Moving from ITSM Mobile to ITSM Mobile Agent takes four admin steps: install ITSM Mobile Agent, switch off the old app’s launcher screens and notifications, move custom code out of the old application scope, and review what the 5.0.3 upgrade changes. The ITSM Mobile plugin was deprecated in the Quebec release and no longer receives updates.
Why the switch takes manual steps
The deprecated plugin, identified as com.sn_itsm_mobile, was replaced by ITSM Mobile Agent. The replacement is a mobile-first base system application for triaging and resolving incidents away from a desk, and it also covers on-call and major incident response.
Installing the new application does not retire the old one. Single-tap uninstall of the deprecated plugin is not supported, so it stays installed in the base system. That leaves two sets of launcher screens and two sets of notifications on one instance. An agent who signs in to the ServiceNow Agent mobile app still sees the old launcher screens, and when both apps stay active the same event can produce duplicate alerts.
The administrator therefore carries the cutover by hand. Applets and applet launchers from the two plugins should not run side by side.
Install ITSM Mobile Agent before touching the old app
Start with the application named sn_itsm_mobile_agt. Installing it requires the admin role. Go to All > System Applications > All Available Applications, then search by name or by ID. If the application does not appear in the list, it may need to be requested from the ServiceNow Store.
Read the dependency list in the installation dialog first, because any plugin marked as needing installation has to be in place before the install proceeds. Valid ServiceNow entitlements are needed for the application and its related Store apps. Demo data suits a development or test instance, not a production cutover.
Install the new application before the old screens disappear, so agents have a working destination. Sign-in takes a few taps: the agent enters the instance name, without the domain ending, or scans the QR code the administrator provides, adds an optional nickname and selects Save and Login.
Switch off the deprecated launcher screens
Open Studio from All > System Applications and select the ITSM Mobile application. In Mobile Studio, go to Applet launchers. Open Incidents, switch the Active toggle off in the header menu, and save. Repeat the same steps for My Approvals.
After the change, neither deprecated launcher screen appears when an agent signs in. Confirm this on a device that already had the old instance added.
Switch off the deprecated notifications
Under Notifications > Notifications, open Approval assigned to me, clear the Active check box, and select Update. Then open Incident commented, clear Active, and select Update.
Review any other active notifications from the old plugin with the same check.
Move custom code out of the old application scope
The administrator checks the deprecated ITSM Mobile application scope for customizations. Those include custom notifications, custom launcher screens and custom applets. Each one should be deactivated, or moved into the ITSM Mobile Agent application scope.
There are two ways to move code. You can copy the custom code and paste it into the ITSM Mobile Agent scope, or redefine the logic there. Copying suits a straightforward script; redefining may suit logic that relies on structures the new application handles differently.
A customization left active in the old scope keeps running next to the new one, which can produce overlapping screens.
What the 5.0.3 upgrade changes
Migrating to ITSM Mobile Agent 5.0.3 updates three kinds of legacy component: icon sections, UI parameters and card views. Its purpose is support for the Next Experience theme and accessibility. Styling changes can be made through UI rules instead of UI styles, and positive action buttons change emphasis from primary to positive. When the plugin.upgraded event fires for sn_itsm_mobile_agt, a script action named Run clean upgrade for ITSM Mobile Agent runs. It calls three methods in the sn_itsm_mobile_agt.MobileUtahUpgradeEngine script include: cleanUpgradeIconSections(), cleanUpgradeButtonInstance() and cleanUpgradeLegacyCards(). Once it has run, the script action deactivates itself so later upgrades do not run it again.
Icon sections become navigation sections
A map in sn_itsm_mobile_agt.MobileIconSectionMigrationConstant pairs each legacy default icon section with the navigation sections and applet launcher records that replace it. The script compares each pair’s applet launcher records. If the counts differ by one in either direction, or if any record involved has been customized, the script deactivates the new default navigation section. If neither condition applies, it deactivates the legacy icon section.
Custom icon sections not shipped by default keep working but may fall short of the Next Experience theme and accessibility standards, so they should move to navigation sections. Active customized default sections need manual review and a move onto the new navigation section.
