OBLYTECH Logo
OBLYTECH Logo

Instance Observer Alerts and Notifications: Setup Guide

Instance Observer alerts tell an admin when a platform metric crosses a threshold. Setup has three parts: choose the alerts, attach a notification rule, then route that rule to email, SMS, another ServiceNow instance or an external tool. Key alerts add six moving-average metrics with thresholds drawn from the instance’s own history.

What Instance Observer alerts watch

Instance Observer, usually shortened to IO, covers platform health, performance and user experience.

Category Example alerts What it tracks
Transactions Transaction Increase, Response Time, Slow Queries Per Second Volume and speed of application transactions
Node health Node CPU time, Node memory, Node garbage collection time Strain on each application node
Database Database host health CPU, Standby replication lag, InnoDB row lock Query health and reliability of stored data
Scheduler and jobs Scheduler stuck, Long-running jobs, Thread running Whether the job engine is moving or blocked
Event queues and semaphores Default semaphore mean, Event queue check, ECC queue Backlogs in event handling and job throttling
Messaging and email AMB send queue depth, Outbound email, Inbound email The internal messaging bus and mail processing

Advanced and Total customers can configure the wider set of IO alerts. The most popular ones appear on the first page of the Configure Alerts page, under the All Alerts tab. An alert becomes active once you save its configuration. For a related view of instance health, see the Performance Analyzer guide.

Key alerts or individual alerts

Key alerts cover six metrics: transaction increase, transaction drop, instance response time, database response time, default semaphore mean and default semaphore queue depth. Each one compares a moving average, which captures the average change in a data series over time, with the historical median over a set period. IO works out the thresholds from that history and shows them as the IO recommended condition.

Key alerts are available for Advanced and Total packages. Eligibility also depends on a P-Score, an instance rating based on transaction count that rises when transactions stay consistently stable. The opt-in banner appears on instances that meet the required score. Other instances do not see it, and the score is refreshed regularly, so an instance that grows into eligibility will see the option later. Thresholds for eligible instances refresh automatically each week.

Individual alerts suit narrower questions. Guided tier customers receive six starter cards: Response Time (Instance), Event Queue, Database Response Time, Default Semaphore (Mean), Default Semaphore (Queue Depth) and Long Running Jobs. For these you set the condition, the threshold, the monitoring duration and a snooze time in five-minute increments, and Simulate Chart previews the result before you save. If an alert fires and you need to find out why the instance is slow, see the step-by-step diagnosis. For the job engine view itself, see the System Events and Scheduled Jobs Dashboard guide.

Set up key alerts on an instance

Key alerts need an admin role. Work through the steps in order.

  1. Open All, go to Impact, then Platform Health, then Monitor, and go to Instance Observer.
  2. Select Alerts, then Configure alerts, and choose Configure your alerts.
  3. In the Max alerts per day per metric drop-down, pick up to five alerts for each metric per day.
  4. Select Set Notification. The Default notification rule is preselected.
  5. Optionally select Configure Notification to create a custom rule.
  6. Select Review & Create, check the summary, then choose Create Alert or Set Notification.

The daily cap applies to each of the six metrics. Two alerts per metric gives a maximum of 12 a day across the set, and the count resets at 00:00 UTC.

Once submitted, all six key alerts switch on automatically. If one stays off, IO found no threshold for that metric because the instance has limited use of it. Open Edit alert configuration to see the thresholds. For the wider instance view, see the instance performance dashboard guide.

Build a notification rule

A rule answers three questions: who is told, through which channel, and under what name. Go to Alerts, then Configure Notification, and select Create Rule. The form asks for a name, a description, a notification type and recipients. Build the rule before the alert, because each alert must be tied to a notification.

Channel Who receives it Available on
Email All provisioned users with IO access, or custom addresses Advanced and Total
SMS All provisioned users, or specific users with phone numbers Total
ServiceNow A webhook that starts a workflow on a chosen instance Total
Third-party A webhook into an external monitoring or chat tool Total

ServiceNow Otto for SAM can also be a recipient when it is affiliated with your account. Each rule can be enabled by default or turned off, and you can keep several rules for different teams.

