Administering Now Assist on a ServiceNow instance centers on one console: AI Admin Hub in the Australia and Yokohama releases, and the Now Assist Admin console in Xanadu. From there you install plugins, activate and customize skills, set account and data-sharing options, and review skill usage. Assist consumption against your entitlements sits in Subscription Management.
The console name and menu labels change between releases
The generative AI features and the console that manages them have been renamed across releases, so a label you read in one set of notes may differ on your instance.
| Release | Console name | Skills page name | Family name in topics |
|---|---|---|---|
| Xanadu | Now Assist Admin console | Now Assist Admin Features page | Now Assist |
| Yokohama | AI Admin Hub console | Now Assist Skills page | Now Assist |
| Australia | AI Admin Hub | AI Skills tab | ServiceNow Otto |
Australia topics still say Now Assist in places, so both names can appear inside one release. From the Brazil release, AI Admin Hub is being prepared for deprecation and replacement by AI Admin Center.
Five steps to set up the console
The Overview tab in the Australia release lays out a five step path. For outside help with setup, see the Now Assist virtual agent and self-service page.
- Install plugins. Open the Settings tab, go to the Plugins page, and review the Available for you tab. Each plugin contains skills, and you install the plugins that match your business needs.
- Turn on the panel, if you want it. The ServiceNow Otto panel is switched on from the AI Experiences tab. In Yokohama the step sits on the Now Assist Experiences page. The panel is a conversational interface for AI skills, and skills can still display in product without it.
- Activate skills. The AI Skills tab lists the skills your installed plugins provide. Some skills need configuration, such as choosing inputs and triggers. ITSM-specific detail is in the step-by-step ITSM skill guide.
- Review account settings. The Settings tab holds language support, which applies when Dynamic Translation is enabled, along with account details and data-sharing status.
- Monitor skill performance on the Overview page.
Choosing where a skill appears and who can use it
When you activate a skill, you choose where its output shows. In-product placement puts the skill on forms and in workspaces in the Core UI. The panel option places it in the ServiceNow Otto panel in Australia, or in the Now Assist panel in Yokohama and Xanadu. You can select either location or both. If the panel option is missing, activate the panel first.
For each location you name the roles that can use the skill. Type a role name in the User roles field and remove one with the X on its bubble. The setup requires at least one role, so decide who should see a skill before you activate it.
To change an active skill, edit it in AI Admin Hub, or make a copy so the original configuration stays as it is. Make a copy creates a second version to experiment with while the original stays in place.
Customizing record summarization on a copy
Input data and prompt output change on a copy of a record summarization skill, so start by making a copy. Making and configuring a copy requires the Now Assist admin role (sn_nowassist_admin.nsa_admin). Work through these stages. For custom skills beyond the built-in ones, see the AI skill kit guide.
- Name the copy. The default name adds “(copy)” to the original, such as Case summarization (copy).
- Choose input fields for each input template. Three templates ship by default: new records, records in progress, and closed records. Each base input field needs a description for the language model.
- Set rule conditions. A template applies to records that match its conditions.
- Add related data sources if needed. A related table takes its own input fields and an optional filter condition. Email is available as an activity source, which has no input fields to configure.
- Arrange prompt output sections. Move sections from the available list to the final list and drag them into order. Locked sections must stay in the summary.
- Run a test. Select a record and choose Run Test. After a test run, check your Now Assist usage in the Subscription Management dashboard.
- Set availability. Choose “Skill is always available”, or use the condition builder to limit the skill, for example to certain assignment groups.
- Choose display locations and roles, then review and activate.
Monitoring skill usage on the Overview page
The plugin status pie chart compares installed plugins with available ones. The skills status donut sorts skills into active, inactive, draft and not configured. The skills usage section shows actions, average unique users per day and actions over time for active skills, and you can filter by skill or date range.
Usage data is collected once a day through Performance Analytics and Reporting in the Australia release. Usage alerts, configured under Settings in Australia, define threshold rules at the skill level for assist consumption and skill execution counts. For the wider view of AI oversight, see AI Control Tower home and insights.
| View | Where to find it | What it shows |
|---|---|---|
| Skills usage cards | AI Admin Hub Overview page | Actions, unique users per day and actions over time, per skill |
| Now Assist usage | Admin, Subscription Management, Subscriptions, Now Assist usage | Assists consumed against entitlements, by instance, skill and domain |
| Usage alerts | AI Admin Hub Settings (Australia) | Threshold alerts on assist consumption and execution counts |
| Gen AI Usage Log | sys_gen_ai_usage_log list (Australia) | Each use of an AI capability, with its assist count and execution type |
Reading assists in Subscription Management
Subscription Management, reached from Admin in the Australia release, measures assist consumption against what you have purchased. The usage_admin, sn_sub_man.admin or admin role is needed to view or edit it. Open Admin, then Subscription Management, Subscriptions, and Now Assist usage.
The summary compares purchased entitlements with assists used across your instances, and a consumption-over-time view shows whether usage passed the purchased count in the current contract period. Demo-instance assists are excluded. The Instances list covers instances on Washington DC Patch 2 and later, and an instance whose data sharing is restricted stays hidden until its trust configuration changes.
The per-skill table refreshes nightly. Total assists equals Number of actions multiplied by the Assist ratio. Moveworks skills carry an MW prefix. The Utilization history chart filters by month or day, and steady month-on-month growth is a signal to plan for more entitlements. The Domain list appears when domain separation is enabled. For the wider view, see the Subscription Management dashboard guide.
