OBLYTECH Logo
OBLYTECH Logo

Launcher Screens in ServiceNow Mobile App Builder

A launcher screen is the home or landing screen of a ServiceNow mobile app. You build it in Mobile App Builder from a record that holds a header, an optional search area, a stack of UI sections and quick actions. Admins decide which parts appear, who can see the screen and the order the sections load in.

What a launcher screen is made of

A launcher screen is a container. Users reach screens, reports and records from it, and they search from it. Four parts make up the configuration, and each one is set in a different place.

Component What it controls Where it is set
Header Title text or a logo at the top, plus an optional icon Mobile App Builder for text; the platform web interface for logos
Global search Search across the sources you define Search configuration field on the launcher
UI sections Charts, carousels, record cards, media and icon grids Launcher sections list
Quick actions Commonly used functions Quick action function instance field

Creating the launcher screen record

You need the admin role to build a launcher screen. Open All, then System Mobile, then Mobile App Builder. The builder asks you to choose an application scope. Select the scope you are working in to reach the categories home screen.

From there, use the Screens menu (New, then Launcher screen, then Continue), or All mobile records with Record type set to Launcher screen, which is stored as sys_sg_applet_launcher. Both routes open the same form.

The main fields are these:

Field What it does
Name Name for the launcher screen.
Title The title shown on the mobile device
Header function instance Adds a header section, covered below
Search configuration Attaches a search setup, covered below
Launcher sections Lists the UI sections on the screen
Quick action function instance Adds quick action functions
Access control type Chooses user role permissions or user criteria permissions

Access has a rule that is easy to miss. An empty Role access field under User roles lets users with any role open the launcher, and an empty User criteria access field under User criteria lets all users open it. Each UI section has its own access control type, with its own Role access or User criteria access field.

Headers: text, variable or logo

A launcher header can show text, text with a variable, or a logo. The text header is built inside Mobile App Builder. The logo header is built in the platform web interface, and the logo is an image stored in the instance database.

Setting a text title

A header title is required for a text header. In the launcher, use New in the Settings pane and type the title in Properties. For a greeting that includes the signed-in user’s name, select Choose instead and pick a base system header title that already carries the variable.

Adding a header function icon

The header function instance is optional. It adds an icon to the header that opens the destination screen when tapped. Its Display label is what users see, and its Order number sets the sequence when you have several functions.

Building a logo header

A logo header needs iOS 26 or later and ServiceNow mobile client 22.2 or later. It also needs Brazil Patch 1 or later, or Australia Patch 7 or later. Devices outside those conditions need a text header instead.

On the device, the logo displays between 16 and 38 pixels high. Use a high-resolution transparent PNG or JPEG, with separate light and dark versions for contrast.

In the launcher, set the header display mode to show a logo. Select the magnifying glass in the Logo field, choose New in the Logo table, and name the logo record. Attach the light and dark images, enter their names on the record and submit it. Then right-click in the header and choose Save.

Global search on the launcher

Global search lets users look for information inside the sources you choose. It runs on the Zing search engine and is switched on by attaching a search configuration to the launcher.

In the Search configuration section, select Choose, pick an existing search configuration, select Apply and save. Use Preview to check a configuration before you commit.

The Search Config form has two settings that shape results. The placeholder text fills the search bar until someone types, so use it to say what the box searches. Interleave result mixes results from different sources when on, and groups them by source when off.

The maximum number of search suggestions is not set in Mobile App Builder. Open the Search Application Configuration record for your Zing search application in the instance web interface and change its Suggestions Limit field.

Photo search

Photo search lets users search with an image. Open the search configuration record from the launcher, select Enable photo search in its Settings area, then save.

The option appears when the instance supports it. The system property glide.sg.image_recognition.search.enable must exist and be set to true. If the property is missing or set to false, the Enable photo search option does not show in Mobile App Builder, so check the property first.

UI sections: choosing the right type

UI sections are the content of the launcher. There are five types, and each suits a different job. Add the sections you need rather than stacking all five on one screen. Sections appear from the lowest order number to the highest, so leave gaps such as 10, 20 and 30 for later additions.

Analytics sections

An analytics section previews data visualizations, and tapping a card opens the full analytics screen. It needs a mobile analytics preview and a chart screen with a navigation function. One section holds up to six previews.

A preview starts from a data visualization that already exists in Platform Analytics. In the Analytics preview record, set Type to Data Visualization and choose the visualization. An unsupported visualization shows a message that the content cannot be shown.

The section types are Data Visualization Chart and Data Visualization Single Score. A chart must use vertical orientation. For single scores, vertical keeps all scores visible without scrolling, and horizontal scrolls for several.

Content sections

A content section is a carousel of campaign cards at the top of the screen. Each card can carry a video, an image or text, and a user can watch the video, open a web page, or go to an area of the app. The section title does not appear on the device.

Adding it to a launcher is a web task. Open the content section in the platform, go to the launcher record, and on the Body tab insert a new row in the Launcher section mappings list. Enter an Order number, select the content section and update the launcher. If the Insert a new row link is missing, switch to the launcher’s application and reload.

Record sections

A record section shows records as cards. A horizontal layout scrolls sideways with a See All option for the full list. A vertical layout shows a set number of records down the screen, which suits items that need attention now, such as overdue work or unassigned tasks.

Media sections

A media section displays one image or one video, with a headline and text beneath it. Tapping it can open a screen or a static web address. A media section can also act as a static company logo.

For an image, the recommended size is 160 pixels high and 1366 pixels wide. If your users primarily use iPhones, use 160 pixels high and between 375 and 600 pixels wide. For a video, you enter a video web address instead of choosing an image.

The function the media section opens has three conditions. Its parent table must be Screen Launcher, its parent must be the launcher you are adding the section to, and its location must be the Media UI Section. If a tap on the media section does nothing, check these three first.

Icon sections

An icon section shows screens, launcher screens or functions as icons. A horizontal layout suits grouping related destinations, with names of 20 characters or fewer so they are not cut off. A vertical layout suits actionable items such as approvals.

The display type can be images, icons or basic cards, and the basic option puts more emphasis on the count. The feed count only shows for icons that point to list or map screens. For vertical sections, the column count runs from 1 to 3 and the wide column count from 1 to 4. The wide count must be greater than the standard count, so tablets and landscape phones show more columns.

Frequently asked questions

Who can see a launcher screen?

Access depends on the access control type. With user roles, an empty Role access field lets users with any role in. With user criteria, an empty User criteria access field lets all users in. Sections carry their own access settings.

Does the launcher work offline?

The launcher and the header each have an Available offline setting. Turn both on if you want the header to show when the device has no connection.

Why is my photo search option missing?

The likely cause is the system property glide.sg.image_recognition.search.enable. If it is absent or false, the option does not show. Add the property with the value true, then reopen the search configuration record.

Should I use a text header or a logo?

Use a text header for the widest device support or a title that changes per user. Use a logo when your brand must appear at the top and devices meet the logo requirements. Build the text version first as a fallback.