OBLYTECH Logo
OBLYTECH Logo

Omnichannel Callback in Customer Service: Setup and Scheduling

Omnichannel Callback for Customer Service Management (installed as the sn_callback application) lets a customer request a return call instead of waiting in a queue, and lets agents book callbacks on a customer’s behalf. Setup runs in four stages: install the application, tune the callback properties, publish the Virtual Agent topics, and configure the callback form in Engagement Messenger.

How the callback flow reaches the customer

A customer sees the callback option when the estimated wait for a live agent is too long or when agents are unavailable. They give their name, contact details and the reason for the call, then ask for a callback straight away or pick a date and time.

An immediate request shows the customer the average time an agent takes to call back, which gives them a reason to leave the queue. A scheduled request sends the customer a confirmation email for it.

Callback can be requested from a Virtual Agent chat, from Engagement Messenger, or from the Customer Service Portal. Phone callbacks can be immediate or scheduled. Video callbacks on Zoom must be scheduled.

Once the request is in, the work moves through a fixed sequence:

Step What happens
Availability check The callback is routed to an available agent.
Notification The agent receives a callback notification in the workspace inbox.
Context review The agent can review the Virtual Agent conversation, knowledge base article views and searches before dialing.
Call and follow-up If the customer answers, the interaction completes when the call ends. If not, the agent can retry later, close the interaction, or queue the callback again manually.

Installing the application

Installation requires the admin role. Confirm that the application and its ServiceNow Store dependencies have valid entitlements. Then go to All > System Applications > All Available Applications, search for sn_callback by name or ID, choose a version and select Install. Read the Store listing first for dependencies, licensing and release compatibility.

The review dialog lists any dependencies that install alongside the application, and links to the Store if one needs its own entitlement. Demo data is optional and suits a development or test instance.

Installation adds plugins, Store applications and a scheduled job called Send reminder for scheduled Callback tasks.

Setting the callback behavior

Callback behavior is controlled by system properties. Open the system properties list, search the name field for sn_callback and edit the values there. These four properties shape the experience directly:

Property Default What it controls
sn_callback.callback_expire_time 60 Minutes before an open callback task is closed because it timed out.
sn_callback.callback_max_retry_attempts 5 Retry attempts allowed before the callback task is closed.
sn_callback.enable_scheduled_callback true Lets customers pick a time slot for their callback.
sn_callback.enable_agent_scheduled_callback Check on your instance Lets agents schedule callbacks on behalf of customers from the CSM/FSM Configurable Workspace.

Expiry and retry both close a task, so set them together rather than one in isolation. A short expiry window suits a team that wants fast turnaround, while a longer one gives the customer more time to be reached.

Configuration breaks into four tasks, and they run in this order: install the callback application, configure the callback behavior, publish the Virtual Agent callback topics so the option appears to customers on chat clients, and configure the callback feature form in Engagement Messenger. Publishing the Virtual Agent topics is the step to check before the callback option appears to chat customers. Until it is done, the option stays hidden from chat customers even though the application is installed.

Scheduling callbacks for customers

When scheduled callbacks are enabled, the customer picks a date and time on the request form and receives an email confirming it. To move the booking, the customer opens the request from a list and picks a new date and time from the calendar. To cancel, the customer uses the self-service channel where the request was made. None of these steps needs an agent.

Setting up agent-scheduled callbacks

Agents can book a callback while working a case or an active interaction. The booking can come from a chat, voice, email or messaging interaction, or directly from a case record. This suits a customer who asks for a call at a set time, or an agent who needs more information before a follow-up call is worth making.

Check these prerequisites before agents start:

  • The Customer Service Management plugin (com.sn_customerservice) is activated.
  • The Omnichannel Callback for Customer Service Management plugin is installed.
  • The Appointment booking plugin (com.snc.appointment_booking) is installed. It arrives automatically with the callback application.
  • The property sn_callback.enable_agent_scheduled_callback is enabled.
  • The user holds the sn_omni_callback.callback_writer role.

With those in place, open the CSM/FSM Configurable Workspace and select the List icon. Open the case, which must be in the Open state, or the interaction, which must be in the WIP state. Select Schedule Callback, complete the scheduling widget and select Schedule.

