OBLYTECH Logo
OBLYTECH Logo

GRC Mobile App for Policy and Compliance Tasks in ServiceNow

The GRC Mobile app lets a policy and compliance manager approve or reject policy requests, decide policy exceptions, and assign or reassign the tasks and issues their team owns, all from a phone. It runs inside the ServiceNow Agent app and needs a few roles, plugins and notification settings configured on the instance before the first sign-in.

What the app covers for policy and compliance work

Policy and compliance work arrives in queues. Policies wait for sign-off, exceptions wait for a decision on their validity dates, indicator tasks sit unassigned, and attestations slip past their due dates. The app puts those queues on a phone so the work keeps moving when the manager is away from a desktop.

The landing screen has three folders. Pending Approvals holds requests waiting on the manager’s decision. Team’s Unassigned Work holds tasks and issues nobody has picked up. Team’s Overdue Work holds attestations and issues past their due date. Each folder contains applets, and each applet opens a list of records.

Folder Applets What the manager does from the phone
Pending Approvals Policies, Policy Exceptions Policies: approve or reject. Policy Exceptions: approve, reject, edit, or request more information
Team’s Unassigned Work Indicator Tasks, Issues, Remediation Tasks Indicator tasks: assign to a user. Issues and remediation tasks: assign to a user, or extend the duration
Team’s Overdue Work Attestations, Issues Attestations: reassign to a user. Issues: reassign to a user, or extend the duration

The app can also display the Risk Management core application. This page covers the Policy and Compliance side only.

Preparing the instance before the first sign-in

The setup checklist is written for an admin and the manager working together, and it takes about 15 to 20 minutes.

Core applications, plugins and release families

Start by checking the GRC Profile dependency. An admin opens Plugins, searches for GRC Profile, and installs it if it is missing. Then install Policy and Compliance Management, Risk Management, or both. These are the two GRC core applications the mobile app can display.

Installing the core applications also installs two dependency plugins, com.glide.sg and com.glide.sg.agent_native_client. Search for both IDs under Plugins and activate them if they are not already active. Confirm that the GRC Mobile app is installed on the instance. The core applications, the mobile app and the instance should come from the same family release.

Roles, groups and notifications

Tasks can be assigned only to users with the itil role, and itil users can create, open and update records. The compliance manager role, sn_compliance.manager, is added automatically when the itil role is assigned. For a larger group of mobile users, assign sn_compliance.manager to an assignment group instead, and each member inherits the role.

Notifications take two settings. On the instance, open System Settings, find Notifications, and enable the ServiceNow Mobile Application option. On the phone, allow notifications in the device settings. Once both are on, notifications about critical pending approval requests appear in the app, and tapping one opens the record.

Installing the Agent app and signing in

Install the current ServiceNow Agent app from the Apple App Store or Google Play. The sign-in takes about five to seven minutes once the instance is ready.

  1. Open the Agent app. If no instance is connected, the Instances screen appears.
  2. Tap the plus icon. Enter the instance name before the ServiceNow cloud domain, for example grcmobile, or the full instance address. A QR code can also be scanned.
  3. Optionally enter a nickname to tell instances apart on one device.
  4. Tap Save and Login, enter the user name and password, and tap Login.
  5. On the Policy and Compliance landing screen, tap More, then Notification, then Enable Notifications.

The instance you log in to becomes the device’s default. To switch, tap More, then Settings, then Logout, and pick the other instance from the Instances screen.

When sign-in does not behave

If the Instances screen does not appear, the Agent app may not be trusted on the device. Allow it in the device’s general device management settings. If that fails, uninstall the app and reinstall the current version. A credential error means the user name or password for that instance was not accepted. If the landing screen will not load after a successful login, check the network connection. For wider policy and compliance problems, see the policy and compliance troubleshooting guide.

Working through policy approval requests

Open Policies under Pending Approvals. Swipe left on a record and choose Approve or Reject. Approval comments are optional, and rejection comments are required. Submit with the Send icon or the Submit button.

