A common control is one control, owned by a primary entity, that several reliant entities depend on. You convert a standard control to common, attach the entities that rely on it, then test once and carry the results across. Inheritance extends the same control into risks, assessments and authorization packages.
Why one control should serve several entities
Consider a compliance lead who has the same safeguard tested separately in several units. Running a separate control for each unit that shares a safeguard multiplies testing, attestation and reporting work. A common control holds the control in one place and lists the units that depend on it as reliant entities.
Picture one site-wide backup-restore test that several regional teams depend on. The control belongs to the primary entity, and the other units are attached to it. The gains are practical: you test and apply the control once instead of once per unit, and you manage fewer active controls, which makes reporting easier to read. For the framework-mapping side of this, see one control mapped to many compliance frameworks.
Converting a standard control into a common control
Controls start as standard controls, whether you create one or pick it from the existing list. Conversion changes the function, and reliant entities are added afterwards. Before converting, set a value in the Control objective field and save the form. The control objective is mandatory, because validation rejects a common control that matches another control on name, entity (primary or reliant) and control objective.
Go to All > Policy and Compliance > Compliance Workspace, then open Compliance library > All controls in the sidebar. Users with the sn_compliance_ws.corporate_compliance_manager or sn_compliance_ws.corporate_compliance_analyst role can convert the control. Open it, choose More Actions in the top right, select Convert to common and click Okay. The Source field then reads Entity, and the Function field changes from Standard control to Common control. The Reliant entities and Reliant entity types lists appear on the form.
Timing matters. The Convert to common action appears only while the control is in Draft or Attest. Beyond those states, it cannot be converted or reverted. Converting back to standard removes the entity type and reliant entity type associations, and the Convert to standard action is hidden while a common control sits in Review.
Attaching reliant entities and entity types
To add individual entities, open the Reliant entities list, click Add, select the entities and click Add. Each attachment is stored in the sn_grc_m2m_item_entity table. To remove one, select it and click Remove.
Entity types suit larger groups. Add the type from the Reliant entity types list. Its entities become reliant entities and appear in the Related entities list, with an Added from entity type column naming the source. An entity added to the type later attaches to the common control automatically.
If the entity you want already sits under a control of its own, use Add from existing control. It retires that control and attaches its entity as a reliant entity, and it accepts up to 15 entities at a time. Not all selected entities are added in one pass, so check the list afterwards.
Inheriting a common control into risks and assessments
A risk owner can link a risk to the common control to mitigate it in the reliant entities. That reduces the effort needed to attest and test the control for each of them. When a control objective and a risk statement are associated and the control’s reliant entity matches the risk entity, the risk-control link forms automatically. You can also use the Inherit common controls action in the Controls list of the risk form when the risk entity is a reliant entity, which groups common controls by control objective.
Changing the risk statement, or the relationship between the statement and the control objective, can change the link. Only active risk-control relationships are kept, and historic ones are deleted automatically.
The same logic applies elsewhere. On a risk assessment, the Inherit common controls option appears when the entity is a reliant entity. On a risk-mitigating task, it appears when the entity is reliant and the task is in Draft or Work In Progress state. On a risk event, the common control links automatically once the underlying risk has materialized, so the control owner can see when it fails and act at once.
Inheriting protection in authorization packages
Other controls can also inherit protection and compliance from a common control. A system owner may depend on controls that another party runs, such as a cloud-hosted application that inherits a hosting provider’s controls. Instead of implementing those controls again, the system owner inherits them, and as long as the provider stays compliant on them, the inheriting package is compliant too. For the wider monitoring context around packages, see continuous authorization and monitoring explained.
Go to All > Continuous Authorization & Monitoring > All Authorization Packages, and open a package in the Select state. Select the control, choose Inherit from Common Control, pick the common control and click Confirm. The Inherited Controls list then shows the control objective and the source common control. The sn_irm_cont_auth.system_owner, sn_irm_cont_auth.info_system_sec_officer and sn_irm_cont_auth.info_system_sec_manager roles can do this.
Testing once and carrying results across entities
Tying the common control to a primary entity means the test is recorded once, against that entity, and only results flagged as inheritable carry across to the others. Tests can cover control tests, indicators, attestations, issues and policy exceptions. Results flagged as inheritable are implemented on all associated reliant entities.
In practice the work usually runs in this order: convert first, since reliant entities are added only after the function changes; attach the entities or entity types; run the one test; apply its results; and convert back to standard only if you later need to. Inherited results spare each reliant entity a separate round of testing, and results are written once instead of repeated for each entity.
How item generation treats common controls
Item generation normally creates a control or activates an existing standard control. Attaching a reliant entity to a common control takes precedence over creating a control for that entity. In practice, reuse existing controls that can test the entities to avoid a control explosion. If they cannot, associate a primary entity with a common control, test it, and implement the results on the reliant entities. If neither works, create a new control.
Common controls are not generated automatically. Existence checks match the control name, entity and control objective together. When there is no reliant association and no standard control, actions such as Add content to entity type or Activate document create a standard control, while Add entity type to common control creates a reliant association. If the intent is unclear, the system prefers attaching the reliant entity to the common control over creating a standard control.
Deactivation differs too. Deactivating a common item deactivates its Control to Entity records, while deactivating a standard item deletes its risk-to-control associations.
How common controls affect compliance scores
Each active, associated common control counts toward a reliant entity’s compliance score like any other control, and the common control’s test results feed into that score. The score recalculates when a control’s status or weightage changes, and for a common control the reliant entities are recalculated as well. Adding or removing a reliant entity also recalculates that entity’s score, as does retiring a common control or converting it to standard. For related reporting, see policy compliance analytics dashboards.
Multiple controls versus one common control
Two requests can look alike but need different answers. Several controls for one entity and one control objective give more granular detail. Several products meeting one objective through a shared mechanism are a sharing question.
For granularity, disable Inherit from control objective on the Control form. When it is on, the control takes the objective’s name and description, and by default only one control can be inherited that way. Further controls for the same pair must be created manually with unique names. For shared mechanisms, such as two backup tools covering one retention requirement, convert the control to common and attach each product as a reliant entity.
Entity views of inherited controls
In the Australia release, the Entity form lists the common controls that the entity or its downstream entities rely on, in a Downstream inherited controls list with Add and Remove buttons. The Function column separates standard from common controls, and the 360-degree view shows controls and inherited controls together. Reliant entity links to common controls are managed in Workspaces.
How the feature differs between releases
The Brazil release is the reference for this page. The Yokohama release covers the same core steps with fewer features.
| Feature | Yokohama release | Brazil release |
|---|---|---|
| Entity based access restriction on converted controls | Not described | Added on conversion, disabled by default |
| Add from existing control limit | Up to 15 entities | Up to 15 entities |
When enabled, only users and groups in the access configuration of the associated entities can open the control.
Frequently asked questions
Can a common control go back to being standard?
Yes. Converting it back removes its entity type and reliant entity type associations. The Convert to standard action does not appear while the control is in Review.
Why can a control not be converted once it has moved on?
Convert to common is available only in Draft or Attest. Convert the control early in its lifecycle.
What stops two common controls clashing?
Validation rejects a common control that matches another on name, entity and control objective. Item generation applies the same match when it looks for existing common controls.
Do test results reach all reliant entities?
Results flagged as inheritable are implemented on all associated reliant entities. The test runs against the primary entity.
Does a common control change compliance scores?
Yes. Its results feed into each reliant entity’s score, and adding or removing a reliant entity recalculates that score.