OBLYTECH Logo
OBLYTECH Logo

ServiceNow Policy Exception: Requests, Approval and Extensions

A policy exception in ServiceNow is a dated record that a requester raises when a policy or control objective cannot be met as written. The request can pass through optional verification rules and approval rules, then a compliance manager review. The exception runs between a Valid from date and a Valid to date, and it can be extended.

What a policy exception records

A policy exception is raised from the requester’s side of Policy and Compliance, not from a compliance manager’s queue. The requester opens All, then Policy and Compliance, then Compliance Workspace, and chooses Policy exception from the Create list. The form asks for a reason, which is a short statement of why the exception is needed, and a justification, which holds the evidence or rationale behind it. Additional comments is a separate field where the reviewer tells the requester what else they need to know.

The Source type field decides what the requester attaches the exception to. When the source is a control objective, an Impacted controls tab appears, and the requester selects the controls linked to that objective. When the source type is Controls, the exception can cover several controls that sit under different control objectives in one request. This is the practical reason to choose Controls when a single problem touches more than one objective. For how one control is mapped to several compliance frameworks, see mapping one control to many compliance frameworks.

Dates are set with two fields. Valid from is the day the exception begins, and Valid to is the day it ends. The Valid to date must fall after Valid from, and it cannot be a past date. The form calculates the duration as the number of days between the two dates, so the requester sets the window by choosing the dates rather than entering a separate length of time.

Users who raise these requests need one of two roles, sn_grc.business_user or sn_grc.business_user_lite.

How a requester completes the form

The reason can still be changed by the requester until the exception is approved, which matters when a reviewer asks for a clearer explanation partway through.

Where no approval group is given, the approval group defaults to compliance manager. The same default applies when an upstream integrated application raises the exception rather than a person. The approval group cannot be edited once the exception has reached the Review state, so a requester who wants a different approval group needs to set it before the record moves forward.

Some exceptions carry a risk assessment. The risk assessment is a related list on the record. In releases before version 10.1 the same related list was called Business Impact Analysis and needed the GRC: Risk Management application. Anyone reviewing an older instance should check the related list name and the application dependency before relying on the layout described here. For the wider concept, see the ServiceNow risk register explainer.

Verification rules check the request before approvals start

A verification rule checks a policy exception request for accuracy and completeness before it goes out for approval. It is a gate on the quality of the submission, not a decision about whether the exception should be granted. Verification rules are optional. If none are defined, or none are active, the requester’s team approval is not required, and the request moves toward the compliance manager without that extra step. For wider fixes in this area, see the troubleshooting guide for policy and compliance management.

To set one up, a user with the sn_compliance.manager role opens the Verification Rule list under Policy Exceptions, selects New, and completes the form. The form has a Type field that defaults to Verification Rule, a Name for the configuration, a Short description stating its purpose, and a Source application. The Source application list shows applications that have already been added to the Integration Registry, so an integration has to be registered before it can be used here.

The Active field is the switch that matters for the requester’s experience. When it is selected, the requester can ask for an initial approval before the request reaches the compliance manager. After the rule is saved, the user selects Update, adds approver levels in the Approver Levels related list, and selects Submit. Each level can hold one or more users or a group. Each approver level can either require all selected users to approve, or allow one user to approve on behalf of all approvers.

When the request reaches the Pending Verification state, the approvers are notified. After they approve, the request moves to Analyze and passes to the compliance manager. Any fields the requester left blank, such as Policy or Control Objective, become mandatory for the approvers. That means a request that looks finished to the requester can still stop at verification if a required field was skipped. Approvers need the survey_reader role.

Approval rules decide who signs off

Approval rules set the criteria that decide when an approval request is sent for a policy exception. The criteria include the risk rating, the policy, and the control objective. A rule is configured for a specific source application and can contain several approver levels, so one exception can be routed through a sequence of sign-offs rather than a single reviewer. For the errors people commonly make when they set up these rules, see common policy and compliance management mistakes.

The path to the rule is Policy and Compliance, then Policy Exceptions, then Approval Rule. The user needs the sn_compliance.manager role to create one. The form captures a Type that defaults to Approval Rule, a Name, a Short description, the Source application, an Active switch, a Risk rating taken from the risk assessment on the exception, a Policy, a Control objective, an Auto-trigger approvals switch, and an Order value.

The Auto-trigger approvals switch changes who has to act. When it is not selected, a compliance manager must send the approvals by hand. When it is selected, the approvals start by themselves once the review is completed. The Order value sets the precedence when several rules match similar criteria.

Each approver level has a Name, a Description, a Required approval setting, Users, Groups and an Order. Required approval offers two choices: one approval is enough, or all users must approve. Approvers at this stage need the survey_reader role, and members of an approver group need the sn_grc.business_user role. For handing an approval to someone else, see approval delegation.

The requirements differ by where the exception came from. An exception raised by an upstream integrated application needs its impacted controls present before an approval can be requested. For an exception created inside Policy and Compliance Management, a policy-only exception can be requested without impacted controls, but a control-objective-only exception does need them. Choosing the right source type at the start therefore affects whether the request can move at all.

The GRC Approval Configurator is a separate, template-based route to approval configuration, reached from Assignment and Approval Configurations. It uses its own form, with fields such as Filter Condition, Domain and Approve type, so the field list above describes the Approval Rule form rather than the configurator.

Review and analysis before a decision

Once the request reaches Review, the approval group can no longer be edited. At Analyze, an approver must be selected before the request can continue, so the compliance manager has to name who is responsible for the next decision.

Extensions and the date limits

A policy exception can be extended. The extension date has to fall after the current Valid to date, so an extension cannot be used to reach back into a period that has already been covered. The number of extensions available is controlled by a system property named Number of extensions allowed for a policy exception. The remaining count shown to the requester is that property minus the extensions already approved. For the full set of stages a policy passes through, see the policy management lifecycle guide.

Frequently asked questions

What is a policy exception in ServiceNow?

It is a dated record a requester raises when a policy or control objective cannot be met as written. It carries a reason, a justification, the controls or objective it applies to, and a Valid from and Valid to window.

Who can request a policy exception?

Users with the sn_grc.business_user role or the sn_grc.business_user_lite role can open the form from Compliance Workspace and submit a request.

What does a verification rule do?

It checks the request for accuracy and completeness before approvals start. It is optional, and when it is active the requester’s team can approve the request before it reaches the compliance manager.

How is a verification rule different from an approval rule?

A verification rule checks the submission. An approval rule decides which approvers receive the request, based on criteria such as the risk rating, the policy, and the control objective.

Who approves a policy exception by default?

If no approval group is given, the approval group is the compliance manager. The same default applies when an upstream integrated application raises the exception.

Can a policy exception be extended?

Yes. An extension date must fall after the current Valid to date, and the number of extensions is capped by a system property, so the remaining count is what is left after the approved ones.