A control attestation asks the person responsible for a control to confirm, with evidence, whether that control is in place. In ServiceNow Policy and Compliance Management you design the questions first, then decide who answers them and how, group repeat requests so people answer once, and review the results from the control lists and the overview dashboard.
Designing the attestation before anyone answers it
The design choices decide how answers are scored, so make them first. The Attestation Designer is the single screen for building questions and tuning scoring. It sits under Attestation Types in the Policy and Compliance administration menu, and building attestations requires the attestation creator, manager or administrator role.
Choosing question types and what gets scored
| Question type | Counts toward score | What the respondent sees |
|---|---|---|
| Boolean | Yes | A check box or a Yes/No list |
| Choice | Yes | A list of predefined options |
| Scale | Yes | A Likert scale shown as radio buttons |
| Numeric Scale | Yes | A selectable number scale, 1 to 5 by default |
| Template | Yes | A predefined scale taken from a template |
| Attachment | No | Controls for attaching one or more files |
| Date and Date/Time | No | A date field, or a date and time field |
| Number | No | A number field, 1 to 10 by default |
| Percentage | No | A percentage within a fixed range |
| String | No | A single or multi-line text box |
| Reference | No | A choice list of fields from a reference table |
Set the correct answer on each scored metric. Scored metrics are what determine a control’s compliance status, so a scored question without a correct answer gives the status nothing to measure against. Unscored questions still capture evidence and context.
The Template type drives automation. Assign a template to each attestation, because the template is what lets the platform create controls automatically from control objectives and entity types. An attestation without one leaves that automation with nothing to attach to.
Building attestation types and reusing questions
An attestation type is the container for a question set and is tied to one table. Its form asks for a name, an assessment duration (the time allowed from generation to completion), the table, a scale factor applied to results, a condition that selects records from that table, a state of Draft or Published, and the roles that can see the metric type.
Check the Enforce condition option before you switch it on. When it is on, accessible records of the type that fail the condition are deleted. The default GRC Attestation asks three questions: whether the control is implemented, for evidence, and for an explanation. Different control objectives can point at different attestation types, and a compliance manager can build a new question set for each objective.
On the template route, questions can also come from a question bank in the Smart Assessment Engine. A bank holds questions for reuse across templates and carries purposes. A template manager can add its questions only when a purpose matches the template’s purpose, and only published questions are offered. Added questions drop in after the item selected in the content tree, and any question already present is flagged to prevent duplicates.
Assigning attestations to the right people
Two routes assign attestations. The template route generates them from control objectives. The requirement route attests individual control requirements by hand. Pick the route per control objective so the same people see the same kind of task each cycle.
The template route
The template route is an alternative to classic attestation. It needs four scoped applications: Smart Assessment core, Smart assessment Migration tools, Smart Assessment Connected, and Smart Assessment Designer. The GRC smart assessment template ships with the Policy and Compliance Management plugin, and the system property Enable smart assessments on control must be true.
A control objective set to the Attestation method value passes that method to the controls it generates. Older control objectives default to classic assessment, so check them after enabling the property. The Attestation field can still change to a different template until the control reaches the Attest state.
Moving a control to Attest triggers the assessments and emails the control owner and respondents, with the control number and due date in the subject. Returning a control to Draft cancels its active assessments, and so do retiring it or marking it Exempt for a policy exception. Clearing Exempt on an Attest-state control triggers the assessments again.
The requirement route
Some teams attest at requirement level. Open the control in Compliance Workspace, choose Take Attestation at Requirement Level on the Details tab, and the field defaults to GRC CR Attestation. Assign a respondent, either a user or a role, and select Attest. The respondent then works through each requirement under Assessment Instances, choosing Yes (implemented) or No (not implemented). A Yes answer needs evidence and an explanation; a No answer needs a reason in the Explain field.
A failed requirement creates an issue for that requirement, marks the parent control non-compliant, and rolls the same status up to the entity and the control objective.
Grouping repeat requests so people answer once
Answering the same questions across twenty near-identical controls invites shortcuts. Grouping removes the repetition, and the two modes suit different situations.
| Feature | Same response | Different response |
|---|---|---|
| What the respondent does | Answers once | Answers each questionnaire on one screen |
| What happens on submit | Each grouped record inherits the answers and moves to Complete | Each record is submitted with its own answers |
| Limit | Set by the consolidated-questions property in GRC Properties | Set by a grouped-questions property in GRC Properties |
| Best used when | The controls match in substance | The questions overlap but the answers differ |
Same-response carries the highest risk, because it copies one answer across all members. Confirm the grouping limit in GRC Properties before you plan group sizes.
In My Attestations, select the rows, choose Group Assessments, pick the response type, and set the criteria. The default criterion is Metric Type; Category, Control Objective or Risk Statement, and Entity can be added. Grouping by entity can split a selection into two groups. It can also drop records. Take six records: four under one entity and two under two other entities. Only the four are grouped, and the other two are left out. The preview shows the count before you confirm. Custom criteria are built under Assessment Grouping Criteria by administrators and managers.
Combining from Compliance Workspace
Analysts can also combine assessments from the Tasks page of Compliance Workspace. Open Control attestations in the left panel, select two or more assessments in My pending tasks, and choose Combine. Name the group in the pop-up; a blank name defaults to GRC attestation. Individual members stay listed, and a person can still answer one member alone. The Combined Assessments list shows only assessments not yet taken.
Reviewing results and chasing overdue work
Records sit in three lists under Controls. My Attestations shows the active attestations where you are the respondent, one record per control. My Grouped Attestations shows the groups you have created. All Attestations shows all active attestations. Control attestations do not appear under Self-Service, because one cycle can generate many at once.
The My Attestation Overview dashboard, opened from Controls and Analytics Overview, gives a quick read of your queue. It shows past due attestations, your attestations by state, and your pending list. It needs the business user role and is available in the Next Experience interface from version 18.1.1.
Overdue items tend to sit open longest, so learn the mobile route before the first deadline passes. Managers with the compliance manager role open Team’s Overdue Work in the GRC Mobile app and tap Attestations. Swipe left on a record, tap Reassign, choose a person under Assigned to, and send.
Common mistakes in setup and review
The common failure here is a template left unassigned. Assign a template to each attestation type: it is what lets the platform create controls automatically from control objectives and entity types. An attestation type left without one leaves that automation with nothing to attach to. Check the template field on each attestation type before publishing it.
The second is grouping by a criterion that splits a batch unevenly, which can leave records out. After previewing, count the records outside the groups and handle them by hand.
The third is changing a control’s state without checking its attestations. Returning a control to Draft or marking it Exempt cancels active assessments as designed, but a reviewer who did not expect that may think the attestation was lost. Read the Attestations related list on the control first.
Frequently asked questions
Do control attestations appear in the usual assessments list?
No. They appear under the Controls lists in Policy and Compliance Management.
Can one answer cover several controls?
Yes, through same-response grouping. Use it where the controls truly share the same evidence.
What happens to open attestations when a control is retired?
Its related assessments are canceled.
What does a failed requirement do to the rest of the hierarchy?
It creates an issue, marks the parent control non-compliant, and rolls the status up to the entity and control objective.
For the basics of what an attestation is, read the attestation basics page first. Teams that want outside help with setup can read the GRC and IRM implementation page, and the wider policy and compliance management section covers the rest of the platform.