AI in regulatory change management means using generative AI skills and agentic workflows to summarize a new regulatory alert and suggest which citations, control objectives, controls and policies it may affect. A person still makes the call. A suggestion becomes an impacted area when an analyst accepts it.
Where the AI sits in the alert lifecycle
A regulatory alert is a record of a change gathered from regulatory intelligence providers. When an analyst marks an unassigned alert as applicable, a regulatory change task is created to analyze the impact and coordinate the compliance work. The AI features plug into it at three points. A summary helps the analyst judge whether an alert needs attention. Recommendations show which parts of the control framework a change may reach. An action plan turns confirmed impacts into tasks.
The features fall into two families. Generative AI skills produce one output for one alert. Agentic workflows run several steps in sequence. One of them searches the web for context, and another creates change and action tasks once the analyst confirms them. For the wider product area, see ServiceNow policy and compliance management.
| Capability | Type | What it produces | Alert states |
|---|---|---|---|
| Regulatory alert summarization | Skill | Summary of key dates, authority, changes, penalties and fines | Any state by default; configurable |
| Impacted citations, control objectives, controls, policies | Four recommendation skills | Suggested impacted areas drawn from the inventory | Any except Closed or Cancelled |
| Get regulatory analysis | Agentic workflow | Enriched insights from web search, plus recommended impacts | |
| Generate regulatory action plan | Agentic workflow | Change and action tasks grouped by impact type | Impacted areas attached |
Analysts who work with their assigned alerts need sn_grc_reg_change.user and sn_grc_comp_genai.reg_change_ai_user. The agentic workflows also need sn_grc_comp_genai.reg_change_ai_agent_user. The recommendation skills require the reg_change_ai_user role to be assigned manually.
What the summary reads from the alert record
The summary reflects the record behind it. The summarization skill reads a base set of alert fields, including the title, description, source publication date, effective and compliance dates, provider, citation, state, stage, overall impact and functional domain, plus the dates the alert changed state. A thin description or a missing compliance date leaves the model with less to work with, and the output typically reflects that.
Administrators can extend the input. A single input template applies regardless of alert state. Related data can also be added, such as the linked taxonomy, impacted areas (including whether an entry was AI-assisted), and the regulatory change tasks attached to the alert, with their state, assignee and due date. Whatever is left out of this setup is simply absent from the summary, so reviewers should look for gaps as well as for wording.
Activating the skills before anyone uses them
Summarization is on by default after installation. Recommendation skills need setup. Install the ServiceNow Otto for IRM plugin, which activates its skills and agentic workflows by default. Then open the AI Admin Hub from All > Admin Center, go to the AI Skills tab, choose Technology > Risk & Sustainability, and activate each recommendation skill. Activating a new copy of one of these skills deactivates the other versions, including the default. Access can be open to any authenticated user or restricted to named roles, and a skill can be switched on across all IRM products with a display toggle. For the wider governance of AI features, see AI governance and control.
From version 19.0.x, users with the ServiceNow Otto for IRM application can use the summarization skill and the citation and control objective recommendation skills, so confirm the instance release first.
Generating a summary and deciding what to keep
To summarize an alert, open it from the Compliance Workspace, either from the regulatory alerts list or from a segment of the Regulatory Change Management dashboard. On the Overview tab, select Summarize. The summary covers the key details set in the skill, such as important dates, regulatory authority, summary of changes, and penalties and fines. Where the alert does not contain an item, the summary says so, with wording such as no specific information available for penalty or fines. That line tells the analyst what the alert did not settle.
The analyst can then edit the text through Share to alert summary, rate it, copy it, or refresh it if the alert has changed. Generated summaries need a check for accuracy before anyone relies on them. For the evidence side of this kind of GRC work, see GRC, policy and audit evidence.
Accepting or dismissing recommendations
Recommendations are generated from the Overview tab with Recommend, or from the Recommendations tab with Show AI recommendations. They can be produced for any alert that is not Closed or Cancelled. The suggestions draw on records already in the inventory, so a citation, control objective or control with no inventory entry will not appear. Inventory quality therefore sets the ceiling on what the AI can offer. For general guidance on keeping that inventory in shape, see policy and compliance management best practices.