The widget asks for the customer’s callback number, preferred date and time, reason for the call and a short description. The widget displays the customer’s time zone. When the booking is made from a case, the callback context shows the case number, so the agent taking the call sees where the conversation began.

A confirmation message appears with a link to the callback record. The task starts in the Open state and stays linked to the case or interaction it came from. A minute before the scheduled time, the system creates a callback interaction and routes it to an agent.

Viewing, rescheduling and canceling scheduled callbacks

Viewing scheduled callbacks

Viewing needs the sn_customerservice_agent role. Open the CSM/FSM Configurable Workspace, select the List icon, go to the Callbacks section and choose Scheduled callbacks. The list shows the callback task number, the contact or consumer name, the callback number, the scheduled start time and the reason for the call. It covers scheduled callbacks in the Open state.

Rescheduling a callback

Rescheduling needs the sn_omni_callback.callback_writer role and applies to scheduled callbacks. Open the task from the list or from its tile in the contextual side panel, then select Reschedule. Review the current date, time and customer time zone, pick a new slot on the calendar and select Reschedule. The task keeps its Open state with the new schedule.

Canceling a callback

Canceling also needs the callback writer role. Start the cancellation on the task, then select Yes in the confirmation modal. The state changes to Canceled, and a confirmation message appears. Use it when the customer no longer needs the call, or when the issue has been resolved another way.

If the Reschedule button is missing, check the task type, because it appears for scheduled callbacks and not for immediate ones. If the Cancel button is missing, check the role. For a wider set of fixes, see the troubleshooting guide for Customer Service Management.

Connecting contact center callbacks through ICC

Teams that route voice through a contact center platform can handle callbacks with the Interaction Controls Component (ICC). The platform keeps the caller’s place in line, and the agent workspace shows the callback itself. This path runs alongside the Virtual Agent and portal callbacks described earlier. For background on telephony work around this, see the computer telephony integration page.

There are two routing modes. In customer-first mode, the platform dials the customer and connects an agent once the customer answers. In agent-first mode, the agent accepts the callback first, previews the context card and then dials, either manually or automatically, depending on how the contact center is configured.

The Callback actions component gives the agent call, redial, choose-another-number, close and transfer controls. Transfer moves an immediate or scheduled callback to another queue or agent before the customer call begins. With automatic dial, the call is placed when the countdown reaches zero, and the agent can press Call number first. Global Voice Control offers the same actions from other pages, but transfer is not supported there.

Installing this path needs the Interaction Controls Component (sn_int_control), Appointment Booking for callback integrations, the Omnichannel Callback application, the External Routing Support plugin and Advanced Work Assignment. The contact center provider must integrate with the platform and have its plugin certified before it appears in the Store, so confirm provider readiness before planning the timeline.

Frequently asked questions

Do customers need a contact center integration to request a callback?

No. Callbacks work from Virtual Agent, Engagement Messenger and the Customer Service Portal once the application is installed and configured. The ICC route is for voice callbacks handled through a contact center platform.

What happens if the customer does not answer an immediate callback?

The agent can retry. The retry limit is set by sn_callback.callback_max_retry_attempts, which defaults to 5. The task also closes when sn_callback.callback_expire_time, which defaults to 60 minutes, runs out. The agent can close the interaction or queue the callback again.

Can an agent book a callback from a case?

Yes. Open the case in the Open state, select Schedule Callback and enter the callback number, date, time, reason and description. The task links to the case, so the case number appears in its context.

Which roles can change a scheduled callback?

Rescheduling and canceling need the sn_omni_callback.callback_writer role. Viewing the scheduled callbacks list is covered by the sn_customerservice_agent role. For how these roles usually fit into a wider team, see the roles and RACI guide.

Why does a booked callback not appear in the scheduled list?

The list shows scheduled callbacks in the Open state. A callback that has been cancelled or moved to another state drops off the list. Open the task record to check its current state.

Is the callback option visible straight after installation?

No. Publish the Virtual Agent callback topics and configure the callback feature form in Engagement Messenger first. Installation alone does not expose the option to customers.