UI parameters become input form screens
The sn_itsm_mobile_agt.MobileInputFormScreenMigrationConstants map pairs each legacy default button instance with its new default counterpart. The script checks the legacy button instance, the button it points to, the UI parameters and action parameter maps tied to that button, and any write-back action items. Customized pieces cause the new default button instance to be deactivated; otherwise the legacy one is deactivated.
Custom button instance flows that the product does not ship by default continue to function, but they should move to input form screens. Input form screens work in offline mode, so users can enter data without an internet connection, though custom map, signature and screen inputs are not supported offline. Each screen has to be associated with an action item, and its inputs and variables mapped to that item. Input types include attachment, barcode, choice, date/time, reference and signature.
Customized UI parameters left unmoved produce a mixed experience, with some screens following the new theme and others not, which can create accessibility problems.
Item views become mobile cards
The map for item views pairs each legacy default item view with the form screens and master items where that legacy card is referenced. The script checks the legacy item view and its UI style records. Where customizations exist, the form screen and master item records revert to their earlier state, provided those two are not customized.
Custom item views not shipped by default keep working but may not support the Next Experience theme or accessibility compliance, so move them to input form screens. Customized default item views need their changes carried into the new flow. Mobile Card Builder is reached from Mobile App Builder at All > System Mobile > Mobile App Builder, and is open to an admin or a delegated developer.
Summary of what the upgrade does and what you do
| Legacy component | What the upgrade does | Your action |
|---|---|---|
| Icon section | Deactivates the new navigation section or the legacy icon section, depending on customization | Review any active legacy sections; move customizations to navigation sections |
| UI parameter button instance | Deactivates the new button instance or the legacy one, depending on customization | Move custom flows to input form screens |
| Item view (card) | Reverts form screen and master item where the UI style was customized | Move custom item views to input form screens |
| Deprecated launchers and notifications | Not switched off by the upgrade | Switch off manually |
| Custom code in the old scope | Left for the administrator to check | Deactivate it, or move it to the ITSM Mobile Agent scope |
Checks after the switch
Sign in on a test device and confirm the deprecated launchers are gone. Trigger one assignment and confirm a single notification arrives. Then open an incident in the app to confirm it loads. The incident management guides on this site cover the record side of that work.
If you use actionable push notifications, each push action needs a function mapped to it. Set the function for each action in the Push Action Instances list on the notification record. Check each mapping.
Check the AI Search configuration as well. The app adds a search application configuration named [AIS] ITSM Mobile Agent Search Configuration and a search profile named ITSM Mobile Agent Search Profile. Agents can switch between Zing search and AI Search, and AI Search covers incidents, change tasks, catalog tasks, changes, system users and knowledge articles.
If agents will start collaboration from incident, incident task or major incident records, install the Collaboration services application (sn_tcm_collab_hook) first, as an admin. If you want Slack integration, add the Slack Spoke for ServiceNow IntegrationHub application (com.sn.slack.ahv2). For Microsoft Teams, add the IT Service Management integration with Microsoft Teams application, or the HR Service Delivery equivalent, as required.
For instances serving several tenants, domain separation must first be turned on in the platform web interface before it extends to mobile. The domain-separated tables are Incident [incident] and Incident Task [incident_task].
Frequently asked questions
Can the deprecated plugin be removed in one step?
No. Single-tap uninstall is not supported, so the plugin stays installed. Switch off its launchers and notifications by hand, and deal with its customizations first.
Why do agents receive two alerts for one event?
Notifications from both apps stay active until each is switched off, so one event can reach a device twice. Clear Approval assigned to me and Incident commented in the deprecated plugin, then check any others.
Does the 5.0.3 upgrade fix customizations automatically?
For each component it deactivates either the legacy record or the new default, depending on customization. It does not move your customizations for you, so active customized defaults still need a manual review.
Who needs the admin role for the switch?
Installing the application, switching off the launchers and notifications, and moving custom code all require the admin role. Signing in to the ServiceNow Agent app requires no role.
Does the migration depend on domain separation or collaboration?
A single-tenant switch does not depend on either. Domain separation applies to instances serving several tenants and is enabled in the web interface first. Collaboration services are an extra install for agents who start chat from incident records.