns a group into a sequence. If a view does not match what you expect, see troubleshooting ServiceNow Event Management. Each alert becomes a bar, and the timeline starts at the moment the first alert was created and runs to the present. Bars take the standard severity colours, so a bar that shifts colour shows a severity change at a glance. Grey segments mark the time before an alert existed and after it closed, and hovering over a bar shows its key details. To open it, select the information icon beside an alert, then choose Timeline view on the Alerts tab of the preview panel. Closed alerts are hidden by default, and the Hide closed alerts slider brings them back.

Link View shows why the alerts were grouped

Link View draws the alerts in a group as a network of nodes, where each coloured tag stands for a CI or another environment item tied to the alerts. It works without a populated CMDB. When the CMDB is populated, it also shows the probable cause and the service the group affects.

A solid line means the nodes share one or more alerts, while a dashed or dotted line means the grouping criteria correlated them. A stacked node means several nodes map to one tag, and a number badge counts the alerts carrying the same key-value pair. A Change badge marks an active change request as a probable cause. Link View does not update on its own. Drag nodes to focus on one area, then select Refresh once new data arrives. Refreshing returns the nodes to their original positions.

The shape of the view depends on how the group formed:

Group type What to look for
Rules-based The primary alert is the Home node, with secondaries attached by dashed lines
Tag-based The defining tag is marked Correlation; a dashed line marks a close but inexact match
CMDB-based CIs sit near each other in the service map, with up to three CIs between them
Mixed Tag cluster and CMDB groups shown alongside related log entities and shared services

Narrowing the list to the alerts that matter

Filters and alert tags

The Filters pane narrows the list by string, number and date attributes, with a count beside each value. For the wider workspace these filters sit in, see Service Operations Workspace alert exploration. State, Priority, CI and Impacted services are typical starting filters. For compound logic, turn on Use advanced filters and combine conditions with AND and OR. Alert tags add another grouping method, set through the Edit filter attributes icon on the Alert tags tab.

Searching the list by text

The search field looks through the alerts already in your filtered list, so set filters and the time range first. It checks Metric name, Node, Alert number, Alert Tags and Description. Enter one string of up to 50 characters, which is not case-sensitive. A minimum length applies, set by the evt_mgmt.express_list.min_search_chars property. Essential mode searches primary and single alerts, while Extended mode also includes secondary alerts, which matters when the match sits inside a group.

Highlighting alerts by condition

Colour can flag the rows that deserve a second look, but a list painted in many shades stops guiding anyone, so keep the conditions few. The feature ships switched off. An administrator with the evt_mgmt_admin role enables the sn_sow_exp_app.express_list_conditional_highlighting system property, then creates highlighted value conditions for the Alert table. Each condition sets its filter, colour, evaluation order and an optional icon. The SOW Highlighted Value Config collection then has to be added to the UX Highlighted Values Configurations list before the highlights appear.

Checking the detail behind an alert

Select an alert number and it opens in its own tab on the Overview tab. The Summary explains why the alert counts as an issue. The Impact section lists the affected CI and services, through Application services and Related service offerings subtabs, which relate to each other many to many. The Cause section lists contributing log properties and probable root causes.

Frequently asked questions

Which roles can change alerts in the Express List?

Operators (evt_mgmt_operator) and administrators (evt_mgmt_admin) can assign, acknowledge, close and mute alerts, and remove secondary alerts from a group. The evt_mgmt_user role is view-only.

How many alerts can you handle in one action?

Select All in the Active alerts list applies assign, acknowledge, close or mute to up to 1,000 alerts at a time.

When should you acknowledge an alert instead of closing it?

Close an alert when you know the root cause or have fixed the problem. Acknowledge it when you have seen it and it can be set aside for now. Acknowledge (the bulk action) is for alerts you have seen and can set aside for now, so it does not mark an alert as needing work; assign an alert that still needs work. A separate Acknowledged state, set from an alert’s Details tab by an administrator, does mark an alert as having issues to address.

Why does Link View look out of date?

Link View is not refreshed automatically. When new data arrives for the group, the Refresh button becomes available. Refreshing returns rearranged nodes to their original positions.

What happens if you remove the last secondary alert from a group?

The group dissolves and the alert becomes ungrouped. A message offers an undo, so you can restore the group if the removal was a mistake.