You can also open the policy first. The Related List tab shows its Control Objectives, and each objective opens as its own record. Reviewing them helps when a policy spans several objectives. After reviewing, use the menu at the top right to approve or reject.

Handling policy exceptions and extension requests

The Policy Exceptions screen offers Edit, Request more information, Approve and Reject on its swipe menu. Each action asks for different input.

Action Comments Other fields
Approve Optional Valid to date, changed with the calendar icon
Reject Required None
Request more information Sent to the requester, with the extension number included None
Edit Not applicable Valid from, Valid to and Approver

Two details matter in practice. After you request more information, approval is unavailable from the menu until the requester supplies the information and asks for approval again. The Approver field lists only users from your own approval group. Work notes on the Activity Stream tab give the audit trail, and a file can be attached there too.

Extension requests appear after more information has been requested. Approving one lets you edit the requested extension date, and rejecting one requires comments. The exception’s Details tab shows the Policy and Control Objective fields, and the Impacted Controls related list shows the impacted controls. For the exception rules on the desktop, see the policy exception guide.

Assigning indicator tasks, issues and remediation tasks

The three assignment applets under Team’s Unassigned Work hold work nobody has taken yet. Each links to different records, so check the context before assigning.

Indicator tasks relate to a Control record assigned to your compliance group. Swipe left, tap Assign, then Assigned to, and choose a user. Any user can be selected. Once assigned, the task leaves the list.

Issues offer Edit and Assign. For the wider concept, see the issue explainer. Edit includes an Extend by days field, and the number is added to the Duration field on the instance. Assign opens the Issue Assignment screen, where Assignment Group and Assigned to are set. The issue’s Details tab shows planned start and end dates, and expanding the Control Objective/Risk Statement and Control/Risk fields opens the linked records.

Remediation tasks follow the same model, with Extend by days and Assigned to on Edit and the same Issue Assignment screen on Assign. Their Details tab names the linked Issue. Check the issue’s planned dates before extending a remediation task, so the new duration matches the work left on the issue. For the wider concept, see the remediation task explainer.

Reassigning overdue attestations and issues

Team’s Overdue Work holds items that have slipped. To reassign an attestation, swipe left, tap Reassign, then tap Assigned to and pick a name or search for one. An attestation can also be reassigned from its own record through the top menu. For the wider concept, see the attestation explainer.

Overdue issues use the same Edit and reassign options, with one difference: the list shows only issues assigned to your assignment group. If an issue you expect is missing, check its group assignment first. Reassigning sets Assignment Group and Assigned to, confirmed with the Send icon or Submit. The Related List tab shows the issue’s remediation tasks, which is worth checking before a handover.

Narrowing long lists with filters

Tap the filter icon on any list, expand a field, and tick the options you want. Many filters accept several options. Tap Back or DONE to save each field. The match count appears at the top of the screen, and Clear or RESET restores the defaults. The intersection control combines criteria with AND, and the union control combines them with OR. The mobile filter works like the condition builder on the instance, so it will feel familiar to anyone who already filters lists on the desktop.

Frequently asked questions

Why do I not see the Policy and Compliance icons after I log in?

The app displays an application on the phone only after the setup tasks are complete, which means the core application and the GRC Mobile app are installed on that instance. Check the instance setup before troubleshooting the phone.

Who can I assign an indicator task to?

Any user can be chosen for an indicator task. Issues and remediation tasks use the Assignment Group and Assigned to fields, and the approver on a policy exception is limited to your own approval group.

Do I have to add a comment when I approve a request?

No. Comments are optional for approvals of policies and exceptions. Rejections need comments in both cases.

What happens after I ask the requester for more information on an exception?

The comment goes to the requester, and the exception cannot be approved from the menu until the requester provides the information and asks for approval again. Work notes on the Activity Stream tab keep the trail.

Does the mobile app need to match the instance version?

Yes. The GRC core applications and the GRC Mobile app should come from the same family release as the instance, so check the release family during setup. Install the most current Agent app from the Apple App Store or Google Play. For the wider policy and compliance picture, start from the policy and compliance hub.