Industrial Connected Workforce Mobile Experience lets shop floor staff log a deviation, escalate it to a breakdown, read recommended actions on the task and turn them into an action plan from a phone. Root cause analysis runs as its own procedure in the Digital Factory Workspace, and this guide covers the mobile steps that lead up to it.
What the mobile experience covers in the Australia release
The Industrial Connected Workforce (ICW) Mobile Experience extends the Digital Factory Workspace to phones and other mobile devices. Operators can execute guided tasks, log deviations and actions, escalate issues to breakdowns, start breakdown analyses and report safety incidents from the floor. The mobile agent also gives access to the Standards hub and to search, so people can find standards, knowledge articles and tasks without returning to a desktop workstation. The ServiceNow Mobile Experience guides cover the wider mobile platform.
Mobile recommendations follow the same rules as the Digital Factory Workspace, so the guidance matches on a device and a computer. A deviation is any equipment or work anomaly that affects work safety, performance or quality.
Connecting the Now Mobile Agent
An administrator with the sn_icw.application_admin role prepares the app in Studio, under All > System Applications, by selecting ICW Mobile and customizing the widgets and fields the mobile instance shows. The configuration options include connecting to ICW data, UI actions, push notifications for task assignments, scheduled offline caching, special handling notes, chat, location tracking and the dark theme.
Logging a deviation on the mobile app
Creating a deviation requires the sn_icw.deviation_user or sn_icw.deviation_expert role. From the home page, open the Actions menu and select New deviation. The form spans two screens: complete the fields on each, select Next, then choose any origin, active material or resolution code that applies and select Submit.
| Field | What it holds |
|---|---|
| Classification | Deviation, Breakdown, Process failure or Defect |
| Functional location | The work area (ISA-95), filled from the user’s worker profile |
| Equipment | The machine involved, filled automatically when the standard specifies it |
| Category | Mechanical, Electrical, Pneumatic, Hydraulic, Environmental, Defect or Other |
| Impact | Safety, Quality, Reliability, Operations or Other |
| Urgency | Critical, Important, Routine or Deferred |
| Priority | Set automatically from impact and urgency |
| Additional assignee list | People notified or contributing, without being the primary assignee |
| Failure mode | Options that depend on the location or equipment |
| Resolution code | None, Not fixed, Fixed by operator or Fixed by maintenance |
A resolution code chosen at creation puts the deviation in the Closed state. Without one, it starts in Found. An open deviation can then be edited, rescheduled, delayed, fixed, closed or canceled. Close, Cancel and Reopen are restricted to the sn_icw.deviation_expert role.
Escalating a deviation to a breakdown
A deviation becomes a breakdown when its impact grows, for example when production impairment lasts longer while the problem remains unresolved. Escalation sends the record down a route for deeper analysis, intended to uncover root causes and help prevent similar issues in future processes. For the general explainer on breakdowns, see breakdown explained.
To escalate a deviation already on the task list, open the Tasks tab, select the deviation, open the three-dot menu and choose Escalate to breakdown, then confirm. The record is reclassified as a breakdown and can be fixed, canceled or taken into a breakdown analysis. To log a breakdown directly, select New breakdown from the Actions menu. The breakdown form comes first, followed by the deviation fields, then failure mode, active material and resolution code where they apply.
Recommended actions on a task
The Recommendations tab shows suggested actions generated from the task’s current context. For a deviation, it lists related tasks and knowledge articles. Each item is labeled as linked to the deviation or returned by AI Search. Knowledge articles attached to an Industrial Guided Task (IGT) standard can also be viewed from the task form. Opening a related deviation or IGT shows it in its native mobile screen rather than a web view, so the user stays in the app.
Setting up AI Enhanced Recommended Actions
This version needs Recommended Actions for ICW installed and configured first. An administrator with the admin role then creates a Microsoft SharePoint Online external content connector, sets its crawl settings, and links it to the RA-ICW AI search profile under AI Search > Search Experience > Search Profiles. On the Search Sources tab, the indexed source is set to SharePoint Online.
Next, review the deviation fields that produce search results. Editing them later restarts the search. Under Recommended Actions > Context, open the Deviation context, then the Deviation being active rule, and change the fields affecting that rule. Removing predefined fields can change the contextualized document and the action plan.