Send alerts to another ServiceNow instance

Routing to a second ServiceNow instance needs a webhook on the receiving side and an integration on the Instance Observer side. On the receiving instance, an admin creates a webhook and a web service through a scripted REST API. The webhook URL is for commercial instances only.

In IO, go to Alerts, then Configure Notification, and select Create Integration. The type defaults to ServiceNow. Enter a name, choose basic authentication or an API key, supply the credentials and paste the webhook URL.

Select Test Integration before you submit. A 200 response means the test passed, and a successful test is required to submit. If the URL is not yet to hand, save as a draft and finish later. A submitted integration shows the status Enabled.

Integrations with the Enabled status are the ones listed in the Notification Rules tab. Open the rule, select Edit, set the notification type to ServiceNow Integration, choose the integration and save. To check the route, open the Alert Console, select your instance, choose Get Snapshot, then pick an alert from the Generate Test Alert list. A Database Response Time test works well as a first check.

Send alerts to a third-party application

Third-party routing follows the same pattern. Choose Third-party as the integration type, enter the webhook URL from the external application, test it, submit it and link it to a rule with the notification type Third Party Integration. The integration is designed for platforms such as Slack, Microsoft Teams, AWS, Google Cloud Platform and Azure. Third-party integrations are not supported in Regulated Market.

Expired webhook URLs, invalid API keys and expired credentials can each cause a failed integration. A webhook URL can expire when a subscription lapses, and an API key can become invalid over time. Either change stops deliveries until the integration is fixed, but IO flags the failure in the Alert Console, in notification history and by email, so put each renewal date on a calendar.

Customize the alert payload

Each integration sends JSON built from a template. The default carries seven fields: alert number, alert type, alert name, alert time, instance, description and alert created. A template must hold between one and 20 keys, and it can include up to 13 custom parameters. Invalid JSON is highlighted and blocks saving.

Custom parameters can combine fields into a readable sentence. The editor offers Revert Changes, Reset to Default, a Syntax Validator and Test Integration. For third-party APIs that expect fixed key names, rename or remove keys so the body matches what the external system requires.

Fix a failed integration

An enabled integration can fail later because of an expired webhook URL, an invalid API key or expired credentials. IO flags the failure, and the Alert Type shows red in the Alert Console. Select the Failed link to read the error, such as a 404 that points to an invalid URL. Then select Update Integration, correct the details, test again and resubmit. Until the integration is enabled again, alert payloads are not delivered to that endpoint.

Failures appear in the Alert Console, in notification history and in an email with the error number. The Delete option stays inactive while a rule still uses the integration, so unlink it from the rule first. For general email delivery problems, see the email notifications not sending guide.

Read the notification banner and history

The bell icon on the Instance Observer banner announces new feature releases and alerts from Auriga, Self Service and Monitoring. The gear icon turns each type on or off. The pop-up shows up to 25 recent notifications, with older items moved to history. Unread notifications stay in history for 72 hours and read ones for seven days.

Alert emails carry the subject New Alert. Select the banner to open the threshold chart, then select Generate Root Cause to open the root cause correlation history. Choose an entry to see the summary and metric charts, drill into the affected node and job, and select Create a Case to submit the summary you have captured.

Frequently asked questions

Why don’t I see the banner to turn on key alerts?

The banner appears for instances that reach the required P-Score. The score is based on transaction volume and stability, and it is refreshed regularly, so the option can appear later as usage grows.

Why did one of the six key alerts stay off?

IO did not find a threshold for that metric because the instance has limited use of it. Open Edit alert configuration to see which thresholds are in place.

Can Advanced customers receive SMS alerts?

Advanced customers receive notifications by email. SMS, the ServiceNow webhook and third-party integrations are available to Total customers.

Why is an alert showing red in the Alert Console?

A red Alert Type means the payload could not be delivered. Open the Failed link to read the error, then update the integration with corrected details, test it and resubmit.

How many key alerts can I receive each day?

You can select up to five alerts per metric per day. With six key metrics, the maximum across the set is 30, and the count resets at 00:00 UTC.