To configure mobile offline ServiceNow access, enable offline capability for the mobile app, make the required screens and functions available offline, and download the data users need before connectivity disappears. Choose manual, scheduled, or incremental cache updates, then test offline work and synchronization back to the instance after the device reconnects.
Define the mobile offline ServiceNow workflow first
Start with one task that a user must finish without a connection. Identify the app, the starting screen, the records the user opens, the fields they change, and the action that completes the work. An offline inspection needs more than a visible survey: the device needs the survey data before the inspector loses connectivity.
Mobile Agent, Now Mobile, and custom branded apps created through Mobile Publishing can support offline use. App-level capability sets the foundation, but screens and functions involved in the workflow also need offline configuration. Enabling the app does not automatically prepare its complete set of flows.
Use a small acceptance scenario: open an assigned record, enter a change, save or submit it, reconnect, and inspect the resulting instance record. Record which references and attachments the scenario needs. This gives the configuration work a boundary and makes missing cached dependencies easier to identify.
If you are deciding which experience the task belongs in, start with the ServiceNow Mobile Experience guide. Check the settings below on your instance and release; the configuration details here follow Brazil behavior.
Enable the app and its offline entry screen
For Health and Safety in Now Mobile, the configuration requires the admin role. Begin with the application scope set to Now Mobile. Enable the native app first, then make the relevant home screen available offline.
- Navigate to All > System Mobile > Mobile branding > Mobile App Configs.
- Open Now Mobile, select Offline enabled, and select Update.
- Navigate to All > System Mobile > Mobile App Builder.
- Find and select the Health and Safety application scope. For safety incidents and observations, select Health and Safety Incident Management.
- Select Mobile app configs and then Now Mobile. If the scope is different, select Edit in original scope.
- Under Home, select Homepage and then Open record.
- Turn on Available offline and select Save.
These steps prepare the Health and Safety entry point. Continue through the screens and functions needed for your chosen task, because the native app setting does not replace their offline availability settings. Treat navigation and the action at the end of the form as part of the same test.
For a branded client, keep app publishing decisions alongside the offline design. The mobile app publishing guide covers that adjacent work.
Prepare the first cache before leaving coverage
Users need an offline cache on their device before they can work with its contents without a connection. Download Cache starts a full download when no cache exists. The first cache must cover the records and resources selected for offline use; it becomes the device’s working copy away from the instance. A progress indicator helps users see whether preparation is still underway, and they can use the app while it runs.
Once the device has a cache, Update Cache refreshes it with current instance data. Build a departure check around the actual assignment: verify the expected task appears, open its form, and check its reference selections. A completed download does not establish that your configuration included the right records.
Manual downloading suits a known transition into poor coverage. Avoid making repeated full downloads the normal operating routine, because frequent manual downloads add server load. Use scheduled or incremental updates when the working pattern calls for automatic refreshes.
Separate refreshing downloaded data from uploading completed work. A cache refresh prepares what the user can access offline. The outbox holds offline changes waiting to synchronize. Your test should establish that both directions work, rather than treating a current cache as proof that a submitted update reached the instance.
Choose scheduled or incremental cache refreshes
Scheduled offline caching requires the Agent Schedule plugin, com.snc.agent_schedule. For Mobile Agent, plugin activation creates the client scheduling entry. Create work schedules through Agent Work Schedules [agent_work_schedule] so the system can generate the corresponding Agent Daily Schedules [agent_daily_schedule].
For other mobile clients, verify an entry exists in offline download schedule [sys_sg_offline_download_schedule] for the client type. That entry identifies the table holding user download schedules. Do this before investigating a device that has no scheduled payload.
- glide.sg.offline.scheduled_download.enabled enables scheduled downloads for Mobile Agent users.
- glide.sg.offline.scheduled_download.cachesync_offset controls how many minutes before the scheduled time payload generation begins.
- glide.sg.offline.scheduled_download.reminder_offset controls the advance reminder for a manual cache download.
- glide.sg.offline_payload.refresh_frequency sets the interval between the initial scheduled download and later refreshes.
- glide.sg.offline.attachment.max_total_bytes controls the attachment storage allowance within the offline cache.
Scheduled jobs depend on users enabling background downloading in the app. For diagnosis, inspect the Events [sysevent] records associated with payload generation and delivery. Compare those records with the user’s work schedule before changing timing properties.
Incremental caching downloads additions, changes, and deletions for the records defined through configured data items. It compares cached data with instance data rather than repeatedly retrieving the complete dataset. After incremental updates are enabled, the user must turn on Background downloading. Enable Wi-Fi only lets the user restrict those downloads to Wi-Fi.
Choose the refresh pattern around when records change and when connectivity is available. A scheduled start-of-shift cache can prepare a predictable departure; incremental updates can keep the selected records current between downloads. Test with the user’s actual background download preferences.
For help planning this work, see ServiceNow implementation.
Test forms, queued changes, and reconnection
A form opened without connectivity cannot fetch missing values from the instance. Its fields and supported logic depend on what the device already holds. Reference inputs search local records; an uncached reference returns no results. Data sources can populate fields offline when their dependent tables are included in the payload. For example, a work order form that derives a location needs the relevant work order and location data.