For record-level detail, enter sys_gen_ai_usage_log.list in the navigation filter. Each record shows an assist count, the feature behind it, a status of Completed or Pending, and an execution type of Test, Evaluation or Auto Prompt Tuning.
Generative AI Controller, logs and data sharing
The Generative AI Controller sits between your Now Assist applications and any third-party large language model. Each request passes through it, where logging, rate limiting, data privacy masking and guardrails apply. In the Australia release it installs automatically with any ServiceNow AI application and requires Vancouver patch 2 or later. Check which external providers your release supports before you plan a connection. Provider setup is covered in the Gen AI Controller guide.
The Generative AI Log table, sys_generative_ai_log, keeps prompts, responses and edited responses for 180 days in the Australia release. HR-related entries are restricted to HR administrators.
Yokohama adds a data steward role, and Data Privacy policies that anonymize email addresses and phone numbers are managed from the Settings tab. A custom LLM provider is set up in the Generative AI Model Configuration table, sys_generative_ai_model_config.
In the Australia release, data moves from your instance to a centralized ServiceNow environment, which may sit in another data center region and may pass to a third-party cloud provider. Customers can opt out of future data collection at any time.
Domain separation for the AI Admin Hub console is supported at a basic level in the Australia release. In a domain-separated instance, a summarization skill only uses records within the user’s domain. Subscription Management shows Now Assist usage by domain when domain separation is enabled. For the wider concept, see domain separation.
Roles that control console access
The base admin role does not grant these roles automatically, so assign them directly.
| Role | What it allows | Roles it contains (Australia) |
|---|---|---|
| Now Assist Admin | Create and update the experience by editing and configuring skills | agent_role_config_admin, pa_viewer, sn_ace.ace_user, sn_na_analytics.admin, ui_action_admin |
| AI Admin Hub console user, sn_nowassist_admin.user | View skills and configurations without making changes | agent_role_config_viewer, pa_viewer, sn_ace.ace_user |
| ServiceNow Otto panel user, now_assist_panel_user | Access the ServiceNow Otto panel | sn_dyn_guidance_user |
In Xanadu, the Now Assist Admin role contained just the ACE user role.
What changes for Now Assist administrators in the Brazil release, and what should we check before upgrading?
As of November 2026, the Brazil release is introducing AI Admin Center to replace AI Admin Hub, renames Skill Kit and AI Control Tower, and phases out older models for new configurations. Before upgrading, list your skills and agents, then check which rely on ITSM skills facing deprecation or removal, or on older models, and which roles they use.
Names that change in Brazil
Search runbooks, training notes and role request forms for AI Admin Hub, and update the menu paths before the upgrade. AI Skill Kit is the Brazil name for Now Assist Skill Kit. AI Control Tower is now Super Intelligence Control Tower, with expanded security, governance and monitoring. If an approval record or AI policy names the old product, update it before the upgrade so the approval matches the product you run.
Models and ITSM skills with upcoming changes
As of November 2026, older models are being phased out for new configurations, but published AI assets that already run can continue. Record the model each published skill, agent and provider configuration uses. Then run a regression test on any model change, because a new model can answer the same input differently even when the skill itself is untouched.
As of November 2026, standalone ITSM Incident Assist and Suggested Steps skills have undergone deprecation or removal changes, and some older Virtual Agent topics are being prepared for future deprecation. Check your instance for any of these before the upgrade. Where one is in use, consider the newer agentic equivalent and test it against your own cases before moving users across.
Checks to run before the upgrade
- Inventory. List every skill, copy, draft and agent with its plugin, status and last tested release.
- Placement and roles. Record where each active skill appears, in-product, in the panel or both, and which roles can use it.
- Entitlement tier. The AI tiers are Foundation, Advanced and Prime. As of November 2026, new custom AI agents generally require Prime under the new packaging, so confirm your tier before planning agent work.
- Controlled availability. As of November 2026, some HRSD Advanced and Prime assistants are listed under controlled availability. Keep them out of production plans until your instance shows them as enabled.
- Data sharing. The product-improvement opt-out is set per instance by a user with the sn_generative_ai.data_steward role, and it can take up to five business days to process.
- Usage baseline. Save Overview usage and Subscription Management figures for the last full contract period as a baseline.
Checks to run after the upgrade
Role contents can differ between releases, so confirm each role on the upgraded instance before you reassign it.
- Rerun the test case for each active skill and compare the output with your baseline.
- Check placements and role assignments against the inventory.
- Review AI Agent Studio for version history and duplicate-agent results.
- Confirm the Overview and Subscription Management counts still update on schedule.
Frequently asked questions
Which console do I open to turn a Now Assist skill on?
In the Australia release, open AI Admin Hub and use the AI Skills tab. In Yokohama, use the Now Assist Skills page. In Xanadu, use the Now Assist Admin Features page.
Why does usage on the Overview page differ from the total in Subscription Management?
The Overview cards count actions per skill over your chosen date range, collected once a day. Subscription Management converts actions into assists using each skill’s assist ratio and refreshes nightly. Use the Overview to see which skills people use, and Subscription Management for what counts against entitlements.
Does testing a summarization prompt count against my subscription?
Check your Now Assist usage in the Subscription Management dashboard after a Run Test in the prompt output step, and test deliberately before you activate the copy.
Can I change the built-in case summarization skill directly?
Input data and prompt output change on a copy of a record summarization skill, so make a copy first and change the copy.