Each card carries the detail needed to decide. A citation card shows its reference, description, supplemental guidance, and child citations with their authority documents. A control objective card shows its category, classification, type, and linked policies, controls and risk statements. A control card shows its status, owner, entity, and whether it is Manual, Automated or Continuous. Child records appear only when they have been mapped in the inventory, so an empty child list reflects the mapping rather than a fault in the AI.
To act on a card, tick the child records to include on each tab, then select Accept. The card becomes an impacted area, and each selected child is added as one too. Selecting Dismiss hides the suggestion for that alert, so it is not offered again there. The refresh icon regenerates suggestions against current data. After accepting, check the impacted areas list. If the suggestions were dismissed or the list is incomplete, add impacted areas by hand.
Running the agentic workflows
The get regulatory analysis workflow enriches an alert with outside context. Using web search, it adds enriched insights that include a summary, fines and penalties, important dates, taxonomy, and the sources it drew on. The analyst can save that overview to the Enriched Insights field or discard it. The workflow also recommends impacted areas across citations, policies and control objectives, which appear on the Recommendations tab. It runs from the Ask ServiceNow Otto action menu on an alert, or from the ServiceNow Otto panel anywhere in the Compliance Workspace.
The workflow is active by default, and its fields are read-only apart from triggers, channels and status. To change its behavior, duplicate it and edit the copy, because agent prompts cannot be edited in place. Before relying on it, use the testing playground with sample requests and confirm that enriched insights and recommendations appear. Results depend on recommendation templates and alert categorization, so set those up first.
The generate regulatory action plan workflow comes one stage later. The alert must already have impacted areas attached. Without them, the workflow returns a validation message and creates no tasks. With them, it analyzes the impacted areas and similar historical alerts, then proposes change tasks and action tasks grouped by type, such as control update, citation amendment and policy revision. A group called other holds cross-functional work that does not map to one impacted area. Answering Yes in the panel creates the task records, which then appear on the Regulatory tasks tab. Answering No creates nothing, and tasks can be built manually.
Once tasks exist, the change rules are specific. Only change and action tasks in the New state can be deleted from the alert, while tasks in the New or In Progress state can be assigned and updated. The plan is a starting point, and its quality tracks the impacted areas behind it.
Keeping a person in the decision
These features have clear limits. Output may not be accurate, complete or appropriate. The customer is responsible for testing accuracy, harm and suitability for the use case, for keeping human oversight, and for not relying on AI output alone for decisions, particularly in consequential areas such as legal and finance. In practice this means naming the person who accepts each impacted area and writing that step into the procedure. For how that ownership is organized more broadly, see the policy and compliance management governance model.
In a domain-separated environment, the AI draws on material in the user’s own domain. The data stays on the instance, and the shared generative AI services do not persist prompts or responses.
Availability varies. Some model providers are unavailable to customers with in-country SKUs. Some AI features are unavailable in FedRAMP, NSC DoD IL5, Australia IRAP-Protected data centers, self-hosted environments and other restricted settings. Some are offered in certain regions, and some are not available in Regulated Markets. Confirm these against the instance before planning around a feature.
Frequently asked questions
Does the AI decide which controls or policies are affected?
No. A suggestion becomes an impacted area once a user accepts it. Dismissing it hides that suggestion for the alert, and the analyst can still add impacted areas by hand.
Why does a recommendation card show no child records?
Child records appear only when they are mapped to inventory entries. An unmapped parent will show an empty list, and the fix is in the mapping.
Which alert states can each feature use?
Summarization is available in any alert state by default and can be restricted to specific states. Recommendations work on any alert that is not Closed or Cancelled. The action plan workflow needs an alert with impacted areas attached.
What roles does an analyst need?
Analysts need sn_grc_reg_change.user and sn_grc_comp_genai.reg_change_ai_user, and the agentic workflows also need sn_grc_comp_genai.reg_change_ai_agent_user. Recommendation skills need the admin or sn_nowassist_admin.nsa_admin role, summarization needs sn_nowassist_admin.nsa_admin, and the get regulatory analysis workflow can also be activated by sn_aia.admin.