Supported offline inputs include string, number, Boolean, date and time, choice, reference, attachment, and barcode. Custom map, signature, and screen inputs are unsupported offline. Dynamic reference qualifiers that need a live server query are also unsupported. Test those dependencies before promising that an online form will behave the same way without connectivity.
Where Save is configured for progress, it retains the offline form state locally. The outbox queues record creation, edits, and deletions in action order. After reconnecting, tap Go Online and Sync to send pending work to the instance. Confirm the resulting records before considering the task complete. Conflicting changes can cause an item to fail, including when someone changed the instance record during the offline period.
- Download or refresh the cache while connected and open the assigned task.
- In the app, open Settings > Offline and turn on Offline Mode. Disconnect the test device, then complete the intended workflow, including references and attachments.
- Check that saved work can be resumed and that submitted changes enter the offline queue.
- Reconnect and tap Go Online and Sync when prompted. After synchronization, inspect the instance record and attachments. Open Settings > Offline > Outbox to investigate failed items.
- Repeat with a server-side change made during the disconnected period to test conflict handling.
To leave offline mode through Settings > Offline, turn off Offline Mode and use Sync all in the outbox list. If synchronization reports a conflict, inspect the affected item before retrying. Resolve opens the correction path; Delete removes the issue from the list. Check the instance result when deciding whether the work is complete.
For deeper form design, see offline caching and forms. If the acceptance test fails, use the Mobile Experience troubleshooting guide to organize the investigation around the failing step.
Keep the acceptance result tied to a named workflow and device configuration. Record the cached assignment, the offline action, the reconnected instance result, and any failure. That evidence gives support staff a reproducible case instead of a broad report that offline mode is unavailable.
Questions about offline rollout edge cases
Does Download Cache remove existing local drafts?
The initial download leaves existing local drafts, saved forms, and outbox items intact. Still, include a device with unfinished work in rollout testing so your team can distinguish retained local work from newly downloaded records.
Is the reference limit shared across the whole screen?
The limit is 1,000 records per reference input. Inputs targeting the same table contribute separate selections that the device merges and deduplicates. The combined table cache can therefore exceed 1,000 records, affecting storage and the initial download.
Why can an offline attachment be missing from the activity stream?
Attachments queued offline do not appear there by default while disconnected. The writeback action offline step can be configured to reflect added attachments in the record activity stream before synchronization.
Can repeated saves become a single outbox item?
Apps can consolidate consecutive actions from the same button and record context into a merged entry. The latest record state is retained. Verify whether consolidation is configured before using outbox item counts to measure completed work.
Does completing an offline safety survey require a role?
Completing an assigned safety inspection or audit survey offline in Mobile Agent requires no role. Before starting, open Settings > Offline in Mobile Agent and turn on Offline Mode; the assigned survey must already be downloaded. If scheduled caching is not configured, use Settings and Update Cache before losing connectivity. Users open Home, then My Assessments and Surveys under My Actions, complete the selected survey, and tap Submit.
If shift workers share one phone or tablet, can they still complete tasks offline, and what must be decided first?
Not under the app-level shared-device mode described in ServiceNow’s 30 April 2026 guidelines, which list offline mode as unavailable. A phone passed between shift workers can support offline work only when the sign-in, cache and handover design is built and tested as its own architecture. Settle that before the hardware or device configuration is fixed.
Separate shared hardware from the two shared-device modes
Shared hardware, app-level multi-user mode and operating-system shared mode are different things. Shared hardware means the phone changes hands at shift change. As of the 30 April 2026 guidelines, ServiceNow’s app-level multi-user mode requires a single configured account connection on the device. Operating-system shared mode is a separate configuration topic. As of November 2026, only the app-level mode is documented as lacking offline support, so name which one a requirement means.
Decide these four points before the device design is fixed
- Whether any journey needs device sharing and offline work together. If it does, the app-level shared mode cannot be the design, and the team needs a tested alternative first.
- Whether each worker signs in as themselves. Shared personal credentials should be ruled out, so the sign-in path has to work on a device the worker did not bring.
- Which records and attachments may sit in the offline cache. Offline use places selected records on the device itself, so the field list is a data-minimization decision.
- Whose policies apply and what the next worker sees. ServiceNow’s April 2026 shared-device guidance warns that the app-level feature applies the first authenticated user’s policies, and push notifications are off by default in that mode.
Test the handover with two workers on the real device
Assign the device to one worker, cache a task while connected, and complete it with the network off. Then log that worker out through the normal handover path, not a restart, and check whether drafts or queued changes stay visible to the next worker. Finally, have the second worker complete a task offline, reconnect, and confirm that each worker’s changes reached the instance under their own identity.
Ask for these items before sign-off
- A written list of the modes and operating-system versions that support the offline journey the shift needs.
- The configured SSO logout setting (the SingleLogoutRequest service URL) and a test result showing the next worker cannot reach the previous session.
- A field-by-field list of cached records and attachments, with the reason each one is needed offline.
Where shared device designs usually break
The usual failure is a design that works on one assigned phone and is then handed to a shift team with offline mode switched on by habit. The first sign-in looks fine. Problems appear at handover, when the next worker’s cache lacks their records or the previous worker’s unsynced changes are still on the device. Where a shift needs both, a mixed design may be cleaner: an assigned device for offline workers and a shared device for online-only requests, tested before any hardware is ordered.