Contextualizing an external document
A user with the sn_icw.deviation_user and sn_ai_enhanced_ra.document_user roles can ask why a document matters to a deviation. Open the deviation, go to the Suggested actions tab in the Recommendations panel, and select the Contextualize document action. A summary explains why the document is relevant.
Generating an action plan
An action plan documents and tracks remediation for a deviation. Each plan lists steps, an owner for each step, and tracking mechanisms. It requires the sn_icw.deviation_user and sn_ai_enhanced_ra.action_plan_user roles.
- Open the deviation, then the Recommendations tab and the Suggestions section.
- In the Action plan section, select Generate Action Plan and expand it.
- Review the steps. The plan is built from uploaded resources and the deviation record.
- Select Add to work notes, then open the Activity tab and refresh.
- Open the More icon on the plan and select Create follow-up actions, for the whole plan or one step.
- Track those follow-up actions from the Related tab.
Root cause analysis in the Digital Factory Workspace
A root cause analysis (RCA) identifies what caused a disruption and helps prevent it recurring. The Industrial Root Cause Analysis uses a Playbook, a guided sequence that standardizes how the RCA is run across manufacturing operations. The procedure runs in the Digital Factory Workspace: go to Workspaces, select the workspace, then Add and New Root Cause Analysis. Creating one requires the sn_icw.rca_user or sn_icw.rca_expert role, and the expert role can also cancel one. For IT problem records, see the root cause analysis guide for problem management.
The steps run in order.
- Complete the Root cause analysis form and save. The Playbook opens.
- On the Information Gathering form, answer Who, What, When, Where, Why and How, then mark complete. Why covers underlying causes, and How covers how the issue occurred and was resolved.
- On the Basic Conditions Check page, attach existing related standards or create them. A standard must be published to appear in the Recommendations sidebar. Mark complete.
- Confirm with Yes or No whether the standards were executed properly, then mark complete.
- In the Action Plan section, create the actions that come from the analysis, then mark complete.
A step can be reopened, but the next step cannot be reached while an earlier one is incomplete. The finished analysis appears in the RCA list and in the list of all tasks.
How priority is calculated
Priority on the RCA form is set from impact and urgency. The table shows the three urgency levels the form offers.
| Impact | Critical | Important | Routine |
|---|---|---|---|
| Safety | Direct | Direct | This shift |
| Quality | Direct | This shift | Today |
| Reliability | This shift | Today | Within 7 days |
| Operations | This shift | Today | Within 7 days |
| Other | This shift | Today | Within 7 days |
A safety impact with critical urgency is set to Direct, while a reliability impact with routine urgency is set to Within 7 days.
Working with slow or unstable connections
Some factory areas have slow or unstable connections. Administrators can enable or disable UI actions to reduce the load on mobile devices, so the app loads the information that matters. Offline mode also has a limit to plan around: reference fields hold up to 1,000 records. If the dataset behind a reference field is larger, just the first 1,000 are available offline, which can affect completeness and look-up. For more on offline caching for forms, see offline mode caching for forms.
Roles at a glance
| Role | Used for |
|---|---|
| sn_icw.application_admin | Configuring the ICW Mobile application in Studio |
| sn_icw.deviation_user | Logging and escalating deviations, with the AI roles for documents and action plans |
| sn_icw.deviation_expert | Deviation user actions, plus Close, Cancel and Reopen |
| sn_icw.rca_user | Creating and performing root cause analyses |
| sn_icw.rca_expert | Root cause analysis work, plus canceling one |
| admin | Setting up AI Enhanced Recommended Actions |
For the wider access design picture, see mobile experience security and access design.
Frequently asked questions
Can a root cause analysis be completed from the mobile app?
The RCA procedure runs in the Digital Factory Workspace. The mobile app covers the deviation, breakdown, recommended action and action plan steps that lead into it.
What state does a new deviation start in?
It starts in Found, unless a resolution code is chosen at creation, in which case it starts in Closed.
What separates a deviation from a breakdown?
A deviation is any anomaly that affects safety, performance or quality. A breakdown is the escalated form, used when the impact grows, and escalation reclassifies the existing record.
Why does a standard not appear in the recommendations?
A standard must be published before it appears in the Recommendations sidebar of a root cause analysis.
For the broader factory context, see ServiceNow for manufacturing.